ATEC BRAC Update 12 May 11 81 Days Remain To BRAC End-Date 15 Sep 126 Days Remain To ATEC Ready Date 1 Aug (T) Provide our employees with BRAC execution.

Slides:



Advertisements
Similar presentations
2007 CAH HF Program Group 2 Roadmap Next Steps for Phase II January – March 2007 JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC Engage Internal Stakeholders Plan/Educate.
Advertisements

1 ECM/EDMS Project HSD, TRD, SRCA September 26, 2007.
Wave 3 Scope and High Level Timeline Plan Version 1_JH 22nd June 2012
Zayo IPO. 2 | Proprietary and Confidential 2 Overview  Established team  Identified overall timeline – continue to track to overall timeline  Built.
VOLUNTEER PROCESS Employee Information (Losing Site)
April 19, 20003GPP2 report 3GPP2 Steering Committee TSG-A report DRAFT Seoul, Korea April 19, 2000.
1 Solar Update July 11, 2013 Michael E. Finn, CFO.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
Labor Relations Conference Breakout Session A Voluntary Early Retirement (VER) Tampa FL July 2003.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
University of Toronto Mississauga Campus Capital Projects University of Toronto Mississauga Campus: Capital Projects Erindale College Council | March 9,
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
As of Oct 08 UNCLASSIFIED G-1 FORSCOM 1 “Team Transition One Team, One Future” Headquarters FORSCOM/USARC Base Realignment and Closure Relocation.
MyFloridaMarketPlace MyFloridaMarketPlace User Meeting July 13, 2005.
. Early Presence FY ToF Directed/ Mil PCS FY11 3 Personnel Authorizations (FY07 “Baseline” ) MilCivCtrTotal HQ ATEC / AEC (-) / JT&E
April 2011 Mississippi Department of Education Office of Instructional Enhancement and Internal Operations/Office of Special Education 1 SPECIAL EDUCATION.
Agency STARS Rapport Association May 8, 2008 Sunflower Project Statewide Financial Management System Pre-Implementation Activities.
24+ ADVANCED LEARNING LOAN LAURA MARSHALL FE LOANS PRODUCT CONSULTANT 5 th July 2013.
Northstar Commuter Rail Project Update Mark Fuhrmann, Project Director Rich Rovang, Deputy Project Director, Design and Construction Chris Weyer, Assistant.
UNCLASSIFIED Joint Program Executive Office for Chemical and Biological Defense 1 CSSC Consortium CSSC Consortium March 10, 2011.
HEARTLAND COMMUNITY COLLEGE COLLEGE DEVELOPMENT PLAN PHASE II PROJECT SCHEDULE August 26, 2009.
Missoula County Space Needs Plan Planning Logistics Phasing Plan Schematic Designs Questions.
NCOA Link Program Status – August 2004 NCOA Link ™
Madison Avenue Reconstruction Department of Planning and Development.
Air Force Personnel Center Air Force Wounded Warrior (AFW2) Employment Program AFPC/DPIFRB Amy Ruiz.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
April 29, 2004 Project Status Meeting Liang Y. Hsia, P.E. ITS Engineer Administrator Florida Department of Transportation.
MARS Taskforce COPS Update February 8, Initial Settlement As of January 31, 2011 Operating Date: January 24, 2011 AMC ESI ID Totals: 2,285,116 AMDG.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
Turtle Creek Apartment Project Update Able Construction September 15, 1999.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | dcps.dc.gov Ron Brown Modernization.
Baseline The baseline at July Previously there was a lack of consistency for: Pathways into specialist clinics; Policies, procedures and guidelines.
Bond Oversight Committee
SPF MAG Quarterly Report – Feb 2015
Olathe South ACT Timeline
Primary Longman Elect 3A Chapter 5 Asking about dates.
Banner Project Update for Division Deans
Timeline agreed at planning meeting held on 30th November 2015
Colorado Plugfest Planning
All Wales Safeguarding Procedures Review Project
Mission Hall Updates Ask & Learn Christine Shaff UCSF Real Estate
The SAT will be given at ECHS on the dates below!
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Overall Project RAG Status
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Plan for AIP-3 Test and Demonstration
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
Overall Project RAG Status
Ctclink executive leadership committee May 31, 2018
Births as per Civil Registration System,
XRN Nov 19 Release - Status Update
LCLS-II Cryoplant Controls Workshop.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
XRN Nov 19 Release - Status Update
POC: ASAP Prevention Branch Chief (706)
IT Managed Services Transition Weekly Activity Report: June 11th, 2019
XRN Nov 19 Release - Status Update
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
XRN 4954 – MiR Drop 5 - Status Update
Army Team C4ISR BRAC Update
ATEC BRAC Update 154 Days Remain To 109 Days Remain To Cleon Raynor
Ft. Benning Office Hours
TEL031 ODL Analytics Main Activities
XRN Nov 19 Release - Status Update
MVD System Modernization Certification Change Request
Presentation transcript:

ATEC BRAC Update 12 May Days Remain To BRAC End-Date 15 Sep 126 Days Remain To ATEC Ready Date 1 Aug (T) Provide our employees with BRAC execution & planning update (P) To keep all informed of ongoing actions so that we remain synchronized with minimal impact to mission.

ATEC BRAC Status 287 Civilian Positions/221 ToF Letters 136 Completed ToFs 31 pending moves –May: 2 –June: 5 –July: 7 –August: 13 –September: 4 5 personnel w/overseas rights 68 Departures –15 PPP placements –44 accepted another position –9 retired 47 Declinations –29 registered –1 pending registration –1 pending resignation –16 pending retirements 2 2

HQ ATEC & AEC BRAC Results 3 3 Changes from Last Week Farley Jones departed; PPP position Report date for Linda Terres extended to 1 Sep 11 TotalHQAEC Accept3616%2419%1213% Decline4721%3225%1516% NCR Civ8337%5643%2729% Accepted Another Job4320%2116%2325% PPP Placed157%119%44% Retired94%22%78% Departures6731%3426%3437% ToF Completed7132%3930%3234% Total221100%129100%93100%

New HQs Build Update  Glass Atrium Installed  Interior Atrium Stairs & Crosswalk Installed  1 st & 2nd Floor Dry-Wall Complete  Staircase Installed  All Dry Wall / Paint Complete  Freight Elevator Complete  Furniture /Flooring Installation Current Construction Status Working Change in Beneficial Occupancy Date ACSIM Tracking – 19 Day Slip Furniture Contract Awarded-install 4 May-29 June Case – Goods on schedule ACSIM Tracking – Ready Date Implications IT-Security Synchronization Contracts (e.g. IT Vendor, ADT) As of 7 Mar 11 ATEC Ready Date: 1 Aug 11

Summary ATEC HQs Bldg 93% complete, TRD is 1 August 11 Furniture being installed ( 4 May -29 June 11) As of 4 April majority of ATEC - Alexandria Workforce at APG: 30 personnel remain in Alexandria Two-Phase Move : Phase 1: Oct 10 through 4 April 11(Move to APG) Phase 2: 5 April through 15 Sep 11 (Move to Hqs Bldg) Weekly Planning/Coordination/Execution Meetings NCR OPS Cell - close out IMP/PCIV; APG Team - APG 5 5