Resource Asset Registration Form Version 5.1 Update July 12, 2012.

Slides:



Advertisements
Similar presentations
Page 1 of 11 Lessees can submit individual Unit Values for their Production Entities if they do not want to utilize the default unit value. If no Unit.
Advertisements

New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
EE 369 POWER SYSTEM ANALYSIS
9/13/2007 Nodal COMS Extracts & Reports Market Requirements Review SDAWG Jackie Ashbaugh ERCOT ***NOTE: All information contained in this presentation.
2014 TIER II REPORTING Sanjay Thirunagari/Prina Chudasama
Resource Data Needed For Dynamic Simulations
1.  An inadvertent issue begins upon the discovery of an Inadvertent Gain or Move-In transaction submission. Upon identification of an Inadvertent Gain.
Generation Interconnection Overview
EFFECTIVE JULY 6, 2015 Standard NEM Web Portal Overview.
Resource Asset Registration Form Version 5.0 / 5.1 Changes for WGRs QMWG Presentation - July 9, 2012.
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
Topics to Cover Interconnection Process Overview
Woody Rickerson ROS/WMS Update June 2013 RARF Data Completion Project.
ERCOT John Adams September 14, 2012 Planning Guide concepts for dealing with Sub Synchronous Resonance in ERCOT & other issues.
RARF QnA Session April 17, Resource Registration Process and Schedule Final RARF forms sent during week of April 7 –New Resources should get blank.
Role of Account Management at ERCOT Market Participant Identity Management Overview (MPIM)
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
RDWG – MP Online Data Entry – Project Priority List / Update July 30, 2013 Troy Anderson.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
1 GENMAP Registration Workshop Jan 14, 2010.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
RARF Frequently Asked Questions from Resource Entities Ed Geer RARF Workshop III 8/29/2013.
Discipline, Crime, and Violence August New DCV Application The DCV application and submission process has been revised beginning with the
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
RARF DATA for TYPES 3 & 4 WTGs Fault Current Contribution for Current Limited Resources Ed Geer, P.E. Network Model Engineer, Sr. SPWG Meeting July 17,
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
SPWG SHORT CIRCUIT CASE BUILDING AND DEVELOPMENT July 17, 2014 Qiuli Yu and Jay Teixeira ERCOT.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
Status Update: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
Lead from the front Texas Nodal 1 Registration Data Collection June Window May 22, 2009 Kick Off Meeting.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
October 14, 2015 LRIS v2 / Self-scheduled Third party DR Provider Data Submission Proposal Carl L Raish.
WGR Equivalent Modeling Keith Smith Network Model Engineer RARF Workshop III August 29, 2013.
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
1 Update to NATF on Resource Registration Feb 2, 2010.
1 Submitting a RARF Art Deller, P.E. Supervisor, Model Administration New Generation Workshop November 4, 2014.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
Distributed Generation Registration June 30, 2008.
Steady-State Working Group: Resource Modeling Discussion Wes Woitt September 27 th, 2011.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 19, 2009.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Lead from the front Texas Nodal 1 Registration Update to TPTF Patrick Coon / Matt Mereness August 13 th, 2007.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Resource Registration Update Dana Showalter Patrick Coon May 5, 2008.
1Texas Nodal Update on Disclosure Issues, including NMMS/RARF Data Discussion ERCOT Staff October 27, 2009.
RARF QnA Session November 1, General Information EDS 4-1 RARF due on Friday, November 9, This includes pink, blue, white cells. (Also should.
Status Update to ROS: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
October 12, 2012 RPG Planning Guide 5.3.2(2) Developer obligation to keep RARF data updated Cathey Carter Resource Integration.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
October 29, 2012 RARF Workshop 2 ERCOT RARF Data Request Issues Jay Teixeira Manager, Model Administration.
Lead from the front Texas Nodal 1 MP10 / MP11 Registration Data Update Oct 14, 2008 TPTF.
Lead from the front Texas Nodal 1 Registration Market Call Nov 21, 2008.
Lead from the front Texas Nodal 1 Texas Nodal Registration meeting- RARF Question &Answer Matt Mereness August 9 th, 2007.
Issues with Reactive Testing and the NDCRC S. Looney QMWG, 11/5/2012.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
Registration Data Collection September Window
Resource Asset Registration Form – Business Rule updates
Resource Registration Update
KANSAS STATE UNIVERSITY
System Review Work Group Update to TSS
Presentation transcript:

