LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.

Slides:



Advertisements
Similar presentations
CLIC CDR Schedules & Value Estimates Philippe Lebrun on behalf of the CLIC Cost & Schedule WG LCWS 12 University of Texas at Arlington, USA 22 – 26 October.
Advertisements

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Construction and Installation of the CLIC Experimental Area
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
ILC A SIAN D RAFT S CHEDULE K Foraz, M Gastal & J Osborne Many thanks to all contributors.
From LHC to CLIC and FCC: some common issues in the study of future large accelerator projects Philippe Lebrun CLIC Workshop 2014 CERN, 3-7 February 2014.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
CLIC-ILC Cost & Schedule Working Group Meeting TILC09 – Sunday, April 19, 2009 reported by Peter H. Garbincius CLIC_ILC_phg_21april09.ppt.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
Sendai, March 3, 2008 TILC08 · GDE Meeting Global Design Effort 1 TILC08 · GDE Meeting on International Linear Collider · Tohoku University Sendai · Japan.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Agenda : CLIC Civil Engineering and Services (CES) WG.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Survey Meeting John Osborne, CERN 8 February 2016
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Civil Design for Tunnel Case Studies
Installation Global System
CLIC Civil Engineering Update
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Acknowledgements to all FCC study teams
Tunnel Cross Section Studies
CLIC-ILC Cooperation ILC “PAC Review” – Vancouver May 9, 2009 Conventional Facilities Cost & Schedule Working Groups reported by Peter H. Garbincius.
CLIC / ILC Collaboration for CFS works
5th FCC Infrastructure & Operation meeting
Latest ILC tunnel cross section May 2017
FCC-ee MDI Civil Engineering update
FCC Tunnel and Shaft Cross Sections
Summary Some Issues of Future Consideration
Detector hall in mountain regions
ILC DRAFT CONSTRUCTION SCHEDULE Flat topography & Mountainous sites
A very first look at siting issues
Cost & Schedule between Shaft and Adit for Access of Detector Hall
Key Issues CPOC Update February 2011 Second Avenue Subway TBM Drive #1
RDR Baseline Layouts for Interaction Region
Presentation transcript:

LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009

(2.88km) 7-5 (5.54km) 5-3 (5.1km) 3-1 (2.6km) 1-2 (2.6km) 2-4 (4.6km) 4-6 (4.6km) 6-10 (2.88km) ILC - Civil engineering works Tunnel excavation Site installation & shaft excavation Cavern and halls Tunnel concrete and finishes TBM installation Shaft excavation and Cavern-halls construction based on same hypothesis as M. Gastal = unlimited resources Times derived from Amberg Studies K. Foraz - CERNTILC09 & GDE AAP review – Tsukuba April 2009

(2.88km) 7-5 (5.54km) 5-3 (5.1km) 3-1 (2.6km) 1-2 (2.6km) 2-4 (4.6km) 4-6 (4.6km) 6-10 (2.88km) ILC - Civil engineering works Tunnel excavation Site installation & shaft excavation Cavern and halls Tunnel concrete and finishes TBM installation Excavation : 9 TBM - 200m/wk Concrete and finishes: 400m/wk K. Foraz - CERNTILC09 & GDE AAP review – Tsukuba April 2009

(2.88km) 7-5 (5.54km) 5-3 (5.1km) 3-1 (2.6km) 1-2 (2.6km) 2-4 (4.6km) 4-6 (4.6km) 6-10 (2.88km) ILC - Civil engineering works Tunnel excavation Site installation & shaft excavation Cavern and halls Tunnel concrete and finishes TBM installation Civil engineering will give you part of machines, and not meters K. Foraz - CERNTILC09 & GDE AAP review – Tsukuba April 2009

(2.88km) 7-5 (5.54km) 5-3 (5.1km) 3-1 (2.6km) 1-2 (2.6km) 2-4 (4.6km) 4-6 (4.6km) 6-10 (2.88km) ILC - General Services Piping & ventilation Survey : geodesics & marking positions Electrical general services Cabling Assumptions: unlimited resources meaning 12 teams for each type of work and for each tunnel !!! (24 teams of electricians for instance) Estimated progress rate per team: around 120m/wks K. Foraz - CERNTILC09 & GDE AAP review – Tsukuba April 2009

(2.88km) 7-5 (5.54km) 5-3 (5.1km) 3-1 (2.6km) 1-2 (2.6km) 2-4 (4.6km) 4-6 (4.6km) 6-10 (2.88km) ILC - Machine installation Support installation and alignment (250m/wk) Machine inst.: transport and interconnections (progress rate to be confirmed 100m/wk) Assumptions: unlimited resources !!!! In summary for 7 years installation 9 TBM, 24 electricians teams, 12 cooling and ventilation teams, 12 teams for machine installation Are you able to provide all the machine components in 9 months ??? K. Foraz - CERNTILC09 & GDE AAP review – Tsukuba April 2009

Resources comparison with CLIC What would be the ILC schedule if machine installation is performed with 2 teams, & what shall be the other resources ? CLIC (  1) CLIC (  2) ILC Nb of TBM29 Nb of teams for elec. general services424 Nb of teams for cooling and ventilation412 Nb of teams for cabling424 Nb of teams for machine installation y10.5y6y K. Foraz - CERNTILC09 & GDE AAP review – Tsukuba April 2009

(2.88km) 7-5 (5.54km) 5-3 (5.1km) 3-1 (2.6km) 1-2 (2.6km) 2-4 (4.6km) 4-6 (4.6km) 6-10 (2.88km) ILC Schedule smoothed Support installation and alignment (250m/wk) Machine inst.: transport and interconnections (progress rate to be confirmed 100m/wk) K. Foraz - CERNTILC09 & GDE AAP review – Tsukuba April 2009

Resources comparison with CLIC CLIC (  1) CLIC (  2) ILC Nb of TBM24 Nb of teams for elec. general services48 Nb of teams for cooling and ventilation44 Nb of teams for cabling48 Nb of teams for machine installation22 7.2y10.5y9.5y K. Foraz - CERNTILC09 & GDE AAP review – Tsukuba April 2009