Community Development Department Construction Phase BULLDOG DRIVE.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Cost Estimation System Tool
State of Morrisville Mayor Mark Stohlman July 17, 2014.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
1 S.R. 426/C.R. 419 Project Update City Council Work Session November 13, 2006.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AREA Property Acquisitions June 15, 2010 Presentation for SR 100 Board/City Council Meeting.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
State Highway 6 Corridor Access Plan. SH 6 Project Description Project Initiated and funded by –City of Houston –Missouri City –City of Sugar Land –Harris.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Community Development Department PINE LAKES PARKWAY NORTH ROADWAY IMPROVEMENTS.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AREA Bulldog Drive Right-of-Way Acquisition Status March 9, 2010 Presentation for City Council Workshop.
Community Development Department Construction Phase.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
STATE ROAD 100 CRA FY 2012/2013 Annual Report October 29, 2013 Workshop.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Community Development Department JOINT PARTICIPATION AGREEMENT WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION For LANDSCAPE AND IRRIGATION IMPROVEMENTS.
Maintenance Agreement with Town Center At Palm Coast Community Development District City Council Workshop February 10, 2015.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
STATE ROAD 100 CRA Update to City Council November 13, 2012 Workshop.
Transportation Projects City Council Workshop May 14, 2013.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Community Development Department Royal Palms Parkway City Council Workshop July 29, 2014.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
INTERNATIONAL DRIVE CRA FY Budget Worksession July 11, 2011.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Rules of the Road. I. Traffic Lights – must be obeyed unless a police officer directs otherwise.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Status & Right-of-Way Acquisition
Urban Renewal and Tax Increment Financing
UTILITY DESIGN SERVICES
District 3 Complete Streets Projects
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
River to Sea TPO Meeting US 92/International Speedway Boulevard
Kerr Tar Project Update – June 2016
Citrus Park Drive Extension
North Main Street Intersection Improvements at Route 460 Bypass
SE 12th Street Roadway Improvements February 8, 2005.
Lyle Parkway to SR 540 (Winter Lake Road)
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Project Location: 35th Ave HSIP8
Presentation transcript:

Community Development Department Construction Phase BULLDOG DRIVE

Community Development Department PROJECT LIMITS

Community Development Department Bulldog Drive ultimately will be widened from a 2-lane undivided, rural typical section to a 4-lane divided, urban typical section with a landscape median. The interim phase will be a 2-lane reconstruction with turn lane, stormwater system improvements, turn lanes and signal replacement on SR100, and improvements at high school site due to improvements on Bulldog and SR100. PROJECT SUMMARY

Community Development Department Stormwater Improvements (reduce flooding of school site) Improve safety for vehicles and pedestrians. –Shift main high school entrance west to alleviate back-ups into the bulldog drive/SR100 intersection. –Provide right turn lanes on SR100 onto Bulldog Dr. and high school entrances. –Provide turn lane on Bulldog for left turn into high school site. –Provide a 10-foot sidewalk along the west side of Bulldog Drive. Reconstruction of Bulldog/SR100 intersection –Replace string pole signal with a new mast arm signal. –Roadway improvements for the ultimate configuration: Right turn lane on bulldog onto SR100 and two left turn lanes onto SR100. Extend existing left turn lane on SR100 onto Bulldog Drive. Extension of street lighting. Enhanced Landscaping and re-use irrigation. PROJECT BENEFITS

Community Development Department Short-Term vs. Long Term Needs Short Term: Current Safety Issues –School Circulation –Intersection & Turning Movements (SR100 & Bulldog) Stormwater Issues (Flooding) Long-Term: ( Growth Not Occurring as Anticipated ) Additional Roadway Capacity Solution = Phased Approach Phase 1: (Address Current Safety & Stormwater Issues) School Circulation Intersection & Turning Movements Stormwater Issues Phase 2 – (Address Capacity Issues) 4 Lanes at Later Date – TBD PROJECT PHASING

Community Development Department PROJECT PHASING

Community Development Department PROJECT LAYOUT

Community Development Department CITY COUNCIL ACTION a)Construction Inspection (CEI) Change Order  Stantec$ 263, b)FPL Street Light Agreement (Not-To-Exceed)  Street Light Agreement$ 300, c)Construction Contract  P&S Paving$ 4,267,  Contingency$ 200,000.00

Community Development Department CITY COUNCIL ACTION d)Right-of-Way Map for Bulldog Drive

Community Development Department CITY COUNCIL ACTION e)Easement for Town Center CDD (2,077sf)

Community Development Department CITY COUNCIL ACTION f)Easement for FPL Utilities

Community Development Department CRA Budget

Community Development Department State Road 100 Corridor Community Redevelopment Agency (SR100 CRA) Actual: $5,031,251 Revised Budget: $5,032,000 Bulldog Drive: $4,675,000 Transfer from Land: $357,000 CONSTRUCTION PHASE FUNDING