The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.

Slides:



Advertisements
Similar presentations
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Advertisements

SUSTAINABLE COMMUNITY PLAN - An Introduction Presentation to Planning and Development Committee – February 16,
1 Service Providers Capacity Assessment Framework Presentation to the Service Delivery Advisory Group August 28, 2008.
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
Dr Chris Boomer Development Plans Manager (DoE Northern Ireland)
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
Presented by: ECONorthwest December 15, Agenda Introductions (10 minutes) Overview of the project (30 minutes) Presentation by ECONorthwest Role.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
COUNCILLORS, MAYOR & ADMINISTRATOR ROLES and RESPONSIBILITIES.
Transit Capital & Operating Priorities Municipal Capital Project Priorities Municipal Policy Document Related Planning Activities 2 VIA 2040 Plan COSA.
Planning and Localism – How it can work for you John King Friends of the Peak District
MEA Class EA Requirements to support a new Sewage Treatment Facility May, 2013.
Langdon Parish Council Site Allocation Consultation Two sites at East Langdon One site at Green Lane, Martin Mill.
LOCAL BUFFER SUPPORT PROGRAM 1 May 2014 MAV. Liveability, growth and waste As Melbourne continues to grow, we need secure the right mix of resource recovery.
UW Cooperative Extension Land Use Education Programs Comprehensive Planning Overview March 15th Osceola WI Polk County UWEX-Cooperative Extension.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Climate Change Council November 2011 draft ACT Planning Strategy.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Chapter 8 – The Comprehensive Plan 10/3/ The Goals of Comprehensive Planning  Comprehensive plans are usually prepared for a period of 20 years.
Vaal University of Technology (formerly Vaal Triangle Technikon ) Ms A.J. GOZO Senior Director: Library and Information Services.
Jeff’s slides. Transportation Kitchener Transportation Master Plan Define and prioritize a transportation network that is supportive of all modes of.
Georgia’s Water Plan June 17, /09/08 Page 2 Agenda Plan Development Plan Overview.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
Growth Management Legislative Discussion March 20, 2012.
Seminar "Imovinski standard", 29. i 30. lipnja Spatial Planning in Ireland Farannán Tannam, MRICS, Dip.A&F.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Statewide Strategies for Coordinating Regional Transportation and Land Use Planning Katie Benouar, Senior Transportation Planner Office of Regional and.
Planning and Community Development Department Housing Element City Council February 03, 2014.
The Local Development Framework and other Planning matters Presentation to the Bradford Property Forum 19 June 2007.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Infrastructure planning Sustainable Development Partnership 21 April 2009 Sustainable Development Partnership work programme discussion Designing the social,
WRITING A BETTER PURPOSE AND NEED A COMMON SENSE APPROACH Kevin E. Davis Environmental Supervisor ODOT-OES.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
Amherst County Comprehensive Plan (Update)
Neighbourhood Planning Miles Thompson Shared Planning Policy Manager South Oxfordshire and Vale of White Horse District Councils
Central Lancashire Preferred Core Strategy Your local councils working together to plan for a better future for everyone.
The Wealden Core Strategy 24 November What does a Core Strategy do? Key component of the LDF and sets the direction of policy and change over next.
Growth Management Legislative Discussion: Transportation Concurrency April 24, 2012 Growth Management Legislative Discussion: Transportation Concurrency.
200/768_K 0 Sustainable Growth & Development Subcommittee Report Committee for a Sustainable Emerald Coast May 17, 2007.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON THE OVERVIEW OF THE NDPW PRESENTED BY THE TOP MANAGEMENT COMMITTEE 26 MAY 2004.
Growth Management Legislative Discussion June 19, 2012 Growth Management Legislative Discussion June 19, 2012.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
San Diego Regional Comprehensive Plan Presentation to Senate Transportation and Housing Committee February 8, 2005.
Local Authorities & Other Squeaky Wheels. Squeaky Wheels “The squeaky wheel does get the oil in the presence of positive supporting evidence rather than.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Working with Municipal Planners: A Window of Opportunity Kim Bergeron, PhD Candidate Queen’s University PARC Symposium March 4, 2008 Toronto, Ontario.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
UDIA HOT TOPICS – STRUCTURE PLANNING REFORM & LIVEABLE NEIGHBOURHOODS REVIEW 26 SEPTEMBER 2012 PAUL ELLENBROEK PROJECT MANAGER – LIVEABLE NEIGHBOURHOODS.
Sustainability Principles for Land Use and Mobility Approved by City Council – January 2007.
Health and Community Working Group November 20, 2014.
Planning Commission Study Session: Preferred Plan July 23, 2015.
DRAFT INNER MELBOURNE ACTION PLAN Presented by Elissa McElroy IMAP Executive Officer January 2016.
Airdrie Land Use Bylaw Presentation to City Council May 2, 2016.
MHPP Forum James Shuttleworth Planning and Infrastructure Manager, MCC 9 December 2015 Greater Manchester Spatial Framework.
1 Meeting Agenda. Part I : Provide Information Presentation. Part II : Get your Comments Main Question Survey. Part.
City Council – Project Update September 14, 2015.
‘People, Homes and Jobs’ Local Plan Consultation 2015 PPCLG 27 January 2016.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Phillipa Silcock Using and discharging conditions.
Planning Commission Ian Macek May 26, 2016 Freight Master Plan.
OFFICIAL PLAN 5-YEAR REVIEW & TAKE ACTION FOR SUSTAINABLE HURON.
Buena Park General Plan Update Overview Presentation.
Municipal Class Environmental Assessment
Manchester Master Plan Committee (MPC) Planning Framework
Loddon Campaspe Integrated Transport Strategy
Goal #3: Create Great New Places Strategy A: Update Strategic and Policy Documents to Accommodate New Growth through Compact and Contiguous Development.
Loddon Campaspe Integrated Transport Strategy
Administration and Corporate Services
Slide Deck: My Municipal Government
Presentation transcript:

