LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: 819346 Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.

Slides:



Advertisements
Similar presentations
LHC ACCESS SYSTEM 1 Edms: LAAWG Status Report – 10th July 2007 P. Ninin, L. Scibile, T. Ladzinski.
Advertisements

Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
O. Beltramello ATLAS experimental cavern Patrol Procedure LAAWG – October 07 O. Beltramello.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
LHC Hardware Commissioning Review May 2005 T.Pettersson - EDMS: TS Department Utilities Safety Access SU - a plea for co-ordination of co-activities.
05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Managing the LHC Experimental Area Point 5, CMS: Martin Gastal (PH/CME) Point 1, ATLAS: François Butin (TS/LEA) Point 2, Alice: Sebastien Evrard (TS/LEA)
Dismantling LEP and the Experiments Access to the underground areas, project organisation, coordination and safety.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire R. Trant HSE Unit for ACCU Meeting R. Trant.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
For more info:
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
Schedule IT General Schedule 9 th, September 09 Today.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Access system global tests M. Gruwé LHCCWG January 15 th 2007.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
External Data and DIP Oliver Holme 18 th January 2008.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Access system LHC-SPS M. Gruwé and J. Ridewood OP days March 18 th 2008.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
(Access system for HWC)
SPS Personnel Protection System Renovation Project
Some arrangements for personnel safety 1- Procedures for access
Safety Systems for ALICE
CENF – Personnel Protection System Preliminary Study
CENF – Personnel Protection System Preliminary Study
Evolution and future of the Access safety and control systems
LAAWG Status Report – 15th May 2007
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
M.Tavlet, H.Taureg - ALICE
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
Workshop on Accelerator Operations
Assumption for a given sector
Machine Protection PLC Based System Verification and Validation Plan
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Access Control for CERN Experimental Areas
Powering and Safety day Underground access during powering tests
Presentation transcript:

LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile T. Ladzinski

LHC ACCESS SYSTEM 2 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Scope LHC Access Control System LACS Off-the-shelf Access Equipement LHC Access Safety System LASS Interlock System Beam => No Access Access => No Beam (Nuclear category) Integrated concept for LHC Machine & Experiments to protect people against the LHC radiation hazards. Each Experiment is one single Access sector

LHC ACCESS SYSTEM 3 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Scope of supply to the Experiments Provision of a access control and safety system. This system consists of: Grids Locks Personal and material access points, Patrol system Monitoring software Machine Interlock system.

LHC ACCESS SYSTEM 4 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: LHC Underground areas classification

LHC ACCESS SYSTEM 5 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access to future interlocked areas The LHC sites access control systems The LHC buildings access control systems the LHC experimental services areas access control systems: for ACCESSIBLE areas during beam operation Special for the LHC INSTALLATION period only!

LHC ACCESS SYSTEM 6 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: the LHC accelerator and experiment access control systems: For NON ACCESSIBLE areas during beam operation The LHC sites access control systems The LHC buildings access control systems the LHC experimental services areas access control systems: for ACCESSIBLE areas during beam operation In LHC OPERATION ?

LHC ACCESS SYSTEM 7 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: From card to dosimeter - the plan is: During LHC Installation -New LHC Access control system gradually operational in pit access points (and elsewhere) Operational in PM85, PM76, PM45 -Renewal of the Access points of the non-interlocked areas will be done after LHC start-up Minimized perturbation for users -Renew their access card (Bat 55) -No Biometry Assistance provided by the CSA & CCC For LHC Operation -Biometry enrolment will start in June 07 -Access badge integrated into the dosimeter -Delivered in Bat55

LHC ACCESS SYSTEM 8 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: LHC Access Control System Goals: Control access to the LHC installation (INB) Manage users’ access rights Identify user Verify authorization Automatic or remote access control Status: -LHC4 : PM45 access point under test, UJ43 & UJ47 installation completed -LHC5: Preparation of the installation -LHC 8: installation completed and local acceptance test started

LHC ACCESS SYSTEM 9 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: LHC Access as seen by the Experiments Local Experiment Room Access Console -Allows the experiment to operate their access points in only in Restricted Access mode, after delegation by the CCC -Remote supervision includes audio and video Software interface is available to get information from the Access system about User entry/exit and Operational states.

