Makes it possible for customers to; Focus on their core activities Expand through flexible production capacity Reduce their production costs Release tied-up.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Institutional Presentation June/2011.
Presentation of UFAB. Agenda A contract manufacture within these areas of expertise Hours Hours Hours Hours.
Mapping Supply Chains Paul Justensen BusM 361 Brigham Young University.
Striving to exceed customer demands by delivering the best.
R&D Manufacturing Center. Company Introduction QIHAN is one of the leading factories engaged in developing and producing CCTV items in China,
Module 20 Pricing and Related Decisions. The Value Chain The set of value-producing activities that stretches from basic raw materials to the final consumer.
Saturn Electronics Corp. Offshore Sourcing. Overview High-Mix High Volume Diversified Supplier High-Mix High Volume Diversified Supplier.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
MSE507 Lean Manufacturing
UFAB in Uddevalla & Shanghai Makes it possible for our customers to: Focus on their core business Expand through flexible production capacity Reduce total.
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
IT Outsourcing Management
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Zamtel Call Centre Tender PreBid Workshop 10 th March 2014.
Building and Sustaining Total Quality Organizations
Chapter 3 Global Supply Chain Quality and
Improving Productivity & Quality
EProcurement at the University of Pennsylvania SciQuest “Find, Buy & Manage” Seminar Princeton, New Jersey October 23, 2003.
New Product Development (NPD) New product to grow market share or within overall strategic process of product life cycle Operations Management 8 Stages.
Value Stream Mapping.
Supply chain management in Regal Marine
Lean Manufacturing Auburn Engineering Value Stream Mapping By Bill Carver.
Director's Message Suri Auto Pvt Ltd is the name made to be the best, by hard work, dedication and team spirit; the highlights that enhance our ongoing.
HOSPITAL EXCELLENCE OPERATION MODEL Miguel Angel Moreno, Abraham Mendoza IIE Annual Conference and Expo 2014 Applied Solutions Sessions Montreal, Canada.
AMT Member Experiences in China Dukane Kinefac Bodine Market Update Breakfast – China September 8, 2006.
Actuation ▪ Valves ▪ Controls ▪ Service ▪ Expertise Custom Actuation Solutions Since 1973 Title 01/01/2012 Automated Valve & Control AVC.
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
Introduction to Quality, Cost & Delivery
Page 1/12 April 29th, 2005Amsterdam General Assembly Forum Didier LUX Airbus SVP Quality IAQG& Airbus Supply Chain Management.
Northeast Supply Chain Conference Sheraton Framingham Hotel Framingham, MA September 20, 2004 Dr. Marilyn Pelosi Western New England College Professor.
PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.
Dtengineering 1 of 16 The Product Development Process Introduction.
Chapter 6 Production Processes.
Makes it possible for customers to; Focus on their core activities Expand through flexible production capacity Reduce their total cost Release tied-up.
Industrial Engineering Roles In Industry
Purpose: These slides are for use with customers by the Microsoft Dynamics NAV sales force and partners. How to use: Add these slides to the core customer.
Oriflame Purchasing Management Workshop Module 4 – Project Team Development Oriflame Vision & Strategy Supplier Interfaces The Business Model Supply Vision.
Using Outsourcing Partner’s Competence to Succeed During the Downturn 3 November 2009 Kaatsheuvel, The Netherlands Ulad Radkevitch, PhD VP marketing, sales.
More Construction for the Money “Back to the Future” Jim Porter 2004 Recipient Carroll H. Dunn Award of Excellence.
Supplier Excellence Alliance Leadership Communication Process 8/8/11 Vaupell represented by: Keith Zeiler, General Manager (Champion) Guy Sykes,
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Chapter 17 Performance Development Management 1e Management 1e Management 1e - 2 Management 1e Learning Objectives  Explain how managers.
LEAX Group in Latvia Jan Geier, Vice President “The day we stop getting better is the day we stop being good“
Southwold Enterprises Co.,Ltd. An outsourcing partner committed to your company.
Team Development Slide 1 © The Delos Partnership 2005 Supplier Relationship Management Module 4 – Project Team Development Vision & Strategy Supplier Interfaces.
INTRODUCTION The company started the production of metal products in 1992 and prefabricated modular buildings in Harmet’s product range includes.
 Project management is the organization and management of resources (i.e. people, information, tools and machines, materials, time, capital and energy)
Manufacturing Advisory Service South-West Jon Hurrell.
Your Clear Choice for a Key Strategic Supplier Corporate Profile.
Wind, Wind Power and Vestas Implementation of Wind Power.
1 National Wind Technology Center Wind Turbine Design According to IEC (Onshore) and -3 (Offshore) Standards Overview for NWTC November 8, 2005.
The PV industry need for innovation, standardisation and dependability Future Energies Event, Paris, 14 April 2008.
 Copyright, Ansari, Bell, Klammer and Lawrence, Management Accounting: A Strategic Focus, Irwin-McGraw-Hill, Production Methods v Craft v Mass v.
9-1 Production Systems Chapter Chapter 9 Objectives After studying this chapter, you will be able to: Explain the systems perspective and identify.
ТBМ-Logicon Logistic and Information Integration with Suppliers.
1 © The Delos Partnership 2003 Global Strategic and Operations Planning Initial Site Education.
Vestas.com Texas/European Union Wind Energy Symposium October 2009 Dr. Carsten Hein Westergaard Vestas Technology R&D Americas, Inc.
Gulay Litchfield For CQI-TECH PLC
INTRODUCTION TO SUPPLY CHAIN MANAGEMENT. What is a Supply Chain? A supply chain consists of the flow of products and services from: Raw materials manufacturers.
Fieldbus Foundation General Assembly 2008 Project Planning and Execution Mike Downey Jacobs Engineering.
KAT Controls Pvt. Ltd. Blumenbecker KAT Automation Pvt. Ltd. Pune, June 2011.
Global Industrial Logistics Robots Market Size, Share, Global Trends, Analysis, Research Report and Forecast, Market.
Manufacturing Management Prayash Neupane. Manufacturing Management MM refers to all aspects of the product manufacturing process. From assembly design.
Chapter 7: Manufacturing Processes
Pricing and Related Decisions
ERDF Sustainable Advanced Manufacturing SME Support Programme
from ideation to design and realization
while introducing and de-risking new technologies in parallel
Presentation transcript:

