LAL Site Report Michel Jouvin LAL / IN2P3

Slides:



Advertisements
Similar presentations
HEPIX May 2004 Edinburgh Linux/Unix highlights.
Advertisements

LAL Site Report Michel Jouvin LAL / IN2P3
Anti-SPAM experience at LAL Michel Jouvin LAL / IN2P3
SUS Feature Pack for SMS Michel Jouvin LAL / IN2P3
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Torsten Antoni – LCG Operations Workshop, CERN 02-04/11/04 Global Grid User Support - GGUS -
4/2/2002HEP Globus Testing Request - Jae Yu x Participating in Globus Test-bed Activity for DØGrid UTA HEP group is playing a leading role in establishing.
Cross Platform Single Sign On using client certificates Emmanuel Ormancey, Alberto Pace Internet Services group CERN, Information Technology department.
LAL Site Report Michel Jouvin LAL / IN2P3
DESIGNING A PUBLIC KEY INFRASTRUCTURE
1/11/2000LDAP Status Report - HEPix - JLab 2000 LDAP Status Report Michel Jouvin LAL / IN2P3
Homework 3.2 Clients Hub What’s wrong with this picture? Clients Using 100TX.
Site report: CERN Helge Meinhard (at) cern ch HEPiX fall SLAC.
GRIF Status Michel Jouvin LAL / IN2P3
STTC 20/08/2002 Eva Sánchez-Corral 1 ST Division W2000 Migration status report Organisation and Management Strategy and Planning Review of experience Status.
Managing CERN Desktops with Systems Management Server (SMS 2003) Michel Christaller Internet Services Group Department of Information Technology CERN May.
Storage Survey and Recent Acquisition at LAL Michel Jouvin LAL / IN2P3
Module 10: Designing an AD RMS Infrastructure in Windows Server 2008.
Database Services for Physics at CERN with Oracle 10g RAC HEPiX - April 4th 2006, Rome Luca Canali, CERN.
Southgrid Status Report Pete Gronbech: February 2005 GridPP 12 - Brunel.
Chapter 7: Using Windows Servers to Share Information.
ScotGrid: a Prototype Tier-2 Centre – Steve Thorn, Edinburgh University SCOTGRID: A PROTOTYPE TIER-2 CENTRE Steve Thorn Authors: A. Earl, P. Clark, S.
Site report: CERN Helge Meinhard (at) cern ch HEPiX spring CASPUR.
Site report: CERN Helge Meinhard (at) cern ch HEPiX fall BNL.
Jefferson Lab Site Report Sandy Philpott Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
IMPLEMENTING F-SECURE POLICY MANAGER. Page 2 Agenda Main topics Pre-deployment phase Is the implementation possible? Implementation scenarios and examples.
Site Report HEPiX/HEPNT 17 April 2002 Catania Paul Kuipers.
Configuring and Troubleshooting Identity and Access Solutions with Windows Server® 2008 Active Directory®
LAL Site Report Michel Jouvin LAL / IN2P3
SMS 2003 Deployment and Managing Windows Security Rafal Otto Internet Services Group Department of Information Technology CERN 26 May 2016.
Paul Scherrer Institut 5232 Villigen PSI HEPIX_AMST / / BJ95 PAUL SCHERRER INSTITUT THE PAUL SCHERRER INSTITUTE Swiss Light Source (SLS) Particle accelerator.
Nov 1, 2000Site report DESY1 DESY Site Report Wolfgang Friebel DESY Nov 1, 2000 HEPiX Fall
Jean-Yves Nief CC-IN2P3, Lyon HEPiX-HEPNT, Fermilab October 22nd – 25th, 2002.
HEPiX/HEPNT TRIUMF,Vancouver 1 October 18, 2003 NIKHEF Site Report Paul Kuipers
RAL PPD Computing A tier 2, a tier 3 and a load of other stuff Rob Harper, June 2011.
30/10/2000 Software Installation and Maintenance at LAL - JLab 2000 Software Installation and Maintenance at LAL Michel Jouvin LAL, Orsay
1 The new Fabric Management Tools in Production at CERN Thorsten Kleinwort for CERN IT/FIO HEPiX Autumn 2003 Triumf Vancouver Monday, October 20, 2003.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
LAL Site Report Michel Jouvin LAL / IN2P3
Module 12 Integrating Exchange Server 2010 with Other Messaging Systems.
Jefferson Lab Site Report Sandy Philpott Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
Light weight Disk Pool Manager experience and future plans Jean-Philippe Baud, IT-GD, CERN September 2005.
Site Report Bristol University HEP group March 2000Jean-Pierre Melot, Bristol2 The People 7 Academics Brian Foster, ZEUS spokesman Greg Heath,
File sharing requirements of remote users G. Bagliesi INFN - Pisa EP Forum on File Sharing 18/6/2001.
CERN-IT Oracle Database Physics Services Maria Girone, IT-DB 13 December 2004.
26/4/2001LAL Site Report - HEPix - LAL 2001 LAL Site Report HEPix – LAL Apr Michel Jouvin
CASPUR Site Report Andrei Maslennikov Lead - Systems Rome, April 2006.
CERN Print Manager Michel Jouvin LAL / IN2P3
Site Report: Prague Jiří Chudoba Institute of Physics, Prague WLCG GridKa+T2s Workshop.
LAL Site Report Michel Jouvin LAL / IN2P3
IN2P3 AD Forest Project Michel Jouvin LAL / IN2P3
MCSE Guide to Microsoft Exchange Server 2003 Administration Chapter One Introduction to Exchange Server 2003.
Active Directory. Computers in organizations Computers are linked together for communication and sharing of resources There is always a need to administer.
RAL PPD Tier 2 (and stuff) Site Report Rob Harper HEP SysMan 30 th June
1/11/2000LAL Site Report - HEPix - JLab 2000 LAL Site Report HEPix – Jlab Nov Michel Jouvin
Evangelos Markatos and Charalampos Gkikas FORTH-ICS Athens, th Mar Institute of Computer Science - FORTH Christos.
VIRTUAL SERVERS Chapter 7. 2 OVERVIEW Exchange Server 2003 virtual servers Virtual servers in a clustering environment Creating additional virtual servers.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
CSS Services Activities Coordination Meeting March 2006 Mark Kaletka, Kevin Hill, Ray Pasetes.
November 28, 2007 Dominique Boutigny – CC-IN2P3 CC-IN2P3 Update Status.
Site Report: CERN Helge Meinhard / CERN-IT HEPiX, Jefferson Lab 09 October 2006.
Chapter 7: Using Windows Servers
Basharat Institute of Higher Education
LCG Deployment in Japan
CC - IN2P3 Site Report Hepix Spring meeting 2011 Darmstadt May 3rd
CERN Certificates platform Emmanuel Ormancey / Anatoly Gladkov
Pierre Girard ATLAS Visit
DAPNIA Site report.
GRIF : an EGEE site in Paris Region
HEPix - SLAC 99 Michel Jouvin
Presentation transcript:

