THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:

Slides:



Advertisements
Similar presentations
RF Circuit Design Chris Fuller /7/2012.
Advertisements

SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
THEMIS MISSION PDRESA- 1 UCB, November, 2003 ESA Plasma Instrument Mission PDR Dr. C. W. Carlson and Themis ESA Team UC Berkeley SSL.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
ESA EJSM/JGO Radio & Plasma Wave Instrument (RPWI) Warsaw meeting Lennart Åhlén.
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 1 UCB, May 2, 2005 Search Coil Magnetometer Alain Roux, CETP.
THEMIS Mission CDR -UCB, June 14-18, 2004 Search Coil Magnetometer (SCM) MCDR Alain Roux, CETP-Velizy Co-i: O.Le Contel Technical Manager: B.de la Porte*
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS MISSION PDRMAG BOOM- 1 UCB, November, 2003 Magnetometer Booms (MAGS) Mission Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
SWGTemplate- 1 UCB, Nov 15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Search Coil Magnetometer (SCM) team Co-i: A. Roux, O. Le Contel Technical Manager(*):
Dec 1, FIELDS Top Level Requirements Review S. Harris (UCB)
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
THEMIS peer PDR Summaries 1 October, 2003 MPDR RFA#4 TITLE: Provide Design Information from the Instrument Peer Reviews REQUESTED BY: Joseph Bolek, Mark.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
THEMIS SRR Mission Requirements - 1 UCB July MISSION REQUIREMENTS Ellen R. Taylor Mission Systems Engineer Space Science Laboratory University.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
Solar Probe Plus FIELDS Instrument PDR Management Peter Harvey, PM Lindsey Hayes, DPM University of California
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Design Fluxgate Magnetometer (FGM) Werner Magnes Institut fuer Weltraumforschung (IWF) Austrian.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
FIELDS MEP Thermal Vacuum Cycling iPER
SPF MAG Quarterly Report – Feb 2015
Spacecraft Interface and I&T
CINEMA System Engineering
Solar Probe Plus – FIELDS Main Electronics Package
Search Coil Magnetometer (SCM) CDR/Peer review CETP-Velizy
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS Mission Assurance
SP+ DFB REE 12/01/12.
Science Requirements The FGM shall measure DC and low frequency perturbations of the magnetic field  see performance requirements The FGM shall measure.
Boom Electronics Board (BEB)
Summary FM design overview (As built) Documentation FM performances.
Low Voltage Power Supply & Power Controller Board
University of California, Berkeley
Peer Review Agenda (Suggested).
GLAST Large Area Telescope
The Magnetic Loop Antenna (MLA)
Presentation transcript:

THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager: B.de la Porte Engineer: A.Bouabdellah & C.Coillot Technicians: D.Alison & S.Ruocco

THEMIS Mission PDR/CAR 2 UCB, November 12-14, 2003 Overview SCM Requirements & Specifications Block Diagrams Electrical Mechanical and Thermal Mass and Power Development Plans Peer Review Results

THEMIS Mission PDR/CAR 3 UCB, November 12-14, 2003 REQUIREMENTSCM DESIGN IN-1. The Instrument Payload shall be designed for at least a two-year lifetime Compliance. IN-2. The Instrument Payload shall be designed for a total dose environment of 33 krad/year (66 krad for 2 year mission, 5mm of Al, RDM 2) Compliance. IN-3. The Instrument Payload shall be Single Event Effect (SEE) tolerant and immune to destructive latch-up Compliance. IN-7. No component of the Instrument Payload shall exceed the allocated mass budget in THM-SYS-008 THEMIS System Mass Budget.xls Compliance. SCM Sensor: 600g Allocated. Pre-amp: 220g Allocated. (Harness and DFB Board tracked with IDPU) IN-9. No component of the Instrument Payload shall exceed the power allocated in THM-SYS-009 THEMIS System Power Budget.xls Compliance. Pre-Amp: 90mW Allocated. IN-13. The Instrument Payload shall survive the temperature ranges provided in the ICDs Compliance. IN-14. The Instrument Payload shall perform as designed within the temperature ranges provided in the ICDs Compliance. Mission Requirements

