Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)

Slides:



Advertisements
Similar presentations
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Advertisements

Area is the amount of surface space that a flat object has. Area is reported in the amount of square units.
Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
 Air! A pneumatic assembly is one that converts energy stored in compressed air to mechanical energy. Electrical Energy Compressed air Mechanical force.
SoLID EC Design for IHEP 2012/10. Basic Features of Preliminary Design Based on COMPASS Shashlyk module design. 0.5mm lead/0.12mm air gap/1.5mm scintillator/0.12mm.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
C. Lu, RPC System Installation Workshop, 6/11/2009, CUHK 1 1 RPC gas system installation (step by step plan) (CUHK, 6/11/2009) Changguo Lu, Kirk McDonald.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing RPC Assembly Changguo Lu, Kirk McDonald, Bill Sands Princeton University (July 28, 2007)
Hosted by Kay McInnis AreaPerimeter Circumference Vocabulary
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
1 December 17, 2007 Visit Bakelite manufacture – Li Shen Wood Product Inc. Jiawen Zhang, IHEP Changguo Lu, Princeton University.
New Hexagonal Design for MINERvA A. Bodek- Sept Now even counters have a 1.2 solid steel picture frame Around the 3 m wide active target. The.
CONSTRUCTING A FIVE CABIN LATRINE
Contributed by: Integrated Teaching and Learning Program, College of Engineering, University of Colorado at Boulder.
Openergo A self-build rowing machine
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Glove Box 31Aug05.
Area is the amount of surface space that a flat object has. Area is reported in the amount of square units.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Garment Dust Covers For Textile Storage. Supplies You will need: Pre-washed cotton sheeting Cotton thread Cotton twill Sewing machine or needle.
Area of Circles. Warm Up Cut out your circle.
1 Aging Study for SiD Hcal and Muon System RPCs (University Linear Collider Detector R&D, project 6.19) Changgo Lu, W. Sands, K. T. McDonald, A.J.S. Smith.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Water Tank as the Outer Muon Veto Mingjun Chen
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
PHENO 2010 Christopher White, IIT 1 The Daya Bay Reactor Antineutrino Experiment Christopher White 1.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
C. Lu, K.T. McDonald RPC Connections October 27, RPC Module Signal and HV Connections (October 27, 2008) Changguo Lu, Kirk T. McDonald Princeton.
Introduction bin/Dev_DocDB/DisplayMeeting?conferenceid=54http://juno.ihep.ac.cn/cgi- bin/Dev_DocDB/DisplayMeeting?conferenceid=54.
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
Installing a VOR Antenna on Zenith’s “Flying Rudder” by Bill Bartlett Cutout hole using the antenna gasket as a template. Dill two holes to accommodate.
15.75 in quick check of fields in a test structure – design will be improved A Ross Engineering Toroid water jetted plate ground plane shaped button cable.
Operating procedure for POF cables Comoss Electronic Co., Ltd. Date : May-05, 2008.
1 Muon Veto System and Expected Backgrounds at Dayabay Hongshan (Kevin) Zhang, BNL DayaBay Collaboration DNP08, Oakland.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
1 Work report ( ) Haoqi Lu IHEP Neutrino group
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Correspondence with HuntVac. Jan 13 Sven, Thanks for the call. Just to recap (and so I don’t lose my notes): · Redesign AL box vessels. · QTY.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Correspondence with HuntVac
Scintillating Fiber BLM with PMTs
How to make the basic car
Canta Open Canal Manufacturing Procedure
Service channels between Tracker and PP1
Basswood Lengths and Quantities 12” (305 mm) Bottom Horizontals
SiD Solenoid Status and Plans
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Surface area in lungs.
Break down Lance rack Cut one of each of these for each rack
Analyze What do you see here? How has the M.C. Escher artist used:
ACD transparency - gaps between tiles - holes in tile to attach them
Job Performance Requirement 20-5
1.5 Measurement AS
Perimeter- is the distance around a figure.
Presentation transcript:

Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)

Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Cable Routes in the Daya Bay Near Hall Control room Cable tray around perimeter of water pool Cable trench between pool and control room

Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Issues If all PMT cables are the same length, where is the excess length stored? Inside the control room, under the false floor? On floor outside water pool, under the RPC system? How do the cables pass through the Tedlar(?) cover of the water pool? Cut hole in the cover, pass cables through, Scotch tape the gap. Build feedthrough boxes with feedthroughs in air above the cover. MiniBooNE-style feedthroughs, recently tested with RG303 cable to 25 PSI differential at Princeton. “Clam shell” variant possible as don’t need water seal. This would permit assembly of feedthroughs for cables with connectors.

Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Cable Routing and the Pool Cover Pool cover rolled up along this edge when retracted Cable feedthroughs along this edge only Pool cover must fit in this gap when rolled up. Example: If spool diameter is 5 cm and outer diameter of roll is 15 cm, then an 18-m-long cover must have thickness less than 0.9 mm. Cables must pass over the top of the dam and under the H-beam of the RPC support. Should build notches in the dam for the cables, and protect them with a cover plate. Pool cover runs on tracks along edges of pool