Resource Asset Registration Form Version 5.1 Update July 12, 2012

2 RARF Version 5 - two Phases Phase I – March 21, 2012 – RARF Version 5.0 –Transposed the RARF form – resources are in rows –Phase I - Separated RARF into forms for Generation, Wind, Combined Cycle, Transmission, and Load Resources –Updated the Business Rules (Validation rules were re-prioritized, some new errors may appear that were not previously seen due to Warnings that caused some errors to be over-written) –Added new fields (Business Rules for new fields were not active) –Pre-populated RARF Version 5.0 forms were ed to REs July 12, 2012

3 What Changed in RARF Version 5.0/5.1? Phase II – June 26, 2012 – RARF Version 5.1 –Activated the business rules on new fields (not enforced until October 1, 2012.) –Added the AGR tab to the Gen_Form_Pivoted.xls for NPRR437 “Allow Aggregation of Multiple Generators Into A Single Resource For Market and Engineering Modeling” –Separated out the 3 tabs “General and Site Information”, “GEN Load Split - ESIID”, “Private Network – Site” from the Gen_Form_Pivoted.xls, Wind_Form_Pivoted.xls, Combined_Cycle_Form_Pivoted.xls and built a new form General_Site_ESIID Information.xls” –Added a Non-Modeled Resource form July 12, 2012

4 RARF Version 5.1 Timing RARF Version 5.1 Timing: Pre-populated, RARF Version 5.1 forms were sent to each Resource Entity on July 2, No immediate action is required. RARF Version 5.1 validation rules on new fields became effective, but are not enforced until October 1, RARF Audit Reports reflect errors and warnings associated with all the new required data fields. To the extent possible, existing RARF data was pre-populated in RARF Version 5.1 forms ( except PUN Load Data, One-Lines, Transformer Test Data, Stability Study Model, PSCAD Model, Dynamic Data, Collector System – WIND, Collector System-Wind Seg Data and any new data fields that were completed prior to July 2, 2012.) July 12, 2012

5 RARF Version 5.1 Submission All Generation RARF Version 5.1 forms must be submitted together in a ZIP file. –Generation RARF package - ZIP file contains: General_Site_ESIID Information.xls (new for RARF Version 5.1) Gen_Form_Pivoted.xls (site code must be entered in cell B5 on the Unit Info – GEN tab) Wind_Form_Pivoted.xls (site code must be entered in cell B5 on the Unit Info - WIND tab) Combined_Cycle_Form_Pivoted.xls (site code must be entered in cell B5 on the Unit Info - TRAIN tab) Non_Modeled_Gen_Form_Pivoted.xls (site code must be entered in cell B5 on the Unit Info – DG tab) (new for RARF Version 5.1) Transmission_Form_Pivoted.xls (site code must be entered in cell B5 on the Line Data tab) July 12, 2012

6 RARF Version 5.1 Submission (continued) Load Resource package (LAAR) – separate ZIP file –LAAR Generation Package – ZIP file Contains: LAAR_Form_Pivoted Submission requirements: Do not change RARF form names. All file extensions must remain as.xls For Generation Resources - name the RARF.ZIP file by site code. (Example: SITECODE.zip) For Load Resources - name LAAR.ZIP file by DUNS. (Example: zip) July 12, 2012