THEMIS Mission PDR/CAR 4 UCB, November 12-14, 2003 REQUIREMENTFGM DESIGN IN-16 The Instrument Payload shall comply with the Magnetics Cleanliness standard described in the THEMIS Magnetics Control Plan Compliance. THM-SYS-002 Magnetics Control Plan. IN-17 The Instrument Payload shall comply with the THEMIS Electrostatic Cleanliness Plan Compliance. THM-SYS-003 Electrostatic Cleanliness Plan IN-18 The Instrument Payload shall comply with the THEMIS Contamination Control Plan Compliance. THM-SYS-004 Contamination Control Plan IN-19. All Instruments shall comply with all electrical specifications Compliance. THM-IDPU-001 Backplane Specification IN-20. The Instrument Payload shall be compatible per IDPU-Instrument ICDs Compliance. THM-SYS-107 SCM Interface Control Document (Internal # THM-SCM-SYS-ICD-0.1). Verification Matrices to be completed. IN-21. The Instrument Payload shall be compatible per the IDPU-Probe Bus ICD Compliance. THM-SYS-112 Probe-to-SCM Mag Boom ICD. Verification Matrices to be completed. IN-23 The Instrument Payload shall verify performance requirements are met per the THEMIS Verification Plan and Environmental Test Spec. Compliance. THM-SYS-005 Verification Plan and Environmental Test Specification preliminary draft. Verification matrix to be completed. IN-24 The Instrument Payload shall survive and function prior, during and after exposure to the environments described in the THEMIS Verification Plan and Environmental Test Specification Compliance. THM-SYS-005 Verification Plan and Environmental Test Specification preliminary draft. Verification matrix to be completed. Mission Requirements

THEMIS Mission PDR/CAR 5 UCB, November 12-14, 2003 REQUIREMENTSCM DESIGN IN.SCM-1. SCM shall provide a critical test for the role of waves at substorm onset, in various models (together with EFI). Compliance. IN.SCM-2. SCM shall measure the 3D AC B-field from 1 Hz to 4kHz Compliance. IN.SCM-3. The SCM sensitivity shall be better than and 0.1 kHz. Compliance. IN.SCM-4. The SCM DFT spectral range shall be in the range 16Hz to 4 kHz, transmitted as 32 steps with df/f ~ 25%. Compliance. IN.SCM-5. The transfer function of the SCM sensors (amplitude &phase) shall be known with an accuracy better than 5%. Compliance. IN.SCM-6. On each spacecraft the 3 magnetic antennas, shall be held orthogonal by a structure procured by CETP. Compliance. Sensor Requirements

THEMIS Mission PDR/CAR 6 UCB, November 12-14, 2003 REQUIREMENTSCM DESIGN IN.BOOM-1. Mag Boom deployment shall be repeatable to 1 degree Compliance. IN.BOOM-2. Mag Boom stability shall be better than 0.1 degree (includes bus and boom components) Compliance. IN.BOOM-3. Mag Boom deployed stiffness shall be greater than 0.75Hz Compliance. IN.BOOM-4. Mag Boom shall be designed to be deployed between 2 and 15 RPM about the Probe's positive Z axis. Compliance. IN.BOOM-9. The SCM boom shall be approximately 1 meters long. Compliance. IN.BOOM-12. All deployed booms shall include TBD inhibits to prevent inadvertent release. Compliance. SCM Boom Requirements

THEMIS Mission PDR/CAR 7 UCB, November 12-14, 2003 Block diagram Christophe Coillot Preamplifier Box unit Main functions: -Calibration -Regulated power supply -Low noise preamplifier, 3 channels -Same design as Cluster

THEMIS Mission PDR/CAR 8 UCB, November 12-14, 2003 Mechanical & Electrical Design V out Calibration Signal V in Feedback Amplified SignalInput Signal antenna Preamplifier Principle : 1 st level of amplification 46 dB Gain few noise Feedback 2 nd level of amplification 31 dB Gain Bandwidth 0.25mHz to 4 KHz Input from calibration network 1 layer in the Amplifier module 1 layer in the Regulator module