LAL Site Report Michel Jouvin LAL / IN2P3

9/5/2005 LAL Site Report - HEPix - FZK 2005 Main Resources NFS SMB Appletalk www Mail Print LSF Cluster Gb Ethernet DS20 PC (300)Mac (100) Linux Experiments (40 CPUs) DS20e 10 Mb Alpha Experiments (8 CPUs) Electronic CAD (20 Sun CPUs) 100 Mb 100 Go Xterm ESA ,5 TB FC HDS TB FC GRID Fram (40 CPUs)

9/5/2005 LAL Site Report - HEPix - FZK 2005 Main Resources Changes No HW change since BN Hepix –6TB on order (SATA extension to HDS 9570V), 3TB more planned in autumn –Call for tender for new CPUs (20 dual Opteron ?) Linux upgrade to Scientific Linux –Currently installed on all new machines (i386 or amd64) –Upgrade of old RH 7.2/9 machines (25) planned shortly. Will be done with Quattor (currently being set up) Future HW upgrades driven by Tier2 project –x3 in 2006 and 2007 for CPU and storage

9/5/2005 LAL Site Report - HEPix - FZK 2005 Mail Service Authenticated SMTP Spam : Bayesian filtering useful –Filtering efficiency : ~95% - pretty constant –Centralized database (no per user) –Management cost very low since last summer More than 3 months needed to reach current efficiency Feed filter db with a few hundreds of undecteted SPAMs every month coming from 3-5 users Move to Cyrus v2 still a project… Plan to implement a calendar server –Based on CalDAV –Client integrated in Mulberry (and many others probably)

9/5/2005 LAL Site Report - HEPix - FZK 2005 Mail Service : Blacklists LAL mailer blacklisted because of… Squid (Web cache) LAL faulty : Squid misconfiguration allowing to use it as a TCP relay for almost any protocol… –One exploit is to use squid to workaround relay restriction on mailer and use it to send SPAM –Misconfiguration 10 years old…!!! LAL blacklisted by 2 DNS blacklist service : – : very professional, well documented automatic procedure to be removedhttp://opm.blitzed.org – (based on ???) : unable to get the reason, a nightmare to be removed from BL. –Advice : if using blacklist, use well managed ones.

9/5/2005 LAL Site Report - HEPix - FZK 2005 Certificates For 1 year, moving to certificates for Web authorization –Delivered by CNRS to every CNRS employee –Suppress traditional user/pwd auth as much as possible –More service available to LAL users outside lab Moving to certificates for Subversion (CVS replacement) –Subversion access through HTTP + WebDav Moving to certificated for WiKi authorization –Very successfull with Trac –Not working properly with TWiKi Promoting use of certificate for mail signature (or encryption)

9/5/2005 LAL Site Report - HEPix - FZK 2005 Windows Infrastructure IN2P3 forest still very successfull –11 labs in production –All IN2P3 labs should participate –An administrators group set up in April (5 persons, 1 Trac site) –Management cost very low… –Looking at MOM to get centralized alert on key infrastructure components –Move of LAL AD domain to IN2P3 forest delayed Antivirus : moving from F-Secure to McAfee –License policy change at CNRS / french Universities –+ : MSI deployment, - : signatures updates with SMS –A couple of machines infected every month : generally when user has the administrator accout…, cleaning is time consuming…

9/5/2005 LAL Site Report - HEPix - FZK 2005 GRID Paris region Tier2 project officially launched –Will be part of French MOU for LCG –Getting financial support is still a challenge… Partnership of 3 labs : DAPNIA, LAL, LPNHE –Will be 1 unified resource from the GRID –Distributed over 3 sites Target : simulation AND analysis –Opened to all LHC experiments + 20% non LHC (EGEE, local) –CPU capacity : 1500 CPUs –Large amount of storage planned : 300 TB of disks Looking at LUSTRE for a distributed filesystem (HP partnership)

9/5/2005 LAL Site Report - HEPix - FZK 2005 Miscellaneous Projects Quattor : nearly in production… Serial Console Management with SLAC/CERN tool : not yet –Presented at Hepix by C. Boeheim and H. Meinhard Conference organization tool –InDiCo installation postponed (too many problems encountered) EU project based on CERN Agenda, presented at Edinburgh –Agenda started and now in production for internal and external use Automatic visitor registration : postponed –Currently done manually on request (difficult but still manageable) –No WiFi access to visitors (except for conferences) –Dedicated network (routed) for conferences and visitors, not part of the intranet (in progress)