THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Analog Electronics Workshop (AEW) Apr 3, Contents Intro to Tools Input Offset Input and Output Limits Bandwidth Slew Rate Noise EMIRR Filtering.
Analog Basics Workshop RFI/EMI Rejection
Data Acquisition Risanuri Hidayat.
Novocontrol Alpha Analyzers Fundamentals
STARLight PDR 3 Oct ‘01I.1 Miller STARLight Control Module Design Ryan Miller STARLight Electrical Engineer (734)
Arduino Week 3 Lab ECE 1020 Prof. Ahmadi. Objective Data acquisition (DAQ) is the process of measuring an electrical or physical phenomenon such as voltage,
Critical Design Review Team Iron Chefs Ahmad Alawadhi Eric Willuweit Kegan Grimes Kyle Chessman Sean Flodberg 1 Eric.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Analogue Electronics II EMT 212/4
CCD and CCD readout : Engineering diagnostics during development, commissioning and operation Pierre Antilogus C. Juramy, H.Lebbolo, S. Russo, V.Tocut.
DATA ACQUISITION Today’s Topics Define DAQ and DAQ systems Signals (digital and analogue types) Transducers Signal Conditioning - Importance of grounding.
ISUAL Sprite Imager Electronic Design Stewart Harris.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
Mircea Bogdan, NSS2005 Oct , 2005 – Windham El Conquistador Resort, Puerto Rico1 Simultaneous Sampling ADC Data Acquisition System for the QUIET.
1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATI PRR CERN 4 March the Embedded Local Monitor Board ELMB Design description of the Embedded Local Monitor.
Alexei SemenovGeneric Digitizer Generic Digitizer 10MHZ 16 bit 6U VME Board.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Instrument PER 1/21/ EFW Instrument Calibration John W. Bonnell Space.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
Team Theremin1 Analog Theremin Using Vacuum Tubes and Frequency Detection via Band-pass Filters Ryan Adams, Matt Britt, Yuri Yelizarov, William Findley.
FIELDS iPDR – RFS Analog Dennis N. Seitz 1 Solar Probe Plus FIELDS Instrument PDR Radio Frequency Spectrometer Analog Dennis N. Seitz UC Berkeley SSL
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Engineering Peer Review Overview Dr. John W. Bonnell and the.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL
Arduino Week 3 Lab ECE 1020 Prof. Ahmadi. Objective Data acquisition (DAQ) is the process of measuring an electrical or physical phenomenon such as voltage,
Boom Electronics Board (BEB) Engineering Peer Review Oct
Solar Probe Plus – FIELDS Main Electronics Package
Setup for automated measurements (parametrization) of ASD2 chip
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Calorimeter Mu2e Development electronics Front-end Review
Analogue Electronics Circuit II EKT 214/4
SCADA for Remote Industrial Plant
Electric Field and Waves Instrument (EFW)
Instrument Data Processing Unit (IDPU)
Boom Electronics Board (BEB) EFW-EMFISIS E-Field I/F (EFW-EMF)
Boom Electronics Board (BEB)
Preliminary Design Review
Development electronics SIPM-MU2e
Low Voltage Power Supply & Power Controller Board
Lesson 11: Transducer Electrical Interfaces
Digital Sub-System Dorothy Gordon.
Universiti Malaysia Perlis
Presentation transcript:

THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard

THEMIS Instrument CDR 2 UCB, April 19-20, 2004 BEB Requirements Functional Requirements Spin Plane Booms, for each provide: –Floating Ground Driver –“Bias”, “Guard”, “Usher” programmable potentials –“Braid” programmable, switchable potential –AC test signal source Axial Booms, for each provide: –Floating Ground Driver –“Bias”, “Guard”, “Usher” programmable potentials –AC test signal source

THEMIS Instrument CDR 3 UCB, April 19-20, 2004 BEB Requirements, con’t.

THEMIS Instrument CDR 4 UCB, April 19-20, 2004 BEB Analog Electronics

THEMIS Instrument CDR 5 UCB, April 19-20, 2004 BEB Block Diagram

THEMIS Instrument CDR 6 UCB, April 19-20, 2004 Braid Bias

THEMIS Instrument CDR 7 UCB, April 19-20, 2004 Preliminary PCB Layout

THEMIS Instrument CDR 8 UCB, April 19-20, 2004 BEB ETU

THEMIS Instrument CDR 9 UCB, April 19-20, 2004 BEB ETU

THEMIS Instrument CDR 10 UCB, April 19-20, 2004 BEB Parts Analysis Parts Stress Analysis Design meets derating guidelines of GSFC PPL-21 Worst Case Temperature Analysis Parts meet Temperature Guidelines –Operating Temperature range: –30C to 45C –Survival Temperature range: –50C to 65C Only one “high” power device (Actel 54SX72) –Operating power dissipation: 63 mW