THEMIS Mission PDR/CAR 9 UCB, November 12-14, 2003 Electrical design Christophe Coillot Preamplifier design Prototype exists -Fits requirements (sensitivity, power). -Measurement conditions close to Flight model : -Same design for sensor -Same kind/length for cable -Same design as 3D+ PA -Powered by 3D+ voltage regulator

THEMIS Mission PDR/CAR 10 UCB, November 12-14, 2003 Mechanical & Electrical Design  3 radiation shielding levels  BBM exists; no risk  3D+ has large experience; generic evaluation CNES/ESA/NASA 2002, qualification CNES/ESA 2003 Heating network * Radiation Shielding (Tantalium plates) 1 st amplification level 2 nd amplification level * Circuit not included for the THEMIS mission

THEMIS Mission PDR/CAR 11 UCB, November 12-14, 2003 Mass & Power Preliminary design meets all system requirements ItemSpecification/ allocation Status Sensor bandwith Sensitivity 0.3 Hz to 4 kHz 1 Hz Achieved (below) Antenna size Antenna mass 175x175x175mm 600 gr. 175x175x175mm 570gr (+/-7%) Pre-amp. Mass Pre-amp Power 220 gr. 90 mW 200gr (+/- 15%) 75 mW (with BBM)

THEMIS Mission PDR/CAR 12 UCB, November 12-14, 2003 Electrical SCM sensitivity curve (BBM; measured in the lab)

THEMIS Mission PDR/CAR 13 UCB, November 12-14, 2003 Electrical Instrumentation Interfaces with DFB defined and documented (see DFB presentation) Proposed design will meet functional requirements Detailed design proceeding Risks have been identified (tight schedule); under control; close interaction with UCB. Sufficient maturity in design (existing BBM) to proceed to detailed design Thermal design: a MLI is requested around SCM antennas (UCB responsibility) Cluster heritage illustrates reliability of the design Ground Support Equipment SCM antennas+PA tested at Chambon la Foret Magnetic axis knowledge +/- 0.2° Short tests at S/C level with antennas in mu-metal boxes

THEMIS Mission PDR/CAR 14 UCB, November 12-14, 2003 mechanical

THEMIS Mission PDR/CAR 15 UCB, November 12-14, 2003 Mechanical & Thermal Mechanical Structure Design proposed by GDTech has been iterated. It is now agreed upon by CETP&UCB. Numerical analyses will start to check for vibration load…Preliminary analyses shows that mass is below specs. Design modified in agreement with suggestions made by review committee: differential dilatation between Ketron Peek&aluminium. Design modified to allow the passage of the cable inside boom, as requested by UCB. Thermal A thermal blanket is needed during eclipses. This is provided by UCB.

THEMIS Mission PDR/CAR 16 UCB, November 12-14, 2003 Mechanical

THEMIS Mission PDR/CAR 17 UCB, November 12-14, 2003 Mechanical

THEMIS Mission PDR/CAR 18 UCB, November 12-14, 2003 Development Plans Breadboarding/Eng Modeling BBM of antennas and PA exist and meet specs Part list for PA is frozen; fabrication of EM is starting Tests EM beginning of january PA Flight Units  FM1+2+3: sept 24  FM4+5+FS: nov. 19 Schedule is tight for FM1/PA delivery No problem expected for antennas and structures

THEMIS Mission PDR/CAR 19 UCB, November 12-14, 2003 Peer Review Results Status of RFAs RFA1: -AC magnetic cleanliness Status - Main issue is solar cells rotation (non circular S/C). Magnetic modeling will be made to estimate spurious noise at SCM location, once the info on solar cell wiring is available. UCLA is conducting a mag-cleanliness program; they have the software to carry out this evaluation -CETP can help by providing a “sniffer”, to measure spurious noise from s/c, and from other instruments. Involves some extra cost.

THEMIS Mission PDR/CAR 20 UCB, November 12-14, 2003 Peer Review Results RFA2: -Schedule problem with FM1/PA -Part list to be agreed with UCB Status: -delivery of FM1 together with FM2&3 on september 24 th ; agreed with UCB. -Final part list sent to UCB nov 10 th. RFA3: -Alignment budget Status : -Magnetic axis determined within 0.2% during tests at Chambon, once the antenna are mounted on their structure. -Main difficulty is stability/knowledge of boom axis.