Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.

Slides:



Advertisements
Similar presentations
February 17-18, 2010 R&D ERL Edward T. Lessard R&D ERL Meeting Accelerator Safety Order (ASO) Requirements E. Lessard, Associate Chair for ESSHQ Collider-Accelerator.
Advertisements

Polarized 3He ++ ion source development for RHIC. Check the Bjorken Spin Sum Rule (the difference between the 1st moments of the proton and neutron spin.
Safety Software QA at BNL’s Collider-Accelerator Department (C-AD) Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
David Schultz Accelerator Nov. 12, ‘08 SLAC National Accelerator Laboratory 1 Accelerator Readiness ARR scheduled for Dec.
Kathleen Ratcliffe LTU Installation October 30, LTU Installation Coordination Kathleen Ratcliffe.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
Safety Oversight for SLAC Accelerator Department Operations
Take 5 for Safety Conduct of Operations – Control of Equipment and
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Maintenance and Engineering Procedures and Tools at Soreq Applied Research Accelerator Facility I. Gertz, Y. Buzaglo, A. Grin, R. Michael, R. Raizman,
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Engineering Challenges and Solutions for MeRHIC.
Configuration Management During Shutdown Picture of the Week Collider-Accelerator Department Take 5 for Safety.
From Research Prototype to Production
E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 An EBIS-based RHIC Preinjector - Test EBIS Results Ed Beebe Preinjector Group Collider-Accelerator.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Safety Review for Modifications Calling For Help Safety Photo of the Week Collider-Accelerator Department Take 5 for Safety.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Aviation Maintenance Management
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Maintenance and Accelerator Support RHIC StartUp10.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Work Planning Human Performance Ray Karol May 2010 EBIS ARR.
J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Maintenance and Accelerator Support RHIC Start Up 12.
September 19-20, 2007 E. Lessard EBIS Safety EBIS Project Safety Ed Lessard September 19-20, 2007 DOE Annual Review.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
BNL/AGS RSVP Upgrades Project WBS 1.4 – Breakout Session Rare Symmetry Violating Processes Preliminary Baseline Review Brookhaven National Laboratory 6-8.
Status of RF stations for NICA project MAC meeting october 2015.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Alex Zaltsman Power Amplifiers and LLRF.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
October 4-5, Status of ARRA funded AIPs Stochastic Cooling Alex Zaltsman October 4, 2010 Stochastic Cooling cost and schedule.
1 David Schultz 1 SLAC Self-Assessment Programs meeting ASO Requirements David Schultz LCLS Program Division Director SLAC National.
Michał Matusiak Sławomir Wronka
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
 Safety  Schedule: Past, Present and Future  RHIC and Experiments Reports  Machine and Systems Reports  AOB.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Maintenance and Efficiency
Safety Configuration Management Process at JLab
GlueX Electronics Review Jefferson Lab July 23-24, 2003
LCLS Injector: Introduction D. H
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Electron Beam Systems ETC and Methodology
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Safety Readiness Review (SRR) Thomas Hansson, ESH
Injector/Linac Design Status C. E
LINAC System Engineering / Design Status C.E. Rago
Presentation transcript:

Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking Dave Passarello May 2010 EBIS ARR

Trained and Qualified Staff System Specialist training records maintained in BNL BTMS 1.Contractor Project Manager – J. Alessi (C) 2.Project Integration – A. McNerney (C) 3.Structural Components - E. Beebe (C) 4.Electrical Systems - J. Sandberg (Noise Medical Surveillance) 5.Controls - D. Barton (C) 6.RF Systems – Zaltsman (C) 7.Power Supply Systems - R. Lambiase (C) 8.Diagnostics - M. Wilinski (C) 9.Mechanical Systems - J. Tuozzolo (Noise Medical Surveillance) 10.Vacuum Systems - M. Mapes (C) 11.Magnet Systems - J. Ritter (C) 12.Facilities & Installation - L. Snydstrup (C) 13.Installation - D. Phillips (Noise Medical Surveillance) 14.Cooling Systems - J. Scaduto (C) 15.Facility Modifications - A. Pendzick (C) 16.Physics Support – D. Raparia, (C)

EBIS ARR CONFIGURATION MANAGEMENT EBIS BEAMLINE LAYOUT

EBIS ARR CONFIGURATION MANAGEMENT Nine Level 1 Systems associated with EBIS BEAMLINE LAYOUT ( ) DIPOLE MAGNETS TO BOOSTER INSTALLATION QUAD/INSTRUMENTATION INSTALLATION RFQ/LINAC INSTALLATION EBIS INJECTION EBIS MAIN ASSEMBLY " VAT VALVE MOD NEG PIPE INSTALLATION 8.ACCT-CF _1-1 CURRENT TRANSFORMER (PURCHASED) 9.GMM-A7353 ACCELERATION TUBE W/ELECTRODE (PURCHASED) Currently 868 engineering drawing associated with items 1 through 7