THEMIS Instrument CDR 11 UCB, April 19-20, 2004 BEB ETU Mass and Power Power Estimated worst case power at PDR: 1667mW –Includes Preamp power of 324mW Measured ETU operating power: 790mW –Including Preamp, total = 1114mW Mass Estimated mass at PDR: 504g Measured ETU mass: 426g

THEMIS Instrument CDR 12 UCB, April 19-20, 2004 BEB ETU Test Results DC Response of Floating Ground Driver, FL_GND2

THEMIS Instrument CDR 13 UCB, April 19-20, 2004 BEB ETU Test Results, con’t. AC Response of Floating Ground Driver, FL_GND2

THEMIS Instrument CDR 14 UCB, April 19-20, 2004 BEB ETU Test Results, con’t. DC Response of Bias Driver, BIAS1

THEMIS Instrument CDR 15 UCB, April 19-20, 2004 BEB ETU Test Results, con’t. AC Response of Bias Driver, BIAS1

THEMIS Instrument CDR 16 UCB, April 19-20, 2004 BEB ETU Test Results, con’t. Preliminary Crosstalk Data Set-up: –Signal Injected into Ref. Voltage of BIAS3 –VSphere3 = 10V PP, 150Hz –Output of neighboring BIAS Driver examined Crosstalk observed on BIAS2: –VSphere2 not terminated –Signal Amplitude is -75.8dB (relative to 7.07V RMS ) –VSphere2 grounded –Crosstalk undetectable (< -103dB)

THEMIS Instrument CDR 17 UCB, April 19-20, 2004 BEB / EFI Subsystem Test Integrated Testing Includes: –BEB, Boom wire, Preamp –Sensor Boxes with Plasma Simulator (R║C) –GSE Automated Data Acquisition Test Results –DC Tests –Isolation, Sensor biasing, Usher/Guard Biasing, Braid biasing –DC Gain/Offset –AC Tests –AC input impedance, Transfer function, Crosstalk, Noise level –Linearity, Slew rate

THEMIS Instrument CDR 18 UCB, April 19-20, 2004 EFI Test/Characterization

THEMIS Instrument CDR 19 UCB, April 19-20, 2004 BEB GSE Data Acquisition

THEMIS Instrument CDR 20 UCB, April 19-20, 2004 BEB GSE Data Acquisition Capabilities: Supports Automated test of Flight Hardware “VME-style” backplane –Accepts BEB and DFB –DCB-simulator implements CDI command 16-Channel 16-bit ADC (±100V range) –6 Vsphere, 2 Braid, 2 Usher, 2 Guard, 2 Flt. Gnd Programmable Signal Source w/ –±60Vdc offset range –30mV to 15Vpp AC (DC-16kHz) –1mV to 500mVpp AC (100k – 500kHz) LVPS and PCB simulation –Power services programmable on/off –+5VD, +2.5VD, ±10VA, ±100VA –Current monitors

THEMIS Instrument CDR 21 UCB, April 19-20, 2004 BEB GSE Software Capabilities: Scripted or interactive entry of CDI, GPIB, and DAQ commands Continuous analog acquisition mode with real-time stripchart displays “One-shot” acquisition mode for detailed examination, processing, and archival of analog input data MATLAB interface –TCP/IP interface allows GSE to be controlled via remote host –Full access to CDI, GPIB, analog and digital I/O commands –Interface libraries allow GSE functions to be accessed just like native MATLAB commands Device control –GPIB programmable function generator serves as signal source –DAQPad 16-input, 16-bit, 333 kSamp/sec for analog data acquisition –DAQPad analog and digital outputs serve as controls for signal source amplifier, LVPS switching, and current monitor MUX –TCP/IP interface to 6U VME GSE Interface Board for sending CDI commands

THEMIS Instrument CDR 22 UCB, April 19-20, 2004 BEB GSE Software, con’t.

THEMIS Instrument CDR 23 UCB, April 19-20, 2004 BEB Design Status Completed ETU Design and Fabrication Characterization w.r.t. DC gain and AC response –In progress Available for testing with Preamp prototypes EFI Sensor Test Program GSE Data Acquisition system completed Integrated tests with preamps and boom units Issues Actel 54SX72 failures, total of 4 out of 7 –2 failed programming –2 failed “in circuit”, cause unknown

THEMIS Instrument CDR 24 UCB, April 19-20, 2004 BEB Add’l Info Additional slides included: Floating ground driver schematic Bias driver schematic

THEMIS Instrument CDR 25 UCB, April 19-20, 2004 Floating Ground Driver Heritage Design CLUSTER, POLAR, FAST Minor changes in part selection

THEMIS Instrument CDR 26 UCB, April 19-20, 2004 Bias Driver Heritage Design CLUSTER, POLAR, FAST Minor changes in parts selection and DAC