1 EFFECTIVE JULY 6, 2015 Standard NEM Web Portal Overview

2 2 Agreement & Customer Authorization (79-1151A Form)

3 3 Agreement and Authorization (Form 79-1151A) Application (Form 79-1151B)

4 4 Online tooltips provide explanations for fields The Customer needs to have two key pieces of information to use the web portal: 1)Electric Service ID and 2)Electric Meter ID Both can be found on the Customer’s most recent PG&E bill. Note: Service IDs and Meter IDs can change for various reasons. PG&E strongly recommends obtaining the most recent copy of the Customer’s bill in order to access the web portal. Outdated Service IDs and Meter IDs won’t be accepted by the web portal For security purposes, CAPTCHA security text will need to be entered to move forward. It is not case-sensitive

5 5 A successful match of Electric Service ID and Meter ID will auto-populate the Customer fields. PG&E encourages that Email be the preferred method of contact for the Customer as this option will help expedite all correspondence, including the Permission to Operate Letter testemail@gmail.com CityXYZ 94XXX 123 Go Solar Court 123456789 987654321 DOE, JOHN

6 6 If the Customer is authorizing a 3 rd party Company to act on their behalf, then this radio button needs to be selected If the Customer is authorizing a 3 rd party Company to act on their behalf, then this section needs to be completed

7 7 The Customer/Installer will need to indicate the type of generator(s) being interconnected 123456789 987654321 JOHN 123 Go Solar Court, CityXYZ, CA 94XXX DOE

8 8 Indicate the size of the generating system 123456789 987654321 JOHN 123 Go Solar Court, CityXYZ, CA 94XXX DOE

9 9 The Web Portal will do a back-end calculation to let the Customer know if the system is appropriately sized 123456789 987654321 JOHN 123 Go Solar Court, CityXYZ, CA 94XXX DOE

10 10 The Customer’s current rate will be shown Please identify if an electric vehicle recharging facility will be a part of load at the generating facility location If yes to the electric vehicle question, an additional question will appear asking about the number of vehicles 123456789 987654321 JOHN 123 Go Solar Court, CityXYZ, CA 94XXX DOE

11 11 123456789 987654321 JOHN 123 Go Solar Court DOE CityXYZ 94XXX testemail@gmail.com The Customer will be asked to review and validate all information presented on the Agreement and Customer Authorization. If needed, there is an edit button in each section to update information as needed

12 12 The Customer will be asked to review and validate all information presented on the Agreement and Customer Authorization. If needed, there is an edit button in each section to update information as needed testemail@gmail.com fakeemail@shinysolarco.com

13 13 Several checkboxes need to be enabled to proceed: 1.The release for a 3rd party to be authorized to submit Application (79-1151B) on the Customer’s behalf 2.Consent that the Terms and Conditions have been read There are 2 options to supply the Customer signature for the Agreement and Customer Authorization when completed by a 3 rd party: 1.Use DocuSign to send to the Customer via e-mail to sign electronically (free of charge) 2.Upload a complete (all 5 pages) of a wet signed, Agreement and Customer Authorization fakeemail@shinysolarco.com

14 14 The print feature allows you to print a hard copy of the Agreement and Customer Authorization that was submitted to PG&E Continue on to fill out the Application form online Auto generated reference number to follow up on your interconnection request 123456789 987654321 JOHN 123 Go Solar Court DOE CityXYZ 94XXX

15 15 testemail@gmail.com fakeemail@shinysolarco.com

16 16 Application (79-1151B Form)

17 17 All * fields need to be filled out. The form is dynamic and may present more or less fields if certain selections are made 123 Go Solar Court, CityXYZ, CA 94XXX 123456789 987654321

18 18 If the installer is preparing the Application on behalf of the Customer, we require confirmation of authorization as well as Company Name, Preparer, and the Date in which the Application is prepared

19 19 Questions guide the user to identify if a Variance Request is required 123 Go Solar Court, CityXYZ, CA 94XXX 123456789 987654321

20 20 Select the generating facility type(s). If solar, identify the mounting method, tracking type and all other applicable fields 123 Go Solar Court, CityXYZ, CA 94XXX 123456789 987654321

21 21 If the Tracking Type is Fixed or Mixed, then please indicate the Tilt and Azimuth 123 Go Solar Court, CityXYZ, CA 94XXX 123456789 987654321

22 22 Equipment information will be requested regarding the solar generator 123 Go Solar Court, CityXYZ, CA 94XXX 123456789 987654321

23 23 Additional PV Panels and Generators may be added by selecting the + button If the Customer/Installer states that there is one or more AC disconnects in the earlier screen, the Disconnect Switch Fields will appear

24 24 PG&E provides a single line diagram for the Customer/Installer to use. They can certify that the drawing represents their project by selecting the radio button and completing the Panel Voltage, Main Breaker and PV Breaker Size If the Basic SLD doesn’t represent the project, select the Custom Single Line Diagram radio button. At the end of the Application, you will be asked to upload the custom diagram as an attachment

25 25 The Review and Submit pages allows the Customer/Installer to review all inputted data and make edits if needed Important warning message may appear here to notify the Customer that additional steps may be required prior to interconnection. PG&E will notify the Customer with the next steps if applicable. 123 Go Solar Court, CityXYZ, CA 94XXX 123456789 987654321

26 26

27 27 Once all data is reviewed, click the Next button

28 28 The upload screen will prompt the Customer/Installer to upload all applicable documents related to the Interconnection request. Please only upload required items Please note the maximum combined file size of the uploaded documents is 7MB Click the Submit button when ready to submit Application to PG&E. Please only hit this button once