7 RARF Version 5.1 Submission (continued) As of June 26, 2012, all RARF submittals must be on RARF Version 5.1 forms Two methods to submit –Through Internet MIS as Service Request (Preferred) –Through ERCOT Legal and cc: Submitted by Authorized Representative (or backup Authorized Representative) of the Resource Entity RARF Version 5.1 forms and Guide located on ERCOT.com ( July 12, 2012

8 RARF Processing ERCOT Processing –Registration receives RARF and performs initial screening –Registration runs programmed business rules to ensure compliance with defined business rules and completeness of data –If passed, Registration communicates scheduled Model Load Date to RE submitting request by way of approval of the Service Request with notations of the MRD, based on Section , Timeline for Network Operations Model Changes –Model load date available on website ( schedule) July 12, 2012

9 RARF Processing ERCOT Processing (continued) –Registration uploads RARF to data base of record and notifies Network Modeling Group (NMG) –NMG reviews RARF for accuracy and ability to model –NMG or other downstream systems may have additional questions July 12, 2012

10 RARF Processing July 12, 2012

11 RARF Version 5.1 – New Fields RARF Version 5.1 – New Fields: In the sent to each Resource Entity on July 2, 2012 with the pre-populated, RARF Version 5.1 forms, we included a file that lists added and updated data fields. RARF_NEW_ AND_UPDATED_FIELDS.xls –Change Description lists all new and updated fields –Most updated fields were updates to the Business Rules –Shows RARF Form, RARF Tab and Data Field –States the Business Rules/Basic UI validations for the new and updated fields Examples of new fields are as follows. July 12, 2012

12 RARF Version 5.1 – New Fields Unit Info – Gen, CC, Wind tab: Non-Modeled Generator Transmission Only Date (POI) [Optional, required for addition of the generation site transmission equipment on a earlier Network Operations Model MRD than the resource] Standard Generation Interconnection Agreement (SGIA) Signature Date Unit Start Date (Model Ready Date) [Optional, required for new resource to be added to the Network Operations Model] POI – Sub-Station Code/Sub-Station Mnemonic POI - Voltage Level POI - PTI Bus Number Governor Droop Setting Governor Dead-band Design Max Ambient Temperature Design Min Ambient Temperature July 12, 2012

13 RARF Version 5.1 – New Fields Ownership – Gen, CC, Wind tab: Ownership Start Date Ownership Stop Date Parameters – Gen, CC, Wind tab: Unit De-rating Values (0 – 120 degrees F) Reactive Capability Data Provided Below Is Gross Values? (Gross is required). Reactive Capability Data Provided is from NDCRC Test Data? If Reactive Capability Data Provided Is From NDCRC test Data Then Enter The Date On Which The Test Was Performed. July 12, 2012

14 RARF Version 5.1 – New Fields Planning – Gen, CC, Wind tab: Positive Sequence Z (unsaturated) Negative Sequence Z (unsaturated) Zero Sequence Z (unsaturated) Direct Axis Sub-transient Reactance, X"dv (saturated) Direct Axis Transient Reactance, X'dv (saturated) Zero Sequence Grounding Resistance For An Impedance Grounded Generator In P.U. (100 MVA Base) Zero Sequence Grounding Reactance For An Impedance Grounded Generator In P.U. (100 MVA Base) Stability Study Model tab – embed any executable code models PSCAD Model (if applicable) tab Dynamic Data tab – embed any PDF diagrams, csv files and tabular data July 12, 2012

15 RARF Version 5.1 – Examples of New Fields – Wind_Form_Pivoted.xls Unit Info – Wind tab additional fields: Height of Meteorological Instrumentation - Wind Speed Height of Meteorological Instrumentation - Wind Direction Height of Meteorological Instrumentation - Barometric Pressure Height of Meteorological Instrumentation – Temperature July 12, 2012