EBIS ARR Configuration Management - DRAWINGS Preparation & Issuance of Engineering Drawing/ Specifications – a Design Review Questionnaire 1.General Design Questions 2.Safety, Security and QA 3.Electrical 4.Structural and Pressurized Systems 5.Equipment Layout and Installation 6.Ionizing Radiation Shielding 7.Materials 8.Vacuum 9.Drawings 10.Thermal 11.Vibration, Noise and Natural Phenomena 12.Manufacturing 13.Software, PLC, Firmware, Human Factors and Controls – b Design Review Request Form Configuration Management

CONFIGURATION MANAGEMENT – PROCEDURES DOE Order 420.2B requires procedures for following processes: 1.Operation Startup OPM 2.5, Accelerator Safety Envelope Parameters for AGS, Booster, Linac, EBIS and Associated Experimental Areas System expert procedures Procedure for turning on the EBIS electron gun Procedure for energizing the EBIS superconducting solenoid Procedure for the unattended operation of the EBIS superconducting solenoid Procedure for applying voltages to EBIS electrodes EBIS high voltage platform pulsing supply – turn on / turn off procedure 2.Normal operation > Not applicable to commissioning ARR 3.Emergency Conditions OPM 3.0, Local Emergency Plan for the Collider-Accelerator Department OPM 3.X.X 4.Conduct of maintenance OPM 2.28, C-A Procedure for Work Planning and Control for Operations EBIS ARR

DOE Order 420.2B requirement continued 6.Approval and conduct of experiments > Not Applicable 7.Review and approval of facility modifications Procedure for Documenting Unreviewed Safety Issues 2.42Liaison Engineer, Physicist; Project Engineer and Physicist; Liaison Scientist: Roles and Responsibilities for Modifications 9.1.1Procedure for Obtaining a Review by C-A Radiation Safety Committee 9.3.1Procedure for Reviewing Conventional Safety Aspects of a C-A System Configuration Management 8.Management of safety-related changes Procedure for Documenting Unreviewed Safety Issues 2.42Liaison Engineer, Physicist; Project Engineer and Physicist; Liaison Scientist: Roles and Responsibilities for Modifications 9.1.1Procedure for Obtaining a Review by C-A Radiation Safety Committee 9.3.1Procedure for Reviewing Conventional Safety Aspects of a C-A System Configuration Management 9.Control of facility access Postings, Barriers and Procedures EBIS ARR

Configuration Management - Procedures Operations Procedures Manual (OPM) maintained (≈ 1200) OPM 1.4.3Procedure for Implementing New or Revised Permanent Procedures, or Canceling Permanent Procedures – Documented review for initial release and all revision – Mandatory 3 year review EBIS procedures in section 15.10, Pre-Injector Systems Section Test EBIS EBIS Pre-Injector

Reviews Hazard Screening Report for EBIS Project (3-2006) ATS 3160, 126 action items, 122 closed, 4 on schedule BORE - Bldg 930 EBIS Facility (9/19/2007) ATS 3956, 15 action items, 14 closed LESHC a.09-02Equivalency Ruling for EBIS Superconducting Solenoid (3/6/2009) 1 Post meeting action, action closed b.09-09Spare Magnet for the EBIS (8/9/2009) 2 Post meeting action, 0 closed, on schedule c.09-12EBIS USI & RHIC, AGS, Booster, LINAC & EBIS ASE’s (12/3/2009) No Post meeting actions EBIS ARR

RSC a.EBIS (4/12/2006) a.EBIS Port w/Protons Injected into Booster via LtB (3/20/2007) b.EBIS Cable Penetrations (10/10/2008) ASSRC a.Kick-off Meeting on EBIS Project (8/30/2007) ATS 5231, 14 action items, 10 closed, 4 actions on schedule b.Walkthrough of EBIS High Voltage Cage and the Solenoid-Working Towards Generating a Low Intensity Electron Beam (11/3/2009) ATS 5232, 6 action items, 0 closed, 6 actions on schedule c.Update on EBIS Project Status (2/23/2010) ATS 5139, 9 action items, 1 closed, 8 actions on schedule d.Walkthrough of EBIS Equipment Outside the HV Cage (4/19/10 ) ATS 5239, 2 action items, 0 closed, 2 actions on schedule EBIS ARR

Questions ?