1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Advertisements

SBA Unit 8B: Building Commissioning Prepared By: David J Ellner, PE.
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
Building Commissioning
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Operations Erik D. Johnson, Deputy ALD for Programs NSLS-II Project Advisory Committee February 8-9, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities LEED-ESH-Facility Utilization May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement Anthony Guadagni Procurement Manager NSLS-II Project Advisory Committee Meeting December 10.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Steve Sawch Asst. Director, Construction Management NSLS-II CF Construction Preparations May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
HSS Inspection of Environment, Safety, and Health Programs at BNL Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Procurements Thomas C. Nehring, PE Lead Electrical Engineer Conventional Facilities Advisory Committee - Review.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
David Saenz EIR Review Oct 9-11, Conventional Facilities (CF) WBS 1.9 ETC and Methodology David Saenz CF Systems Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Ross Parkman PE Ryan Wester PE Central Chiller Plant Experience Big Ten and Friends Mechanical and Energy Engineering Conference October 1, 2013.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Western Michigan University Central Power Plant
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Meeting of the LCLS Facilities Advisory Committee
Department Of Energy Review Linac Coherent Light Source Project
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities National Synchrotron Light Source – II Project October 18, 2006

2 BROOKHAVEN SCIENCE ASSOCIATES Outline CF Organization Design Activities Construction Packages Procurement Methodology (covered by D. Dale) Construction Management ESH Management Commissioning

3 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Organization Director Conventional Facilities Marty Fallier Conventional Facilities Engineering Staff & WBS Managers Design A/E T-I, I, III TBD [C] Deputy Director Conventional Facilities TBD Commissioning Contractor TBD [C] CF Project Architect TBD CF Mech. Engineer TBD CF Civil/Struct. Engr. TBD CF Elect. Engineer TBD Plant EngineeringECS Support Team J. Mills [M] PE Project Architect T. McEvaddy [M] PE Mech. Engineer G. Leskody [M] PE Civil/Struct. Engr. T. Joos [M] PE Elect. Engineer D. Danseglio [M] PE Sr Mech. Engineer C. Channing [M] PE Trade Shop Support – Various [M] Design A/E Subconsultants [C] Construction Manager Agent CM – TBD [C] Site Prep Contractor [C] Precast Contractor [C] Ring Bldg Contractor [C] CHW Contractor [C] [M] – Matrixed [C] - Contracted

4 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities WBS

5 BROOKHAVEN SCIENCE ASSOCIATES Design Activities CF design will be by competitively selected A/E A/E selection underway – contract ready for award prior to CD-1 Will perform T-I & II with option for T-III support Responsible for design of all bldgs and utilities Must design to cost & provide construction estimates Design for LEED certification PE Engineering & Construction Services will provide design & utility coordination support Provide interface for existing utility systems Provide QA review and verification of compliance with BNL stds Coordinate BNL trade craft support during design and construction

6 BROOKHAVEN SCIENCE ASSOCIATES Design Activities cont ’ d Construction Manager will be competitively selected Contract award planned for early in T-I Will be an agent CM contract Provide constructability review, independent estimate, value engineering and market analysis support Will provide services during T-I &II design Commisioning agent will be competitively selected Contract award in T-I Provide HVAC and I&C design review Prepare Cx plan

7 BROOKHAVEN SCIENCE ASSOCIATES Construction Packages Pre-cast shield-wall early procurement – during T-II Enables reduction in Ring bldg construction duration Potential for better QA on shieldwall – uniform density Need to verify cost and structural tradeoffs are acceptablre during T-I Site Preparation early procurement – during T-II Enables reduction in Ring bldg construction duration Reduces risk associated with existing site conditions Provides more time to deal with unforseen earthwork issues Provides longer settlement & compaction time

8 BROOKHAVEN SCIENCE ASSOCIATES Construction Packages cont ’ d Ring Bldg/CLOB/LOB contract Work will be phased to support accelerator installation schedule Package will be as self contained as possible Should include CHW piping, process water clg tower & LN2 system Chilled Water Plant Expansion Expansion contract shared with Lab 3 chillers for NSLS II, 1 for BNL Integrated Control & Communication Could be performed by tech group or ctrls contractor Standard Equipment Several OFE items & furnish and install contracts

9 BROOKHAVEN SCIENCE ASSOCIATES Construction Management NSLS II WBS Managers responsible for performance CM will provide field inspection and coordination services Oversight of contractor performance of contract QA, Construction safety, testing, schedule, RFI ’ s, CO ’ s, Invoice review A/E will provide home office support Engineer of record, shop dwg review, ECN ’ s, periodic inspection, RFI ’ s PE Engineering and construction Services and Trade crafts Utility interconnect support, shutdowns, start-ups, permits Cx contractor - checkout and startup of systems Document test results & performance, training & documentation for operating staff, info for LEED certification

10 BROOKHAVEN SCIENCE ASSOCIATES ESH Management CF has the following responsibilities for ESH during the project: Design to code and include engineered safety features to mitigate hazards identified in PHA Coordinate review and input to design by ESH SME ’ s Comply with environmental regulations and stay within operating envelope of the NEPA review (EA) and FONSI Incorporate sustainable design features and maximize sustainability within budget and operational limits (LEED Certification & possible silver rating) Select contractors that have above average safety performance Implement an effective construction safety program with 0 injury goal Document and test all systems to verify safe and efficient performance

11 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Cx contractor - Implements commissioning plan during construction Periodic site visits during installation Document test results & performance Follow thru on non-compliant results Prepares training & documentation for operating staff Provides info for LEED certification Provides post operation follow-up to verify performance NSLS II CF Team Assures As-built documents & system tests are completed Verifies operating & maintenance documents prepared & staff trained Coordinates beneficial occupancy Supports Operational Readiness as Accelerator & Exp. Systems are completed