Business Placement Process (xxxxx) April, 200x. 2 D1: Charter Team Date: 8-11-xx Project Team Leader(s):Project Champion (s): Project Sponsor: Project.

Slides:



Advertisements
Similar presentations
Information Technologies Page 1 Information Technologies Page 1 Information Technologies Page 1 Information Technologies Page 1Information Technologies.
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
CLAYTON COUNTY PUBLIC SCHOOLS (CCPS) Help Completing The Facility Use Contract Facilities/Maintenance Ext. 9.
PPAP Requirements Training
Government Services How to Respond to a Request for Proposal (RFP) 2006.
Internal Audit Review For Small Projects Cyndi Fout Project Services Director October 26, 2009.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Project Plan Development
Opportunity Management System (OMS) Maryam Bakht ECE dep. University of Tehran.
Overview of DMAIC A Systematic Framework for Problem Solving
Premium Reduction & Delivery Improvement
The BIM Project Execution Planning Procedure
Managing Project Quality
What is Business Analysis Planning & Monitoring?
Instructions for Completing the S upplier V erification of P urchased P roduct Package.
Chart Your Course to Business Success On Target Business Intensive: Session 7 May 8, 2012 Advisors On Target 1.
Team Chartering Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training free six sigma site.
On Target Contractor’s Blueprint Chart Your Course to Business Success On Target Business Intensive: Session 8 November 14, 2013 Advisors On Target 1.
2014 Reliance Manufacturers Rep Meeting AGENDA: Customer Relations Overview Manufacturers Rep Expectations Overview Quarterly Review Discussion Commission.
Cost of Quality - COQ MGMT-5060 Operations Management.
0 0 Six Sigma – Financial Overview. 1 1 Roles and Responsibilities of the Finance Support Team Policy Setting – Define Savings/Benefits – Provide tools.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Instructions for Completing the P rint A ttribute R esults Form Last revised 3 January 2005.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
SacProNet An Overview of Project Management Techniques.
Deployment Strategy Six Sigma Academy.
Contract Training Class I
© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. Finance Process 22 May 2006.
Copyright © Six Sigma Academy International, LLC All Rights Reserved Executive Case Study Credit Card Declines.
5/28/2016Focus Tech Solutions1 Introduction of. 5/28/2016Focus Tech Solutions2 About Focus  Focus Tech Solutions provides inspection services to manufacturers.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Pre-Project Components
Info-Tech Research Group1 Requirements Gathering World Class Operations - Impact Workshop.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
The Value Driven Approach
© 2010 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. In most cases, the information.
Business Consulting Services Engagement Proposal & Letter of Agreement Project Management Timelines/GANNT Chart.
1 AARP Tax-Aide Prospective Volunteer Recruitment System Leadership Reports and VMIS Functionality 11/4/09.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Operations/Northeast BU – Steering Comm Presentation.
Contract Termination/ Save the Customer Accountability Black Belt-G.K. McCown Service Division BU – Dallas, TX.
1 High Volume Material Distribution System (Project ID: xxxxx ) March 14, 200x.
Steering Committee Structure
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Project Chartering & Approval Process
Roles and Responsibilities of the Finance Support Team
PMC xx/xxxx Project Title & Project Code Presenter:
Data Coordinators Conference – 2014 Laura Marroquin CASEWORKER/JCMS Specialist Everything New Data Coordinators Should Know.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Session 6: Data Flow, Data Management, and Data Quality.
Weekly Status Reporting Tracking to Build Organizational Capacity.
2015 Market Research Report on Global Water and Wastewater Treatment Chemicals Industry Published: Jan 2015 Single User License: US$ 2600 Corporate User.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
WIX Filters Fleet Sales Process 1. Wix….The Right Choice 2.
General Guidelines for this Template Add the letter of the stage (DMAIC) you are in on EACH SLIDE. Don’t feel like you have to use the tools at the end.
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template
LEAN SIX SIGMA PROJECT TEMPLATE
Benchmarking.
Practical Assessment Project Template
Product Development Scenario Overview
LEAN SIX SIGMA PROJECT TEMPLATE
DMAIC STANDARD WORK TEMPLATE
About this Template Dear Colleague, This template is provided by Valooto to help you communicate the facts about your need for a CPQ (Configure Price Quote)
DMAIC STANDARD WORK TEMPLATE
Practical Assessment Project Template – DMADV
Presentation transcript:

Business Placement Process (xxxxx) April, 200x

2 D1: Charter Team Date: 8-11-xx Project Team Leader(s):Project Champion (s): Project Sponsor: Project Title: Business Placement Decision xxxxxx Project Details: Must repair the links between Sales / Comp. Eng. / Product managers quoting placement assumptions and final placement assumptions to the Business Placement Process / guidelines Business Case addressed : Eliminate errors in placement assumptions when quoting and / orcreating business cases which lead to losses in profit Key Deliverables: (Dates) Define: 8-xx Measure: 9-xx Analyze: 10-xxImprove: 11-xxControl: 12-xx Critical Milestones: Customers/ Suppliers who must be involved: Internal to the organization “Must-Dos” in terms of Project scope: Identify gaps in the currentbusiness placement decision process that causes misquoting andbad business case assumptions Things definitely not in the project scope: xxxx andxxx Business Placement Process How the Project will be Measured: Avoidance of losses in profitdue to errors in placement assumptions Jim Altier Champion(s)Deployment Champion SponsorMaster Blackbelt GreenbeltFinance (signatures to initiate project) Champion(s)Deployment Champion SponsorMaster Blackbelt Black beltFinance (signatures to close project)

3 D2: Scope Project

4 D3: Identify Customers and Requirements To avoid errors in business placement process prior to quoting. Errors cause loss in profit & wasted resources.

5 M1: Identify Project Measure (Y) Request for part Design Competition Market Request Customer Request Start the process for the customer request Sales CSAE PSG DRE Start the process for the market request Adv. Eng. Product Manger. PSG Marketing Start the process for the design competition Sales Design Request Start Center Review Product Manger. Product Eng. Start Center Co-ord. Experts Should we go forward with quote? Product timing Volume Customers Various reasons Inform BLE (Heidenrich) No Yes Is it a clone or modify an existing part? Yes ADP (Advance Develop Process) 1 Product Manager receives Product Manger. 4 Areas highlighted in yellow were problem areas in the project

6 M1: Identify Project Measure (Y) Submit to Component Eng. Supv. Assign to Component Eng. Design Part Component Eng. Submit for Comp. Asm. Est. Component Eng. Submitted to right Process Eng. or Process Eng. Estimate Co-ord. Bad Quote or Assumption begins No Component Asm. Est. Completed Yes Process Eng. I.E. Supervisor Process Eng. Forward to Cost Estimating Process Eng. Determine piece cost Cost Estimating Cost provided to: Sales, CSAE, PSG or DRE Component Eng. Cash Flow And Piece Price generated Sales, CSAE, PSG or DRE Price Reviewed PRG Approved? No Yes Quote Price To Customer Sales Customer Accepts Price? AR Generated & Submitted Yes No Proposed Department Filled in? Determine where this is to be built Component Eng. Supv. Program Mgr. No 1 2 3

7 M1: Identify Project Measure (Y)

8 4 New Part? Send quotes to region(s) for estimates (customer specified) Tool Eng./Estimate Coordinator Estimate completed using best available rates (not blended) Tool Eng./Estimate Coordinator Yes cost cards Finance No (off the shelf part) Are they competitively costed? No Price based on market value Product Manager Yes Ties to the PRG leg of the process

9 M1: Identify Project Measure (Y) Characteristic – Accuracy Operational Definition – Assure placements are made in accordance with the guidelines. Target – 0 placement exceptions made with out involving the xxx business planner up front. Defect Definition – Business placed based upon bad assumptions which leads to loss in profit and wasted resources. Name for the Measure – Measuring if the xxx Planner was involved up-front when a placement exception was made.

