EI Toolkit Sample Submitted: November 2003 Legacy System Retirement Report The following pages reflect a SAMPLE report used by Commercial Industry Company.

Slides:



Advertisements
Similar presentations
Implementing the Business Modernization Strategy.
Advertisements

Prioritising Primary Care Premises Developments Strategic Service Development Plans Keith Houghton, Associate Consultant NatPaCT/ NHS Estates.
Portfolio Management Initiative
Portfolio Management, according to Office of Management and Budget (OMB) Circular A-16 Supplemental Guidance, is the coordination of Federal geospatial.
Infrastructure Study and Assessment (INSA) and State Portal Upgrade N.C. Office of Information Technology Services Infrastructure Study and Assessment.
HR SERVICE REQUEST SYSTEM Department Demonstrations February 2012.
Sharing Good Practice in Quality
How to Submit a Human Post- Approval Activity (PAA) - Amendment.
Presented By: Thelma Ameyaw Security Management TEL2813 4/18/2008Thelma Ameyaw TEL2813.
“Partnering to Make IT Happen” Welcome to the EMF Symposium February 23, 1999 Enhancing Alignment of IM/IT with Business Chief Information Officer Branch.
DTMB Enterprise Portfolio Management with Changepoint PPM
EMerger Collaborative Merger Integration & Management Solution April 2001 v1.0.
Presented to: MPAR Symposium II By: James Williams – Director, Systems Engineering and Safety Date: 17 November 2009 Federal Aviation Administration Multifunction.
Chapter 10 Information Systems Management. Agenda Information Systems Department Plan the Use of IT Manage Computing Infrastructure Manage Enterprise.
Astrix Technology Group Extending The LIMS To Benefit External Stakeholder Groups Robert D. Walla Presented At Pittcon 2006 Orlando, FL.
Web Design Project Plan Objective: –Get the new Web site to go live Approach: –Review current status –Identify remaining work –Prioritize remaining work.
The Methodology for Business Transformation (MBT): A Well Rounded and Practical Application of Enterprise Architecture A|EA August Meeting Presented By:
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Page 1 USOAP CMA on SSP – Rollout. Page 2 Annex 19 Adopted by the Council on 25 February 2013; Became effective on 15 July 2013; and Became applicable.
Business Acquisition Process Implementation & transition Closing Negotiation of the transaction Due Diligence Engagement TargetIdentification.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Organizational Information System.  IS is an integrated IT based system designed to support operations, mgt and decision making function of an organization.
A Methodology that is PROVEN PRACTICAL EFFECTIVELY INTEGRATED SCALABLE CUSTOMIZABLE.
1 RHD Cost Sharing Review Update 2011 UBCM Convention Presented by RHD Cost Sharing Review Implementation Group September 26, 2011.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Corporate Structure & Companies
November 2013 This is UTC Building & Industrial Systems.
Presentation to Contra Costa County Climate Leaders October 3, 2013.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Jackie McIntosh Glasgow City Council Development & Regeneration Services.
WQ Partnership September 5 th,  26 grant and loan programs  1,138 active agreements totaling $954M as of June 2012  450 new grant and loans totaling.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Cabinet for Health & Family Services Office of Information Technology.
National Institute of Standards and Technology Information Technology Laboratory 1 USG Cloud Computing Technology Roadmap Next Steps NIST Mission: To promote.
The Global Facility for Disaster Reduction and Recovery GFDRR’s New MDTF and Work Plan Luis Tineo, Sr. Operations Officer.
Office of the Chief Financial Officer Gwendolyn Sykes Chief Financial Officer November, 2007 © Yale University 2007.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
GLOCO – Integrated Corporate Portal Part 3 – Implementation Plan Presented by Team 3 1 Team 3 Members: Joyce Torres Kenneth Kittredge Pamela Fisher Ruzhena.
Robert M. Summers, Ph.D. September 16, 2015 How can we make sure the Chesapeake Bay Restoration really works?
National PTA Standards of Affiliation (an SOA required training)
Copyright 2007 – All rights reserved Getting Started GigaWealth Corporation.
Bell Ringer – 5/27/08 1.Examine the list of “work skills” on page 98. Identify 2 of the skills that you feel you possess strongly and identify a career.
1 Based on PMI the Methodology. 2 This document has a sole propriety owner. © 2015 i-Clipse Technology, a Private Canadian Corporation. All rights reserved.
SACS/CASI District Accreditation  January 2007  April 2007  May 2007  January – April 2008  Board Approval for Pursuit of District Accreditation.
S UPPORT S ERVICES D EPARTMENT - L EADERSHIP T EAMS Involving Everyone in continuous improvement! Session 4 – April15 th, 2011.
NTIA Briefing EL-CID, FSMS & OSM-DD
Multimodal Investment Network MIN Development Multimodal Investment Networks (MIN) are projects that the Commonwealth of Virginia will potentially implement.
1 USE OF ISO 9000 IN GOVERNANCE AND SERVICE COMPANIES: A BASIS FOR BUILDING AN INTEGRATED MANAGEMENT SYSTEM Valentin Nikonov PMP IPMA, QMS Auditor.
1 Air Tour Operating Authority (ATOA) Reporting System What It Is:  A web based system that enables its users to report, track, and manage air tour operating.
Electronic claim file 21 May 2008 ADAM STAFFORD. © Lloyd’sELECTRONIC CLAIM FILE UPDATE January Aim of the Electronic Claims File Improve service.
Select Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
MODPO Project Update Overview of December Implementations & EDW Changes Commercial Operations Subcommittee December 11, 2006.
Our continuous efforts and investments in maintaining our security infrastructure reflects our commitment to protect.
 The concept of Quality is very broad and can be defined in various way:  From the customer point of view: (Specification Quality) › Quality is the.
Ahead4 Development Approach Copyright Ahead4.biz 2015.
ITIL SERVICE LIFECYCLE
The Five Secrets of Project Scheduling A PMO Approach
FORWARD THINKING BUILDING THE RIGHT RETIREMENT PLAN FOR YOU
Astrix Technology Group
Traceability of Gas Pipeline Materials Research & Materials Manager
Digital Transformation Forum
Asset Acquisition through Direct Capitalization
Portfolio Management Process & Customer Request Management
Digital Transformation Forum
Data Security and Protection Toolkit Assurance 2018/19
Presentation transcript:

EI Toolkit Sample Submitted: November 2003 Legacy System Retirement Report The following pages reflect a SAMPLE report used by Commercial Industry Company #3 to track the retirement of legacy systems. Most retirements are a result of implementing integrated systems. EITK0304

COMPANY PRIVATE EI Toolkit Sample Submitted: November Legacy System Retirement Review all systems on a regular basis – particularly prior to planning and embarking on a new acquisition All expenditures to legacy systems should be approved by upper management (CIO) Using outside sources to maintain legacy systems makes it easier to control Capture costs of maintaining and enhancing each system Use costs to help drive and prioritize systems to shutdown Secure management support to assure you do not continue to invest in systems that are planned to be shut down.

COMPANY PRIVATE EI Toolkit Sample Submitted: November Legacy System Retirement Determine which systems are not being used Determine which systems should be replaced / integrated Some legacy systems may need to stay up during a ‘phased’ implementation Plan and monitor legacy system retirement Report on status and progress on a regular basis (see sample report)

COMPANY PRIVATE EI Toolkit Sample Submitted: November Legacy Retirement

COMPANY PRIVATE EI Toolkit Sample Submitted: November Legacy Retirement Legacy Retirements: 120 Systems in 2002, 65 systems in 2003