Makes it possible for customers to; Focus on their core activities Expand through flexible production capacity Reduce their production costs Release tied-up capital UFAB in Uddevalla and Shanghai
UFAB i Uddevalla och Shanghai Develop – Manufacturing - Assembly High technical machines Turnover 2009; 11 MEUR Employees 2009; 40 Quality First! – ISO 9001: years experience – 1500 system Cost reduction – Lean Environmental - ISO 14001:2004
Mattsson Wind
Packaging
Technique put in system
Reference Assembly Quality - National Oilwell Varco Norway AS UFAB assemble and test complete units for offshore. Tests are made together with customer and delivery are made directly to oil platform.
Complexity - Tetra Recart UFAB assemble and test complete system with a capacity of packages an hour. Order lead time are 21 weeks where articles are manufactured, assembled and tested. Reference Assembly
Flexibility - Tetra Top UFAB delivers complete customer specified modules in tact without any delays. Order lead time are 15 working days and the assembly and final testing takes 500 hours per module. Reference Assembly
Referenser Montering Future - WindEn UFAB assemble wind turbines in the sizes 5,5 – 8 – 45 kw. These are used for private persons and farmyards and produces between and kw per year
Volume - VGB UFAB assemble and deliver 2000 snow chains to all big manufacturers of trucks and buses. Order lead time are between 1 and 5 days with 3000 different articles. Reference Assembly
Partnership - GE Healthcare UFAB has during two years been participating in the prototype phase together with the customer. Serial production has started and forecasted annual volume are 600 units. Reference Assembly
Reference Development Idea to Reality - GreenClip UFAB has for the customer developed an automatic labeling machine for high volume products. The assembly and installation at site has also been performed by UFAB.
Reference Development Mechanical development Ensure quality in development Easy to assemble Reduce manufacturing costs Assembly and test documentation Simulations ProEngineer, SolidWorks, AutoCAD, Framemaker Automation Electrical development PLC programming Siemens S7, Rockwell, GE FANUC Simulations Profibus (Siemens) Devicenet (Rockwell)
Future targets and commitments Quality First in all steps of the process 20 MEUR in turnover 2011 Workshop to manufacture parts in China 2010 Achieve all Key indicators and customer satisfaction 2010 Lean – Increase cross functional team work 2010
Summary System supplier with a Quality First approach Lean – value stream mapping and 5s for cost reduction 40 years experience systems delivered Developed supplier network and a workshop in China Quality and Environmental certificate ISO 9001 and ISO Strong position with the Mattsson Group