ECFA04 - 3 Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.

Slides:



Advertisements
Similar presentations
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
Advertisements

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
28 February 2003Paul Dauncey - HCAL Readout1 HCAL Readout and DAQ using the ECAL Readout Boards Paul Dauncey Imperial College London, UK.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
2 October 2003Paul Dauncey1 Paris Summary Part 2 and Status of UK Electronics/DAQ Paul Dauncey Imperial College London, UK.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
10 Nov 2004Paul Dauncey1 MAPS for an ILC Si-W ECAL Paul Dauncey Imperial College London.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
30 th June 2004Daniel Bowerman1 Dan Bowerman Imperial College LCUK Meeting - Lancaster 30 th June 2004 Calice Status For the CALICE-UK groups: Birmingham,
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
1 H-Cal front-end ASIC Status LAL Orsay J. Fleury, C. de la Taille, G. Martin, L. Raux.
ECFA Sep 2004Paul Dauncey - ECAL DAQ1 Thoughts on Si-W ECAL DAQ Paul Dauncey For the Imperial/UCL groups D. Bowerman, J. Butterworth, P. Dauncey,
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Mark ThomsonLCUK Meeting, Oxford CALICE STATUS Mark Thomson University of Cambridge  Overview  UK Hardware  UK Simulation  UK Reconstruction  Conclusions.
Calice ECAL Readout Hardware Status report Adam Baird ECAL Meeting 26 Sept 2003 LLR-Ecole Polytechnique.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group: A. Baird, D. Bowerman,
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
10 th November 2004Daniel Bowerman1 Dan Bowerman Imperial College Calice Meeting - UCL 10 th November 2004 Electronics Status For the Imperial, Manchester,
2 April 2003Paul Dauncey - CALICE DAQ1 First Ideas For CALICE Beam Test DAQ Paul Dauncey Imperial College London, UK for IC, Manchester, RAL, UCL.
1 Sept 2005Paul Dauncey1 MAPS award and issues Paul Dauncey Imperial College London.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
18 Jan 2006DAQ - Paul Dauncey1 DAQ/Online: readiness for DESY and CERN beam tests Paul Dauncey Imperial College London.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
25 Feb 2005Paul Dauncey1 TB Review: DAQ Paul Dauncey Imperial College London For Imperial, RAL, UCL.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
23 October 2003Martin Postranecky, UCL CALICE CERC Testing Page 1 PRODUCTION BOARDS TESTING 1)9x PCBs 2)16x SCSI each = 144x Connectors 3)~ 70x SCSI Cables.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 2 Paul Dauncey Imperial College London.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For CALICE-UK electronics group: A. Baird, D. Bowerman, P. Dauncey,
8 December 2004Paul Dauncey1 ECAL Readout Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, R. Halsall, M. Postranecky,
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
4 November 2002Paul Dauncey - Electronics1 UK Electronics Status Paul Dauncey Imperial College London.
Front-End electronics for Future Linear Collider W-Si calorimeter physics prototype B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
HaRDROC performance IN2P3/LAL+IPNL+LLR R. GAGLIONE, I. LAKTINEH, H. MATHEZ IN2P3/IPNL LYON M. BOUCHEL, J. FLEURY, C. de LA TAILLE, G. MARTIN-CHASSARD,
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
VFE & PCB Status & schedule of production Presented by Julien Fleury Christophe de La Taille, Julien Fleury, Gisèle Martin-Chassard.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
PreShower Characterisations
CALICE(-UK) Status Paul Dauncey 28 Apr 2004 Paul Dauncey.
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
PRODUCTION BOARDS TESTING
UK ECAL Hardware Status
STATUS OF SKIROC and ECAL FE PCB
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
PRODUCTION BOARDS TESTING
Trigger issues for the CALICE beam test
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Presentation transcript:

ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M. Postranecky, M.Warren, O. Zorba Thanks to: J.C. Vanel, J. Fleury, C. de la Taille

ECFA Sep 2004Paul Dauncey - CALICE Readout2 CALICE ECAL has 30 layers, 18  18 channels/layer, 9720 total Each gives analogue signal, 14-bit dynamic range required Very-front-end (VFE) ASIC (FLC_PHY from LAL-Orsay) multiplexes 18 channels to one output line VFE-PCB handles up to 12 VFEs (216 channels) Cables from VFE-PCBs go directly to UK VME readout boards, called Calice Ecal Readout Cards (CERCs) Readout electronics overview

ECFA Sep 2004Paul Dauncey - CALICE Readout3 Prototype verification tests Talk will show results of summer tests To release designs of VFE and CERC for production Orsay VFE PCB V2_2 boards Using VFE chip FLC_PHY3 Preproduction version Three boards available One each full, left-handed, right-handed CERC UK readout boards Prototype version Fully populated

