M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Pixel/IBL status and plans A.Rozanov A.Rozanov ATLAS-France
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
Design and fabrication of electrical measurement system for microchannel plates (LAPD weekly group meeting) Feb Anil Mane, Qing Peng, Jeffrey Elam.
Module Loading Site Qualification G. Darbo - INFN / Genova SQTF, 25 / 11 / 2004 Module Loading TF - Genova Site G. Darbo - INFN / Genova November 25, 2004.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty,
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
M. Gilchriese Thermal Shock. M. Gilchriese 2 Thermal Shock - Sector 9 Use liquid nitrogen vapor to cool sector rapidly. Setup is just dewar, valve and.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
The 96 Chann FED Tester: Greg Iles2 September Channel FED Tester Status –Prototype now fully populated with AOHs. –Forced to borrow seven 2-channel.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
Summary of TS2 activities on CO2 vacuum insulated lines on YB0
Task 5: High-Tc superconducting link Summary of work-package
Module Loading Task Force Meeting October 21, 2004
Teleconference ACS – FREIA 17th October 2017
Summary of Fuse Testing for Barrel Module Fuse Boxes
Radiation Laboratory Meeting
Hybrid & Module Electrical Testing
US Module Testing Progress Report
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004

M. Gilchriese 2 Sector Summary 9005 – FE-I2 modules –Used for qualification and extensively tested (system test) 9000 – FE-I3 bad modules –Used for final tune-up of assembly process –Assembly completed. Survey completed - OK –Preliminary( room T) electrical test done - OK –Thermal imaging, thermal cycling and burn-in to be done –Back in system test for now 9006 – 1 st production unit –Assembly and survey completed on September 24. OK. Thermal OK. –Room temperature test of modules completed. OK –Remaining testing started 9007 –Assembly and survey completed September 30. OK. Thermal OK. Electrical OK –Cable repaired(flaw in test box broke wire). –Testing completed. OK 9008 –Three modules loaded as of Nov. 17. Loading of others in progress –Assembly and survey completed on October 19. OK –Not yet tested.

M. Gilchriese 3 Status Test system operational now but have had problems with stability of “digital” test. This was solved by changing the electrical connection of the circulating pump(grounding problem?). Why this was a problem is not yet understood but we are investigating. We have resumed mounting modules on In the last few weeks, we have nearly qualified the second module-mounting apparatus. This will be ready to go next week. We will then have a peak capacity to mount modules per week.

M. Gilchriese 4 Planning