The SSMP Process 1

The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing issues in a comprehensive, rational and environmentally- minded way. The SSMP will identify strategies for community planning and municipal servicing over the next 25 years, specific to the needs and wants of the residents of the Town. 2

3

4

Policy Framework 5

Provincial Policy Statement Issued under the Planning Act, all planning authorities shall be consistent with the PPS when making decisions affecting planning matters. It is intended that Municipal Official Plans serve as the main vehicle for implementation of these policies. Based on 3 fundamental principles: building strong communities, the wise use and management of resources, and protecting health and safety. 6

Provincial Policy Statement Key policy direction: Focus development to Settlement Areas Provide efficient, orderly and cost effective development Sufficient land is to be made available through intensification and redevelopment to accommodate an appropriate range and mix of employment and housing needs to meet projected needs for time horizons up to 20 years Promote economic development and competitiveness. 7

Provincial Policy Statement Key policy directions: Ensure necessary infrastructure is in place to support current and projected needs Direct new housing to locations with appropriate infrastructure and public service facilities. Promote densities of new housing to efficiently use land, resources, infrastructure and public service facilities. Planning for infrastructure and public service facilities shall be integrated with planning for growth Municipal water and sanitary services are the preferred form of servicing 8

Phase 1 – Background Report Data relating to the following categories was collected: Community Design, Form and Function Community Planning Environment Existing Infrastructure Summarized into the Background Report. Copies available at Municipal Office, Hillsburgh and Erin libraries and on the SSMP website.

Hydrogeology 10

Community Vision Statement 11

Problem/Opportunity Statement Presently, the Town of Erin lacks a long term, comprehensive strategy for the provision of water and wastewater servicing in the villages of Erin and Hillsburgh. The following limitations are associated with the current status of servicing within the Town’s urban areas: 12

What the SSMP will do Provide information for Council to decide on a course of action – facts, community values, implications of various strategies. Provide a tool to use in applying for senior government funding to implement any final solution 13

What the SSMP will not do It does not provide detailed information regarding technologies that will be reviewed and evaluated as part of a further Class EA process. It does not review the appropriateness of any particular site that may be part of a final solution. This review would be part of the next phase of a Class EA process. It does not comment on the appropriateness of any particular planning application. That is subject to a Planning Act process. 14

Next Steps in the SSMP Process The ACS is reviewed by MOE and CVC and final population numbers are agreed to. A draft Final Report is prepared and reviewed with Liaison Committee and Core Management Team. Council will review draft, provide comments. Report will be finalized and put into the Public Record for review and comments by the public. Following this review period and any revisions, Council then approves the Master Plan. Municipality implements course of action. 15

16

Continuing the EA Process 1. Explore collection and treatment technologies in detail Treatment could be achieved in a stand alone facility or via a “Big Pipe” option. Stand alone facility limited by assimilation capacity and level of treatment required. This would limit growth potential. “Big Pipe” requires agreement with another municipality to process your flow. Cost difference between this and own facility may not be significant. Need to buy capacity and build facilities to transmit sewage flow. Advantage of this option is that you may be able to buy enough capacity to satisfy ultimate needs of Town. Disadvantage of this option is that you are at mercy of the other municipality with respect to treatment costs, asset management reserve costs. 17

Continuing the EA Process 2. A “Do nothing” option is always in play If the environmental impacts are insurmountable or the costs deemed not feasible to implement a preferred alternative a municipality can always revert to a “Do nothing’ option. This option would be similar to the “Status Quo” presented earlier. Would lose investment of SSMP and EA process. 18

19