1 Southgrid Status Report Pete Gronbech: February 2005 GridPP 12 - Brunel

2 Southgrid Member Institutions Oxford RAL PPD Cambridge Birmingham Bristol Warwick

3 Status at Warwick No change since Gridpp 11. Third line institute – no resources as yet but remain interested in being involved in the future. Will not receive GridPP resources and so does not need to sign the MOU yet.

4 Operational Status RAL PPD Cambridge Bristol Birmingham Oxford

5 Status at RAL PPD Always on the leading edge of software deployment (Benefit of RAL Tier 1) SL3 cluster on 2.3.0 worker nodes increasing. Legacy service LCG 2.3.0 on RH7.3 (Winding down) CPUs: 24 2.4 GHz, 30 2.8GHz –100% Dedicated to LCG 0.5 TB Storage –100% Dedicated to LCG

6 Status at Cambridge Currently LCG 2.2.0 on RH7.3 Parallel install of SL3 with 2.3.0 using yaim. CPUs: 32 2.8GHz – increase to 40 soon. –100% Dedicated to LCG 3 TB Storage –100% Dedicated to LCG

7 Status at Bristol Status –LCG involvement limited (“black dot”) for previous six months due to lack of manpower –New resources, posts now on the horizon! Existing resources –80-CPU BaBar farm to be switched to LCG –~ 2TB storage resources to be LCG – accessible –LCG head nodes installed by SouthGrid support team with 2.3.0 New resources –Funding now confirmed for large University investment in hardware –Includes CPU, high quality and scratch disk resources Humans –New system manager post (RG) being filled –New SouthGrid support / development post (GridPP / HP) being filled –HP keen to expand industrial collaboration – suggestions?

8 Status at Birmingham Currently LCG 2.2 (since August). Currently installing SL3 on Gridpp Frontend Nodes, will use yaim to install LCG-2_3_0 CPUs: 22 2.0GHz Xenon (+48 soon) –100% LCG 2 TB Storage awaiting “Front End Machines” –100% LCG. Southgrid’s “Hardware Support Post” Yves Coppens appointed.

9 Status at Oxford Currently LCG 2.3.0 on RH7.3 Parallel SL3 install, will use yaim to install 2.3.0 asap CPUs: 80 2.8 GHz –100% LCG 1.5 TB Storage – upgrade to 3TB planned –100% LCG.

10 Two racks each containing 20 Dell dual 2.8GHz Xeon’s with SCSI system disks. 1.6TB SCSI disk array in each rack. Systems are loaded with LCG2 software version 2.3.0 SCSI disks and Broadcom Gigabit Ethernet causes some problems with installation initially. The systems have been heavily used by the LHCb Data Challenge. Oxford Tier 2 centre for LHC

11 First rack in very crowed computer room (650) Second rack currently temporarily located in theoretical physics computer room. On the limit of power in 650 Air Conditioning not reliable Problems: Space, Power and Cooling. A proposal for a new purpose built computer room on Level 1 (underground) is in progress.

12 CERN Computer Room

13 Site on Level 1 for proposed computer room An ideal location –Lots of power (5000A) –Underground (no heat from the sun and very secure). –Lots of headroom (false floor/ceiling for cooling systems) –Basement (so no floor loading limit) False floor, large Air conditioning units and power for approx 50-80 racks to be provided. A rack full of 1U servers can create 12KW of heat and use 50A of power. Will offer space to other Oxford University departments

14 DWB computer room project. 26-Nov-2004

15 Centre of the Racks

16 Resource Summary CPU (3GHz equiv) –155.2 Total Storage (TB) –7 TB Total

17 LCG2 Administrator’s Course A lot of interest in a repeat, especially when the 8.5 “Hardware Support” posts are filled (suggestions welcome). PXE / kickstart install vs Quattor…?

18 Ongoing Issues Complexity of the installation. New yaim scripts have helped enormously. Difficulty sharing resources – almost all of those listed are 100% LCG due to difficult sharing issues. How will we manage clusters without LCFGng? Quattor has a learning curve. Course showed that it is very modular but PXE/kickstart + yaim preferred option at the moment. grid certificates supported browsers.