ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.

Slides:



Advertisements
Similar presentations
ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
Advertisements

ECE 477 Final Presentation Team 6  Spring 2010 Digital Sound Projection.
ECE 477 Design Review Team 13  Spring 2006 Elmer Chao (not pictured), Matt Cozza (not pictured), Joe Waugh (not pictured), Evan Zelkowitz (not pictured)
ECE 477 Design Review Team 22  Txt Msg DJ Garrett Strzelecki Kyle Brown John Doherty Chris McCabe K.
ECE 477 Design Review Team 15  Spring 2013 Jackson McCormick, Andrew Batek, Carey Woolet, Justin Lindley.
ECE 477 Design Review Team 01  Fall 2012 Brennan Tran Jonah Ea Ben Pluckebaum Kevin Meyer.
Twitch Plays ECE477 ECE 477 Design Review Team 1 − Spring 2015 Hannan Harlan Root Tornquist.
ECE 477 Design Review Team 13  Spring 2008 Paste a photo of team members here, annotated with names of team members. Srichand Varun Madhu Anvesh.
ECE 477 Design Review Team 7  Spring 2011 Paste a photo of team members here, annotated with names of team members. Stuart Pulliam Will Granger Linda.
ECE 477 Design Review Group 1  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 10  Spring 2012 Paste a photo of team members here, annotated with names of team members. Nathan Irvin Will Bouchonnet Allen.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Design Review Team 6  Spring 2011 Left to right: Kirk Iler, Brian Bentz, Stephen Wolf, Fuhe Xu.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
ECE 477 Design Review Team 1  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger Formal Design Review.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer.
ECE 477 Design Review Team 2  Spring 2010 Digi-Brush Josh LongCaleb Ayew-ewKatie Schremser.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
Solar Telematics System ECE 477 Design Review, Team 8, Spring 2012 Paste a photo of team members here, annotated with names of team members. Craig Lechlitner,
Daryl SielaffBen McQuiston Will McKennaDavid Hartman Functional Blocks and FMECA Chart.
ECE 477 Design Review Team 5  Fall 2007 Wes Chris Josh Dave.
 Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design  Schematic and theory of operation.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
ECE 477 Design Review Group 7  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Design Review Team 01  Fall 2010 Jigar Gandhi Chandler Wall John-Taylor Smith Eric Zarowny.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 2  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 11  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,
ECE 477 Design Review Team 7  Spring 2007 Joe Land Ben Fogle James O’Carroll Elizabeth Strehlow.
ECE 477 Design Review Team 2  Spring 2006 Prashant Grimella Andy Brezinsky Tim Sendgikoski Clark Malmgren.
ECE 477 Design Review Team 1  Fall 2006 Sumanth Peddamatham Alex Tucker Chris Arges Radhika Mulani.
ECE 477 Final Presentation Team 14  Spring 2010.
ECE 477 Design Review Team 3  Fall 2007 Steven Kingsley (Analog) Roy Scheck (Leader) Tony Liechty (Digital) Charles Lan (Software)
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Final Presentation Team 01  Spring 2014 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 DESIGN REVIEW FEST – FALL OUTLINE  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE477 Midterm Design Review: Team #
ECE 477 Design Review Team 12  Spring 2006 EricDaniel Atandra Sriharsha Aasenda Silva Burman Vengapaty.
ECE 477 Design Review Team 4  Spring 2006 Justin Thacker, Matt Kocsis, Ian Snyder, Dustin Poe.
Eric Tarun Craig Dave ECE 477 Design Review Team 9  Spring 2006 Galamback Chawla Noble Kristof.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Final Presentation Team 3  Fall 2012 Daniel Carolyn Jonathan Mihir Stein McMican Kuntzman Shah.
ECE 477 Design Review Team 5  Spring 2010 Fred Grandlienard Andrew Gregor Kevin Mohr Ryan DeFord.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Design Review.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
ECE 477 Design Review Team 12  Spring 2007
ECE 477 Design Review Group 6  Fall 2005
Post-PCB Submission Progress Briefing
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
Post-PCB Submission Progress Briefing
ECE 477 Design Review Team 5  Fall 2006
ECE 477 Design Review Team ??  Fall 2012
ECE 477 DESIGN REVIEW TEAM 14  SPRING 2010
Presentation transcript:

ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben

Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria Block diagramBlock diagram Component selection rationaleComponent selection rationale Packaging designPackaging design Schematic and theory of operationSchematic and theory of operation PCB layoutPCB layout Software design/development statusSoftware design/development status Project completion timelineProject completion timeline Questions / discussionQuestions / discussion

Project Overview The DSMRP has been designed for musicians, music teachers, and music students to aid them in dissecting a piece of music.The DSMRP has been designed for musicians, music teachers, and music students to aid them in dissecting a piece of music. The user will be able to play any number of instrument parts for a song. This way the user can listen to his/her own part, or listen to the whole song.The user will be able to play any number of instrument parts for a song. This way the user can listen to his/her own part, or listen to the whole song. This will make learning and teaching music pieces much easier. The user will be able to listen to whatever part he/she needs.This will make learning and teaching music pieces much easier. The user will be able to listen to whatever part he/she needs.

Project-Specific Success Criteria An ability to parse an image file, to determine note type (quarter, half, whole) and position on staff given a clef and key, into intermediate musical symbols.An ability to parse an image file, to determine note type (quarter, half, whole) and position on staff given a clef and key, into intermediate musical symbols. An ability to manipulate intermediate musical symbols into a MIDI file.An ability to manipulate intermediate musical symbols into a MIDI file. An ability to play a MIDI file through a MIDI audio processing chip.An ability to play a MIDI file through a MIDI audio processing chip. An ability to act as a USB host and interface to a thumb drive.An ability to act as a USB host and interface to a thumb drive. An ability to display and navigate menu on a character LCD.An ability to display and navigate menu on a character LCD.

Block Diagram

Component Selection Rationale SHARC:SHARC: –8/16-bit bus –DSP instruction set –On-chip RAM USB Controller:USB Controller: –USB Host for thumb drive –8-bit CPU interface Audio chip:Audio chip: –Decode MIDI commands into audio signal –8-bit CPU interface Memory:Memory: –2Mbit x 8 SRAM, 3.3V, parallel interface

Packaging Design Used by both groups and individualsUsed by both groups and individuals PortablePortable Stand Alone / Desktop sizedStand Alone / Desktop sized USB Controller InterfaceUSB Controller Interface LCD for displaysLCD for displays RPG or Pushbuttons for menu navigationRPG or Pushbuttons for menu navigation Headphone Jack for personal use or for interface to external speakersHeadphone Jack for personal use or for interface to external speakers

CAD Drawing: Model View

CAD Drawing: Wireframe

Schematic/Theory of Operation Block A: μC and User InterfaceBlock A: μC and User Interface Block B: External Memory & LatchBlock B: External Memory & Latch Block C: USB ControllerBlock C: USB Controller Block D: Power CircuitBlock D: Power Circuit Block E: Audio Chip & Headphone JackBlock E: Audio Chip & Headphone Jack

Block A: μC & User Interface

Block B: Ext. Memory & Latch

Block C: USB Controller

Block D: Power Circuit

Block E: Audio Circuit

PCB Layout Block A: Overall PCBBlock A: Overall PCB Block B: Power Circuit and the μCBlock B: Power Circuit and the μC Block C: External Memory & LatchBlock C: External Memory & Latch Block D: The Main BusBlock D: The Main Bus Block E: Interface CircuitryBlock E: Interface Circuitry

PCB Layout Major ConsiderationsMajor Considerations –Microcontroller requires many power and ground connections –The main bus will be connected to 5 chips.

PCB Layout- Overall circuit

PCB Layout- Power and the Micro

PCB Layout- External Memory & Latch

PCB Layout

PCB Layout- Interface Circuitry

Software Design/Development Status Prototyping image processing in MATLABPrototyping image processing in MATLAB Research on MIDI file format completedResearch on MIDI file format completed Prototyping logic for IMS to MIDI modulePrototyping logic for IMS to MIDI module Interfacing software modules yet to be startedInterfacing software modules yet to be started

Project Completion Timeline October 19: All Parts in Hand for PCB MatchingOctober 19: All Parts in Hand for PCB Matching October 20: Final PCB Turn-inOctober 20: Final PCB Turn-in November 1: All Software PrototypedNovember 1: All Software Prototyped November 8: Get DSMRP ResponsiveNovember 8: Get DSMRP Responsive November 21: Individual PSSCs WorkingNovember 21: Individual PSSCs Working December 6: PSSCs Successfully IntegratedDecember 6: PSSCs Successfully Integrated December 11: All Team HWs Completed.December 11: All Team HWs Completed.

Questions / Discussion