16 RARF Version 5.1 – Examples of New Fields – Wind_Form_Pivoted.xls Planning – Wind tab (continued): Average Amount Of Auxiliary Real Power (and characteristics) Average Amount Of Auxiliary Reactive Power (and characteristics) Auxiliary Load Power Factor TURBINE STEP-UP TRANSFORMER DATA –High Side Voltage Level (nominal) –Low Side Voltage Level (nominal) –High Side Voltage Connection –Low Side Voltage Connection –Impedance Z –X/R Ratio –Zero Sequence Z –Zero Sequence X/R Ratio –Base Mva For Transformer Data July 12, 2012

17 RARF Version 5.1 – Examples of New Fields – Wind_Form_Pivoted.xls Collector System - WIND tab: COLLECTION SYSTEM ONE LINE DIAGRAM (Embed a PDF One Line Diagram) COLLECTION SYSTEM DETAILED MODEL (Embed a PSS/e Raw Data or Powerworld Model) COLLECTION SYSTEM DETAILED MODEL –Cable Type –Voltage Level kV –POSITIVE SEQUENCE DATA R/Kft X/Kft Charging Bc/Kft –ZERO SEQUENCE DATA R0/Kft X0/Kft July 12, 2012

18 RARF Version 5.1 – Examples of New Fields – Wind_Form_Pivoted.xls Collector System-Wind Seg Data tab: Cable Type WIND SEGMENT DETAILS –From –To –Circuit Number –Voltage Level –Cable Segment Length –Number of Turbines On Cable Segment July 12, 2012

19 RARF Version 5.1 – Examples of New Fields – Transmission_Form_Pivoted.xls Line Data tab: Zero Sequence Line Resistance In P.u. (100mva Base) Zero Sequence Line Reactance In P.u. (100mva Base) Zero Sequence Charging Susceptance In P.u. (100mva Base) Line Temperature tab: Planning Rate C – rating for the conductors that does not include the terminal equipment rating limitations - Must be >= Nominal Emergency Rating (2HR Rating) Breaker Switch Data tab: Continuous Rating 2-hr Emergency Rating 15 Min Rating July 12, 2012

20 RARF Version 5.1 – Examples of New Fields – Transmission_Form_Pivoted.xls Transformer Data tab: Zero Sequence Data - Winding Connection Code (1-9) Zero Sequence Grounding Resistance For An Impedance Grounded Transformer In P.U. (100 MVA Base) Zero Sequence Grounding Reactance For An Impedance Grounded Transformer In P.U. (100 MVA Base) Zero Sequence Resistance In P.U. (100 MVA Base) Zero Sequence Reactance In P.U. (100 MVA Base) Transformer Test Data tab - embed any PDF diagrams, csv files and tabular data July 12, 2012

21 RARF - Future updates Future RARF updates: Provide for new Resource types (Solar, Energy Storage, etc.) NPRR425 – register WGR Groups Other possible changes RARF documentation updates: Updates to the RARF Guide and RARF Glossary Listing of RARF Audit Report Business Rules for all data fields July 12, 2012

22 RARF Version 5.1 Action Items - by October 1, 2012 RARF Version 5.1 Action Items: By October 1, 2012 Resource Entities must have a complete, ERCOT-approved RARF for each Resource site, including all new data. RARF submittals must be on RARF Version 5.1 forms Review and re-submit - PUN Load Data, One-Lines, Transformer Test Data, Stability Study Model, PSCAD Model (if applicable), Dynamic Data, Collector System – WIND (for WGRs), Collector System-Wind Seg Data (for WGRs), and any new data fields that were completed prior to July 2, RARF Version 5.1 business rules on new data fields will be enforced beginning October 1, July 12, 2012

23 RARF Version 5.1 – Questions following the WebEx Following the WebEx, if you have any questions: Contact your Account Manager who will bring in the needed resources to answer the questions Client Services line at For RARF submittal questions and issues, ERCOT Resource Registration at To raise issues with RARF Version 5.1 forms, ERCOT Resource Registration at July 12, 2012

24 Questions July 12, 2012