ECFA Sep 2004Paul Dauncey - CALICE Readout4 Wafer 1 Noise tests Software selectable gain on VFE PCBs;  1 or  8 Full PCB has 6 wafers mounted; wafer 1 does not deplete Gain x8 Gain x1 Gain  1 noise= 7.2 ADC counts, gain  8 noise= 52 ADC counts 1 ADC count = 78  V. No obvious dead channels Wafer 1

ECFA Sep 2004Paul Dauncey - CALICE Readout5 Calibration with DAC Need to determining timing Output signal is shaped by CR-RC circuit, shaping time ~200ns Adjust timing so that sample-and-hold captures peak Can change timing in software configuration; steps of 6.25ns Scan sample-and-hold time and fit for peak With timing set correctly, scan DAC From zero to channel saturation 16-bit DAC, 1 DAC count = 20  V Determine mean and noise at each point Fit for intercept and response Channels divided into 6 groups for DAC Calibration can be enabled independently for each group Look at response of non-enabled channels Measure crosstalk

ECFA Sep 2004Paul Dauncey - CALICE Readout6 Timing determination Typical channel (first one on right-handed PCB), gain  1 Fit CR-RC xe 1–x shape to response (averaged over 19 events) Shaping time = p3 = units  6.25ns = 196 ns

ECFA Sep 2004Paul Dauncey - CALICE Readout7 Timing determination (cont) Shaping times measured for left-handed and right-handed PCBs Left-handed Right-handed Shaping times vary chip-to-chip; uniform to ±3% One unresponsive channel on right-handed PCB

ECFA Sep 2004Paul Dauncey - CALICE Readout8 DAC scan Slope = ADC counts/DAC count = 9.57V/V (expect 10) High end saturation from VFE-PCB preamplifier Very close to top of ADC range (32k); well matched Low end saturation from CERC board; understood - due to DAC Will be fixed in production version Typical channel (same as before), gain x1

ECFA Sep 2004Paul Dauncey - CALICE Readout9 DAC scan (cont) Results for left-handed and right-handed PCBs Left-handed Right-handed Responses uniform to ±10% Same unresponsive channel on right-handed PCB shows up here

ECFA Sep 2004Paul Dauncey - CALICE Readout10 DAC crosstalk Typical non-enabled channel (same as before) Slope ~ 0.02 compared with ~ 2.5 for signal slope Crosstalk is less than 1% of signal Noise shows no significant increase

ECFA Sep 2004Paul Dauncey - CALICE Readout11 DAC crosstalk (cont) Crosstalk uniform to ±25% for most enables A few channels show bigger crosstalk ~10% due to close tracking on VFE-PCB; can be reduced in production version Six different combinations of non-enabled channels Typical results for left-handed and right-handed PCBs Left-handed Right-handed

ECFA Sep 2004Paul Dauncey - CALICE Readout12 Cosmics run Full PCB used in Ecole Polytechnique teststand, but… Wafer 1 not depleted so no signal seen on it Bad ADC on CERC for wafer 4; half the wafer had very high noise Ran over weekend June Total ~ 60 hours, 130k events; worked reliably throughout Around 90% have unique track from scintillator hodoscope Interpolate into plane of PCB; cut on any ADC value > 40 above pedestal

ECFA Sep 2004Paul Dauncey - CALICE Readout13 Cosmics alignment Compare x and y scintillator interpolation with channel position Single peaks; proves no mis-wiring of channels or readout Hence, align coordinate systems to agree Width of  x and  y distributions ~ 0.9cm xx yy xx yy

ECFA Sep 2004Paul Dauncey - CALICE Readout14 Cosmic signal response Simple Gaussian fit gives signal peak at 45 ADC counts = 3.5mV But S/N = 4.3, i.e. noise is 10 counts, not 7 counts Require interpolation within 0.9cm of pad centre All (good) channels combined

ECFA Sep 2004Paul Dauncey - CALICE Readout15 Cosmic signal response (cont) Clear signal seen in all good wafers/chips Divide into separate chips Wafer 1 is chips 2 and 3, bad ADC is chip 8 Chips 0-3 Chips 4-7 Chips 8-11

ECFA Sep 2004Paul Dauncey - CALICE Readout16 Cosmic signal response (cont) Look at signal and S/N for good chips Both uniform to ± 3% Fit gives slightly higher signal ~ 49, and hence S/N ~ 4.9

ECFA Sep 2004Paul Dauncey - CALICE Readout17 Cosmic signal response (cont) Pushing the stats, look at signal and S/N for good channels No obvious bad channels…

ECFA Sep 2004Paul Dauncey - CALICE Readout18 Prototype tests completed successfully in June Minor modifications for VFE-PCB and CERC identified VFE-PCB released for production in July See talk by B. Bouquet CERC redesign was finalised in August Production boards being sent out for fabrication next week Three week turnaround; start testing by end of September ECAL system tests from October onwards Initially at least 10 layers in cosmic teststand at Ecole Polytechnique DESY ECAL electron beam test from November onwards Initially using first 10 layers Build up over several months to full 30 layer ECAL Beam tests with HCAL(s) in hadron beams from 2005 onwards Future plans