Indiana Subcontractor Association (ISA) and TURNER Butler Hinkle Fieldhouse Renovation project rollout Thursday, 1-24-13 at Hinkle Fieldhouse.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Project Planning: Assembling a Mortenson “Integrated Work Plan”
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
TAKING IT ALL IN BEFORE YOU TAKE-OFF Presented by Kathy McCauley October 10, 2014.
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
Skyscraper Construction
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
PINOLE VALLEY HIGH SCHOOL FACILITIES SUBCOMMITTEE MEETING December 13, 2011.
Arlington Elementary – Renovation Architect: RossTarrant Architects General Contractor: W/S Construction Substantial Completion Date:August, 2010 Contract.
JHS New Football Field/Stadium Enhancements Proposal Jasper School Board
TULLIO ARENA EXPANSION & RENOVATION Project Information Meeting Thursday, August 26, :00 – 3:30 pm Please sign in on the attendance sheet.
Facilities & Capital Construction Program Overview Program Overview Project & Scope Schedule Alternative & Traditional Procedure Approaches E-Builder.
SCHEMATIC DESIGN PRESENTATION
Kenmore -Town of Tonawanda Union Free School District PHASE 2 CAPITAL PROJECT DEVELOPMENT PRESENTATION We educate, prepare, and inspire all students to.
Proposed Athletic Facility Renovations to East Hartford High School Albert Costa-Director/Facilities 1 Expectations Matter Effort Matters Competence Matters.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
Recycle North Building Renovation and Design Senior Capstone Design Project Civil and Environmental Engineering Scott Hamshaw Presenting.
ESTIMATING By Laith Jacob.
Bay Elementary School Historical School Site (1938)
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Mount Michael S.A.M.E Team #1 HOME FIELD ADVANTAGE 2.0.
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Board of Education Work Session July 10, 2014 We promise to put children first!
Lone Star College-Kingwood Recreational Sports Program.
Western Carolina University Town Hall Meeting May 6, 2003 Chuck Wooten Vice Chancellor for Administration and Finance.
Facilities Modernization Program Funded by Measure B Project Report April 19, 2010.
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
Galesburg C USD 205 · PSA–Dewberry · Russell Construction Company · Metzger Johnson IEFM Engineering · Bruner, Cooper & Zuck · Johnson Building Systems.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
California State University, Sacramento Facilities Services May 19, 2008.
SMHa/CGD/TT c r o s s h i g h s c h o o l b e r k e l e y c o u n t y s c h o o l s addition + renovations phase 2.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
WESTERN CAROLINA UNIVERSITY DEPARTMENT OF INTERCOLLEGIATE ATHLETICS FISCAL YEAR BUDGET.
Group A. Kevin O’Connell  Graduated Manhattan College 2014 Civil Engineering  Recently began working in scheduling  Sports: Jets Mets Knicks Rangers.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Athletic Department March 13, 2010 TCF Volunteers Conference Citadel Athletics.
Miller Driscoll Building Committee Update Tuesday, January 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations Miller-Driscoll.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Miller Driscoll Building Committee Construction Update Thursday February 4, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions &
San Mateo – Foster City School District
Ventura Community College District
Building Services Summer 2016 Update
CAM CONSTRUCTION 21st Century School Buildings Plan
Addition of Fire Alarm system. None existing.
2016 FCS Bond Project #5 Franklinton Middle School - Elevator & Toilet Renovation, H/C Exterior Ramp Scope: This project will upgrade the existing middle.
Lone Star College-Kingwood Recreational Sports Program
Woodbrook ES Addition & Modernization
(Refer to Chapter 2 of the textbook)
ELYRIA MULTI-SPORT ATHLETIC COMPLEX
David Anderson Mechanical Option
Facilities Update November 17, 2017
9/18/2018 Bids CONTRACTING Khamis…..
Graduate Circle Housing Proposal for the Pennsylvania State University
Council Rock High School South
Huntsville City Schools Huntsville High School Softball
Extra-Curricular Program Design Athletics/Music/Recreation
Troy School District Bond Program – Series 1 Construction Update
2007 Bond Issue Capital Improvement Program
Meeting of the LCLS Facilities Advisory Committee
NEW BASEBALL STADIUM Building a Legacy.
Huntsville High School Softball Program Upgrades
Huntsville High School Sports Lighting Upgrades
LCS Athletic Update Board of Education Meeting August 7, 2019
Presentation transcript:

Indiana Subcontractor Association (ISA) and TURNER Butler Hinkle Fieldhouse Renovation project rollout Thursday, at Hinkle Fieldhouse

Project Team Introductions Butler University: – Barry Collier – Athletic Director – Craig Hardee – Project Manager – Rich Michal – Director of Facilities – Amanda Duenges – Engineering manager

Project Team Introductions Architect/ Engineer: – Brock Roseberry – Ratio Architects Associate – Tom Durkin – DVPE Mechanical Engineer – Al Villalta – DVPE Electrical Engineer – David Lach – Cripe Civil Engineer – Victoria Emery – Arsee Structural Engineer

Project Team Introductions Construction Manager – Bob Bursack – Project Executive – Tom Schmitt – Chief Estimator – Jeff Johnson – Project Superintendent – Milaina Thompson – Project Engineer

Project Background The historic Hinkle Fieldhouse is home to Butler Bulldog basketball, as well as other division 1 sports and with the recent success in national basketball tournaments has decided to renovate most of the fieldhouse locker rooms, athletic offices, concessions, alumni club, weight room, sports medicine facilities, restrooms, etc. Hinkle Fieldhouse was originally built in 1928.

Project Goal For Butler University Athletics to upgrade most of the athletic and classroom areas in Hinkle Fieldhouse. The Fieldhouse is home to BB, VB, football, baseball, softball, golf, tennis and campus PE. Butler athletics is committed to keeping the original aesthetic look while improving areas. The renovation will enhance 1) The student athlete experience and building life and 2) The fan experience and athletic office improvements.

Contractor/ Supplier information Safety program highlights – Turner prequal requirements process – Safety program/ Procedures manual review LEED silver accredidation goal Diversity goals Site/ Interior phasing and logistics

Site logistics

Phasing Plan (insert)

Bidding scope and schedule BG1 – demolition, concrete, steel, elevator, site utilities – distribute , bid BG2 – Arch, MEPFP, interior selective demolition – distribute , bid Grade beam distribution system for bid invitation and bid form/scope of work Invited bid list Plan copy shop available - Reprographics Planned addendums

Project summary schedule