CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

Technology Department EDMS nb.?????? Maintenance methods and policy in FPS section Maintenance Management, Spare Parts Management. Overview of activity.
HP Quality Center Overview.
Configuration Management Managing Change. Points to Ponder Which is more important?  stability  progress Why is change potentially dangerous?
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
An overview of the CERN CMMS
Configuration Management
Software Configuration Management
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
CAD services for mechanical integration of large experiments Tatiana KLIOUTCHNIKOVA Introduction to a discussion aiming to collect comments and.
CSCI ClearQuest 1 Rational ClearQuest Michel Izygon - Jim Helm.
Configuration Management Managing Change. Points to Ponder Which is more important?  stability  progress Why is change potentially dangerous?
ILC EDMS project suite Status Maura Barone GDE/Fermilab ILC Valencia - November 7, 2006.
Infrastructure for LHCb Upgrade workshop CAD integration EDMS: February 2015.
New test structures: Status report and technical documentation review
Configuration Management (managing change). Starter Questions... Which is more important?  stability  progress Why is change potentially dangerous?
Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
CERN Methodology document 1 Use of CERN CAD Exchange tool Process and rules for exchange of CAD files by using CERN CAD Exchange tool. Prepared by : B.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Project management tools Tiia Uusimäki. Agenda Activity Planning Tool and Earned Value Management – Why are the tools needed? – Activity Planning tool.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
© Mahindra Satyam 2009 Configuration Management QMS Training.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
EDMS - Engineering Data Management System Electronic Documents Management System Introduction to EDMS (slides): example.
Targets for project progress 2015: graduation review – clear documentation and PoC implementation specify general framework and API requirements gap analysis.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
E-Document Part II: ILC EDMS ILC / LCWS Workshop, Hamburg 2007 Lars Hagge Deutsches Elektronen-Synchrotron (DESY)
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
CLIC Cost at 3 TeV and 500 GeV CDC meeting, Hans-H. Braun for CLIC cost & Schedule WG Mick Draper, Katy Foraz, Claude Hauviller, Bernard Jeanneret,John.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
EDMS for EGEE-IIEDMS No: ver 1 David Widegren, CERN, TS/CSE Using the CERN EDMS in the EGEE-II project.
Review of the processes released in the framework of the MMP Goran Perinić.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
LHC intervention scheduling with the Work Acceptance Tool
Vacuum Controls Quality Management
Chapter 11: Software Configuration Management
Configuration Management and Layout Database ELENA Project
EDMS, CDD, Catia, smarteam.
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Configuration Management (managing change)
USOAP Continuous Monitoring Approach (CMA) Workshop
Intermountain West Data Warehouse
Connected Vehicle Reference Implementation Architecture (CVRIA)
Chapter 11: Software Configuration Management
Infor EAM in the Handling Engineering Group at CERN
E. Manola-Poggioli 05 December 2001 EDMS doc
Case management as logbook for the cryogenic installations at CERN
Configuration Management
Introduction of PTM (Planning Tracking & Management) Tool - developed by Meridian Technology 29/05/2019.
Presentation transcript:

CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure: organization, documentation and cost estimate G. Riddone

Content  Introduction to CERN Product Lifecycle Management  CLIC Product Breakdown Structure  CLIC Beam Instrumentation documentation  Beam instrumentation cost estimate  Application and relevant EDMS features  Conclusions G. Riddone, BIWS, June

Product Lifecycle Management (PLM)  Intention to build an integrated Product Lifecycle Management (PLM) platform  Aim to link all the information related to one item/product to one common database  Whole lifecycle can be followed  PLM = EDMS at CERN  Integration work under way CERN EDMS

Overview of the CERN EDMS G. Riddone, BIWS, June 2009 Agile PLM Design data Drawings & Documents Infor EAM Asset tracking Work management Other DBs Layout databases Production databases Design data management Manufacturing follow-up Installation follow-up Maintenance management CERN Engineering & Equipment Data Management System D. Widegren 4

Introduction to EDMS  EDMS (Engineering and Equipment Data Management Service) provides engineering and equipment data management capabilities. This implies providing a set of advanced information systems but also the development and the formalization of methodologies and procedures for the engineering and equipment data management processes.  EDMS ensures that engineering and equipment data as well as documentation for projects and installations are safeguarded, organized, verified and remain retrievable on a long-term basis.  EDMS is used:  for all technical data management and their associated work process  for information flow among different teams, including external suppliers/collaborators G. Riddone, BIWS, June

