Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.

Slides:



Advertisements
Similar presentations
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Advertisements

1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
G.Barber Mice Tracker Integration Jun Tracker integration.
1 Progress report on Calorimeter design comparison simulations MICE detector phone conference Rikard Sandström.
1Malcolm Ellis - Tracker Meeting - 18th May 2006 Reconstruction Plans  Staged process of building up Reconstruction over the rest of this year  Will.
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
1 Scintillating Fibre Tracker Simulation Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
1 Sci Fi Simulation and Reconstruction Status M.Ellis/C.Rogers Wednesday 31 st March 2004.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
1 Status of Cosmic Analysis Malcolm Ellis Imperial College London Wednesday 10 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
1 PID, emittance and cooling measurement Rikard Sandström University of Geneva MICE Analysis phone conference.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Julia Sedgbeer Mice Collaboration Meeting, June SciFi Tracker – SW Status & Plans General SW status Simulation & Reconstruction Performance Studies.
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
1Malcolm Ellis - Video Conference - 7th December 2006 Data Challenge Report  Disclaimer  Data Challenge definition(s)  Software status u G4MICE u GRID.
1 PID Detectors & Emittance Resolution Chris Rogers Rutherford Appleton Laboratory MICE CM17.
Sci Fi Simulation Status Malcolm Ellis MICE Meeting Osaka, 2 nd August 2004.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Tracking Detectors Working Group MICE Collaboration Meeting March 30, 2004 A. Bross.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
1 Status of the MICE SciFi Tracker Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
1 G4MICE Malcolm Ellis SciFi Tracker Meeting, KEK Thursday 31st March 2005.
1Malcolm Ellis - Tracker Meeting - 6th November 2006 Tracker Software  Offline u Modeling u GRID u Tests u Decoding u Kalman fit u Reconstruction & “data.
Tracker QA Test Station Status. 29/08/2015Imperial College 2 Updated QA Scan Definition Scan definition: 1 –One 300 mm scan  r to V (1) 25 –Two 75 mm.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
1Malcolm Ellis - CM th October 2006 Status of Data Challenge  Don’t Shoot the Messenger!  Data Challenge – explanation  Software Tools u Design.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
MICE Preparations for CM18 Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Video Conference April 12,
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
G.Barber: Mice-International Meeting Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
1M. Ellis - MICE Tracker PC - 19th October 2007 Station QA Analysis (G4MICE)  For details of software see my previous talk here: u
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
MICE Phase 1 Koji Yoshimura KEK June
Online Reconstruction 1M.Ellis - CM th October 2008.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
1 Software Workshop Report Malcolm Ellis MICE Video Conference Wednesday 9 th November 2005.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
Online – Data Storage and Processing
Requirements for the Software Group (and agreed actions)
Tracker Specific Software
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Presentation transcript:

Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004

2 Outline Summary of tracker workshop –Station layout, patch panel, station mould and assembly area –Ribbon fabrication and VLPC cryostat design KEK test beam Simulation/Analysis –TURTLE –RF Background

3 Tracker Workshop 9 th – 11 th September at Imperial College Discussed: –mechanical design and component manufacture –ribbon fabrication and support structure –VLPC cryostat design and AFEII status –KEK test beam –quality assurance –simulation and emittance calculation –work on MICE note

4 New Station Layout and Connectors

5 New Station Support

6 Patch Panel This is the patch panel model. It is not the definitive model as detailed drawings will be required to mate it to the magnet. This model gives space for 26 connectors. As only 25 are needed, the 26 th opening can be used for field monitoring services.

7 Station Mould This sequence shows the station mould being produced in the Liverpool workshop

8 Assembly Area The area has now been painted and the majority of the assembly equipment moved in. The lighting has been improved and we now need to re- connect the stages and the microscope. It is ‘quite roomy’ compared to our old assembly area,, although none of the QA stations are set up yet.

9 Ribbon Fabrication All fibres have been aluminized – ppm 3HF – ppm 3HF New test ribbon was fabricated (training for Roger Hare) in August. Looked very good Four production ribbons have since been produced and delivered to London Procedure: –Mould preparation –Vacuum seal and bed in teflon sheet –Define the boundaries of the plane –Lay the first two layers of fibres –Mix and apply polyurethane –Lay Mylar sheet –Pressure plate and clamping

10 Applying Polyurethane

11 Laying Mylar Sheet

12 Clamping

13 VLPC Cryostat Design Drawings are complete and have been checked. Concept hasn’t changed since June KEK meeting. Detailed design has been finished since then. The drawing package is complete and has been forwarded to KEK. Outstanding questions have been resolved. The cryo-cooler (Sumitomo 415D) has arrived at University of Illinois.

14 Main and Lid Assembly Drawings

15 KEK Test Beam Beam time request on the  2 line at KEK. Planned test of 4 stations (original 3 from prototype plus 4 th being built now) in order to finalize design. Use BESS magnet (1T field) in order to make momentum measurement, look at pattern recognition in real detector compared with simulation, etc... Planning for two short shifts (~1 week each) Work underway to design support structures, build a DAQ system that can be operated outside of Fermilab, sort out particle ID, triggering, etc...

16 BESS Magnet

17 Simulation/Analysis plans Input beam description: –Was using G4BeamLine, however do not have the time/expertise to produce large statistics. –Kevin Tilley has provided 700k events from TURTLE, which can now be used in G4MICE. –Both simulations are of the “June04” beam- line. –First comparison between the two shows reasonable agreement

18 G4BL vs TURTLE P Z (MeV/c) P T (MeV/c) Solid histogram is from G4BeamLine and the dashed is from TURTLE

19 RF Background Have made first run using latest RF background code from Rikard. This code uses a lot of CPU (2~3 events per hour on an IC machine). Hopefully it will be possible to use a sample of RF produced by Rikard to generate the large statistics in a week or so (as discussed at the last VC). Otherwise, I will make a low statistics run with background and do high stats without. Good news – the new background code produces a lot less hits in the tracker...

20 RF Background Simulation New RF background is the solid histogram Old simulation produces the dashed histogram. No longer see extremely high hit count in the Sci Fi due to the RF!

21 Production Plans Yagmur plans to commit an improved description of the cooling channel this week. At that point, I will start the production of simulated data from the TURTLE files that Kevin has provided. If a quick RF BG simulation is available, it will be used, otherwise a parallel production of much lower statistics using Rikard’s existing code will also be launched. This should (hopefully) allow just enough time to then perform the digitisation and reconstruction in time for the meeting at RAL...