RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June 2010 113 RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.

Slides:



Advertisements
Similar presentations
ISIM Integration & Test Mike Drury JWST-PRES
Advertisements

THEMIS Instrument CDR 1 UCB, March 24-25, 2004 EFI AXIAL BOOMS (“AXB”) Critical Design Review Rob Duck Mechanical Engineering Department Space Sciences.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June 2010 RBSP EFW PREAMPS Rachel Hochman Space Sciences Laboratory.
3-4 Sept. 2008EFW INST+SOC PDR141 Electric Field and Waves (EFW) Spin Plane Boom (SPB) Gregory Dalton Space Sciences Laboratory University of California.
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
THEMIS PER 1 UCB, May 02, 2005 Magnetometer Booms Pre Environmental Review Prof. Hari Dharan Berkeley Composites Laboratory (Presenter: David Pankow) Department.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
THEMIS Instrument CDR Bill Donakowski/ EFI Radial Boom 1 UCB, April EFI Radial Boom (SPB Spin Plane Boom) Bill Donakowski
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Instrument Testing to Date Michael Ludlam for EFW.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Pre-Ship IIRT Telecon EFI 1 Telecon, Dec. 5, 2006 THEMIS Pre-Ship IIRT Telecon EFI Preamp Current Consumption John Bonnell EFI Lead University of California.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes Sept 30 – Oct RBSP EFW ICDR1 Integration and Test Michael Ludlam (EFW Systems Engineer)
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
THEMIS INSTRUMENT SUITE
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Gayle K. Martin November 14, 2016
Solar Probe Plus FIELDS Mechanical Pre-Environmental Review
Spacecraft Interface and I&T
(EFW Systems Engineer) University of California, Berkeley
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS Mission Assurance
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
THEMIS FM4/FM5 INSTRUMENT SUITE
Low Voltage Power Supply & Power Controller Board
0.0 Instrument Suite Name Presenter’s name
University of California, Berkeley
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
Presentation transcript:

RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences Laboratory University of California, Berkeley

RBSP/EFW Boom PER 30 June 2010Greg Dalton 114 SPB Overview SENSOR SPHERE PREAMPLIFIER ENCLOSURE COMPOSITE CABLE FINE WIRE RELEASE MECHANISM METERING WHEEL OVER TENSION HARNESS CONNECTORS SPOOLENABLE PLUG

RBSP/EFW Boom PER 30 June 2010Greg Dalton 115 SPB Status F1 & F2 SPB’s ready for cable integration

RBSP/EFW Boom PER 30 June 2010Greg Dalton 116 Assembly and Test Flow

RBSP/EFW Boom PER 30 June 2010Greg Dalton 117 Facilities and MGSE High Bay deployment for self-shock and length calibration –Door opening self-shock test –Verify proper opening of doors, IDPU indication –Monitor current and voltages of motor, pin puller –Length Calibration, meter wheel turns counter Functional deploy MGSE High Bay flying pulley MGSE

RBSP/EFW Boom PER 30 June 2010Greg Dalton 118 Facilities and MGSE Vibration Facility – Quanta Laboratories, Santa Clara –Readily available for testing –Force limiting test performed on ETU –One instrument per day Vibration per EDTRD: Vibe fixtures for RBSP S/C mounting – force limiting Unpowered Testing ETU to qualification levels, flight to protoflight levels Test sequence on all three axis: o Fixture only all tests o ¼ G sweep to verify 1 st mode o ½ 40 Hz to validate controller and force gages o Random o ¼ G Sweep o Hz Sine Strength o ¼ G Post Sweep

RBSP/EFW Boom PER 30 June 2010Greg Dalton 119 Facilities and MGSE Thermal Vacuum Chamber – SSL –Chamber used on for THEMIS SPB deployments –Mechanical GSE ready for TVAC deployment –Chamber prepared for testing

RBSP/EFW Boom PER 30 June 2010Greg Dalton 120 Facilities and MGSE Deployment Sequence (video)

RBSP/EFW Boom PER 30 June 2010Greg Dalton 121 TVAC Profile One full survival cycle 3 operational temperature cycles Hot deploy Cold Deploy Six cycles total CPT to verify electronics functionality

RBSP/EFW Boom PER 30 June 2010Greg Dalton 122 ECN Summary ECN-006 –ECN closed out –New Parts made, added to Cable Fabrication assembly –Description:

RBSP/EFW Boom PER 30 June 2010Greg Dalton 123 RFA Summary EFW-CDR-10/11 –RFA from CDR closed out –Analysis was completed and report delivered –Description: EFW-CDR-10 Action: Verify deployment ring spring stress margin (update stress table on chart 466) Increasing spring tension lowers stress margin. Rationale: Deployment ring uses two springs in tension to help actuate the restraint mechanism. EFW-CDR-11 Action: Verify deployment spring force margin at worst case condition Rationale: Deployment ring uses two springs in tension to help actuate the restraint mechanism.

RBSP/EFW Boom PER 30 June 2010Greg Dalton 124 PFR Summary PFR-006 –PFR dated 4/7/10 closed out –PFR report submitted and accepted –Description: While removing SPB Preamplifier PWB Assembly #16 from the Preamplifier TVAC MGSE, the Ferrule Spring caught on the technicians glove and was pulled from the Preamplifier Enclosure. The technician bobbled the PWB Assembly, which then rolled down the technician's smock, along the technician's pant leg to his shoe, then free-fell a distance of 6 inches to the floor. –Corrective Action/Resolution: The SPB #16 Preamplifier PWB Assembly was inspected under a microscope by SSL QA. It was then electrically bench tested satisfactorily, then satisfactorily completed a thermal vacuum electrical test.The corrective action is to take care when handling Preamplifier PWB Assemblies, ensuring the preamplifier is assembled/disassembled near a surface and removes the possibility of dropping. The technician shall use a pair of tweezers to remove the Preamplifier PWB Assembly and maintain positive control. This will minimize the risk of the Ferrule Spring from catching on gloves, ESD jacket sleeve, or other GSE.

RBSP/EFW Boom PER 30 June 2010Greg Dalton 125 SPB Status Instrument Status –F1 instruments are completely built, CPT complete, initial High Bay deployment (self-shock) and length calibration complete –F2 instruments at built at sub-component level –Flight Spares (2) are built at sub-component level –All instruments built to print per RBSP-EFW-SPB-003 Indentured Drawing List Revision C Documentation –Travelers complied –No outstanding ECN’s, RFA’s, or PFR’s –Procedures for environmental testing are signed off Electrical Comprehensive Performance Test Vibration Test Procedure Thermal Vacuum Test Procedure

RBSP/EFW Boom PER 30 June 2010Greg Dalton –This page intentionally almost blank 126