LHC ACCESS SYSTEM 10 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: LES MODES D’ EXPLOITATION Ghislain Roy - Louis. Hammouti FAISCEAU LHC FAISCEAU TI2FAISCEAU TI8 Mode ACCES LHC Mode ACCES Pt 2Mode ACCES Pt 8 Acces tunnel (sites 1, 6) Acces tunnel (site 2) Delegation ALICE Delegation Atlas, CMS Delegation LHC_B Acces tunnel (site 8) Delegation RF M.A.- E.ST. Acces tunnel Hors zone RF (site 4) M.A. -RF Acces RF Acces LHC-BAcces service (site 8) Acces AliceAcces service (site 2) Acces service (sites 1, 4, 6) Acces tunnel (sites 3, 5, 7) Acces experience Atlas, CMS

LHC ACCESS SYSTEM 11 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: LE PUPITRE DE CONTROLE Ghislain Roy - Louis. Hammouti

LHC ACCESS SYSTEM 12 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Delegation Synchronised operation from XCR and CCC Only the Access requests are re-routed to XCR (No control of any Machine related element). Audio & Video control Delegation cancelled by a LASS VETO or by the CCC

LHC ACCESS SYSTEM 13 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: LHC Access Safety System Goals: Protect personnel during Beam operation -nobody inside - Stop LHC if a door is forced Allow Access operation when safety conditions are met -No radiation hazards (LHC beam, RF). Nuclear Safety system -Audits by the French Nuclear Authority INB Status: -Successful Factory acceptance of the CCR and LHC8 racks -LHC4 – LHC5 rack design and fabrication started -Ongoing Cabling verification in LHC5 -Installation of the LHC8 racks completed and on going in CCR

LHC ACCESS SYSTEM 14 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: LHC8 - LHCb Installation completed Patrol definition done LHC8 Functional tests starting mid-February LACS console in XCR – June 07

LHC ACCESS SYSTEM 15 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Layout of LHCb in UX85 Area

LHC ACCESS SYSTEM 16 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: LHC5 - CMS Access safety aspects managed by the LASS -Safety of the underground UX area (sector 12) Any entry into this zone SHALL be detected by the system. No unmonitored “holes” may exist… Patrol definition done Installation: 18/02- 15/04 -Constraints ? LHC5 functional testing 15/04 – 27 April LACS console in XCR – June 07 Sectorisation completed

LHC ACCESS SYSTEM 17 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS:

LHC ACCESS SYSTEM 18 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: LHC1-ATLAS Access safety aspects managed by the LASS and the SSA for the Patrol aspects. ATLAS detector is patrolled by ATLAS. -Cfr Elena’s slideshow Installation: 26/02- 27/04 -Constraints ? LHC1 functional testing 15/04 – 27 April LACS console in XCR – June 07 Most of grids in place, TE 14 & 16 will be relocate Installation of UPX16 & ULX15 could start end of February -To be coordinated between us and you!

LHC ACCESS SYSTEM 19 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS:

LHC ACCESS SYSTEM 20 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS:

LHC ACCESS SYSTEM 21 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: LHC2- ALICE Installation and commissioning planned for the summer 07 Patrol definition planned for the 21/02

LHC ACCESS SYSTEM 22 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: LHC2- ALICE

LHC ACCESS SYSTEM 23 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access via PX24

LHC ACCESS SYSTEM 24 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Conclusion Good progress – despite a hesitant Contractor. Expect to be ready as planned (Master Schedule) Co-ordination with the Experiments: we need a better definition of linkmen for different aspects. Presently we are sometimes grasping for the right person…(wastes our and your time). Operational issues - only discussions with the Machine. Any Experimental point of view?