EDMS – Web Interface G. Riddone, BIWS, June

Content  Introduction to CERN Product Lifecycle Management  CLIC Product Breakdown Structure  CLIC Beam Instrumentation documentation  Beam instrumentation cost estimate  Application and relevant EDMS features  Conclusions G. Riddone, BIWS, June

CLIC structure in EDMS -1  Based on the CLIC organization chart, a structure in EDMS has been implemented G. Riddone, BIWS, June

CLIC PBS (hardware baseline) G. Riddone, BIWS, June  The hardware baseline is based on CLIC PBS, which has been defined according to the CLIC layout The “hardware baseline” will contain all baseline documentation for the CLIC study : Parameter Specifications, Functional Specifications, Engineering Specifications, Technical Specifications, Eng. Change Request, Eng. Change Order Tree structure

CLIC PBS (hardware baseline) G. Riddone, BIWS, June (level 1) (level 2) (level 3) (level 4)

Content  Introduction to CERN Product Lifecycle Management  CLIC Product Breakdown Structure  CLIC Beam Instrumentation documentation  Beam instrumentation cost estimate  Application and relevant EDMS features  Conclusions G. Riddone, BIWS, June

BI documentation -1 G. Riddone, BIWS, June Meetings Workshops Technical documents Technical reports Presentations (Possibility to create links to Indico) All CLIC specifications are collected in these nodes, and linked to the corresponding node in the HW baseline

BI documentation -2 G. Riddone, BIWS, June PS attached to the dedicated HW baseline node All technical documents are public

BI Par. Specifications G. Riddone, BIWS, June Complete list of PSs in EDMS:

Content  Introduction to CERN Product Lifecycle Management  CLIC Product Breakdown Structure  CLIC Beam Instrumentation documentation  Beam instrumentation cost estimate  Application and relevant EDMS features  Conclusions G. Riddone, BIWS, June

PBS-based cost estimate G. Riddone, BIWS, June Coordinators per domain/subdomain

CLIC study costing tool -1 G. Riddone, BIWS, June type 0 e+ modules20924 modules DB BPMs per Type 0 e+ module

CLIC study costing tool -2 G. Riddone, BIWS, June

Input estimates G. Riddone, BIWS, June First round of updated cost estimate by end of Input on schedule will be provided by T. Lefevre 3. T. Lefevre will collect all input for the BI cost estimate. 4. The domain/subdomain coordinators will put the values in the CLIC study costing tool

Content  Introduction to CERN Product Lifecycle Management  CLIC Product Breakdown Structure  CLIC Beam Instrumentation documentation  Beam instrumentation cost estimate  Application and relevant EDMS features  Conclusions G. Riddone, BIWS, June

Example of a EDMS document -1 G. Riddone, BIWS, June

Example of a EDMS document -2 G. Riddone, BIWS, June Several files can be uploaded in a EDMS document (max 100 Mb)

Example of a EDMS document -3 G. Riddone, BIWS, June Possibility to attach EDMS documents as sub-documents

Example of a EDMS document -4 G. Riddone, BIWS, June Documents have one life-cycle and depending on where they are in the life-cycle they have a corresponding status. The standard lifecycle for a document is In-Work Under-Approval Released and Obsolete Once a document has been approved, it can be modified only via a versioning process Other lifecycles can be programmed if required. Documents have one life-cycle and depending on where they are in the life-cycle they have a corresponding status. The standard lifecycle for a document is In-Work Under-Approval Released and Obsolete Once a document has been approved, it can be modified only via a versioning process Other lifecycles can be programmed if required.

Example of a EDMS document -5 G. Riddone, BIWS, June For all CLIC nodes (except nodes on cost and CSC) WRITE: CLIC meeting members (can be adapted) READ: public access Nodes on cost and CSC: restricted read/write access

Example of a EDMS document -6 G. Riddone, BIWS, June This tab shows the list of other existing versions of the document, and its full history, including notifications.

Notification list  Possibility to ask for daily notification list  list of EDMS documents created the day before G. Riddone, BIWS, June

G. Riddone, BIWS, June Conclusions  We are getting organized towards a project-oriented structure  EDMS as unique source of information  Tree structure set-up for CLIC documentation in EDMS (can be used by CERN people and external collaborators)  All BI documentation will be available in EDMS: all PS have been archived and the approval circuit will be soon launched (collaborators will be largely involved)  Update cost estimate will be needed for CDR: first iteration by end of 2009 (still possibility to give feedback to technical systems)