Makes it possible for customers to; Focus on their core activities Expand through flexible production capacity Reduce their production costs Release tied-up capital UFAB in Uddevalla and Shanghai

UFAB i Uddevalla och Shanghai Develop – Manufacturing - Assembly High technical machines Turnover 2009; 11 MEUR Employees 2009; 40 Quality First! – ISO 9001: years experience – 1500 system Cost reduction – Lean Environmental - ISO 14001:2004

Mattsson Wind

Packaging

Technique put in system

Reference Assembly Quality - National Oilwell Varco Norway AS UFAB assemble and test complete units for offshore. Tests are made together with customer and delivery are made directly to oil platform.

Complexity - Tetra Recart UFAB assemble and test complete system with a capacity of packages an hour. Order lead time are 21 weeks where articles are manufactured, assembled and tested. Reference Assembly

Flexibility - Tetra Top UFAB delivers complete customer specified modules in tact without any delays. Order lead time are 15 working days and the assembly and final testing takes 500 hours per module. Reference Assembly

Referenser Montering Future - WindEn UFAB assemble wind turbines in the sizes 5,5 – 8 – 45 kw. These are used for private persons and farmyards and produces between and kw per year

Volume - VGB UFAB assemble and deliver 2000 snow chains to all big manufacturers of trucks and buses. Order lead time are between 1 and 5 days with 3000 different articles. Reference Assembly

Partnership - GE Healthcare UFAB has during two years been participating in the prototype phase together with the customer. Serial production has started and forecasted annual volume are 600 units. Reference Assembly

Reference Development Idea to Reality - GreenClip UFAB has for the customer developed an automatic labeling machine for high volume products. The assembly and installation at site has also been performed by UFAB.

Reference Development Mechanical development Ensure quality in development Easy to assemble Reduce manufacturing costs Assembly and test documentation Simulations ProEngineer, SolidWorks, AutoCAD, Framemaker Automation Electrical development PLC programming Siemens S7, Rockwell, GE FANUC Simulations Profibus (Siemens) Devicenet (Rockwell)

Future targets and commitments Quality First in all steps of the process 20 MEUR in turnover 2011 Workshop to manufacture parts in China 2010 Achieve all Key indicators and customer satisfaction 2010 Lean – Increase cross functional team work 2010

Summary System supplier with a Quality First approach Lean – value stream mapping and 5s for cost reduction 40 years experience systems delivered Developed supplier network and a workshop in China Quality and Environmental certificate ISO 9001 and ISO Strong position with the Mattsson Group