10 M1: Identify Project Measure (Y)

11 M2: Data Collection Plan Surveyed the users in regards to errors in the 200x time frame.

12 A1: Capability Analysis In 200x, 200 Business Placement Decisions were made, with 13 exceptions not channeled through the business placement leader up front. Consequently, these were caught in the AR process (to late). Exceptions not reviewed by Business Placement Leader have the potential to lead to improper business placement, thus loss in profit and wasted resources. In 200x the process ran at a 65,000 defects per million level or 3.01 sigma level.

13 A2: Root Cause Analysis Errors in Placement Assumptions Business Placement Component Engineering Process Engineering Sales xxx component assumptions made by xxx (wiring side) Customer directed request Quoted wrong region, tooling only existed in wrong region. Split requests from N/A and Europe. Customer directed request for S/A. Quoting a part we were recommended to buy. xxx for part, no capability in facility. Quoted N/A and China, china used different financial template. N/A request, but we could not be competitive in N/A. Product Managers xxxxx indicated he uses market based pricing. This group follows the design competition path. Design competition is not the area of most concern. Program Managers Lack of information. Call xxxxxx if you don’t know what to do. If someone does not call xxxxxx then they make a Bad Assumption. Bad Design Request. Lack of information Guess on business guidelines. Engineering bypasses him. Not as empowered as xxxxx xxxxx. At the end of the process. Manufacturing Engineering systems not as good as molding. Design request lack detail. Lack of guidelines. Not sure where the end user is, just making assumptions. Does not know the value stream for a part, hard to make good assumptions. Lack of information Customer requested Guidelines Design requests Empowerment Root causes generated from interview process of users.

14 I1: Develop Solutions  Share point developed by the NA xxx Business Placement Manager to communicate to all parties regarding available placement locations.  Centralized the Component Assembly Estimating to one person. Previously no central contact point. Lead to numerous errors.  Documented changes needed to the DR Process (Design Request). Green Belt Team (coached by xxx xxxxxxxx) will implement necessary changes upon completion of their Green Belt Project.

15 C1: Implement Solution The above link will take you to the xxx Business Placement Share point site. To the left is an example of one of the matrix’s found on the share point site!

16 C1: Implement Solution  Request for Component Design / Tooling –Revise on-line form to better enable upfront placement decision –Help direct Component Engineering to quote proper region »Use guShare Pointn Share Point site to make determination »Provide direction to Component Engineering »Avoid redundant quoting for tools and equipment  Revision Areas  Changes to be implemented in Green Project xxxxx: Reducing Lead Time for Design Requests all categories –Shipping »“Region of Component Usage” – Drop down selection (xx, xx, xx, xxxx)  Explanation of: Region component will be used in. This will be the harness assembly plant or a Customer Location if not shipped as part of a harness assembly. –Parts and Quotes / Dates and Requirements »“Quote Region” - Drop down selection (xx, xx, xx, xxxx)  Add next to “Quote Due Date” for visibility –For DRs not NA usage region - SC will forward a copy to Business Placement to verify quote region – this is a very small % of total DRs (maybe a couple per month) –For DRs NA usage region – SC will assume NA quote region –On the DR: If usage region is NA then automatically put NA in “Quote Region” if not leave blank and SC will fill in after feedback from BP rep.

17 C2: Assess Capability 200x YTD, 65 Business Placement Decisions were made, with all exceptions channeled through the business placement leader at the appropriate time (0 defects). Exceptions not reviewed by Business Placement Leader have the potential to lead to improper business placement, thus loss in profit and wasted resources. 200x YTD the process is running at a 0 defects per million level or above a 6 sigma level.

18 C3: Close Project  DBS: xxxx xx.x-x Updated.  Start Center using Business Placement Template from Share point.  DR(Design Request) format changes will drive use of Share point templates to fill in required fields.  xxx Problem Solving form