ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,

Slides:



Advertisements
Similar presentations
Left to Right: Michael Kelton, Ethan Hall, Greg Wegman, Vashisht Lakhmani.
Advertisements

ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
ECE 477 Design Review Team 13  Spring 2006 Elmer Chao (not pictured), Matt Cozza (not pictured), Joe Waugh (not pictured), Evan Zelkowitz (not pictured)
Jason CrayJoseph Mundackal Michael WarscoRyan Sherlock.
ECE 477 Design Review Team 01  Fall 2012 Brennan Tran Jonah Ea Ben Pluckebaum Kevin Meyer.
ECE 477 Design Review Team 8 − Spring Names: Fabian W, Siddharth B, Vineeth H, Sriram R.
Design Review: RoboSiM Robotic Surveillance in Motion
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
IDine A Camera based Multi-touch Dining table Tejas D Kulkarni Abhisheyk Gaur Himanshu Raghav Ankur Mishra.
2 Lines Electronics I 2 C Analyzer Ching-Yen Beh Robert S. Stookey Advisor: Dr. J. W. Bruce.
ECE 477 Design Review Group 9  Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Design Review – Spring 2010 Team 15. Team Members.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
ECE 477 Design Review Team 1  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger Formal Design Review.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 2  Spring 2010 Digi-Brush Josh LongCaleb Ayew-ewKatie Schremser.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
Solar Telematics System ECE 477 Design Review, Team 8, Spring 2012 Paste a photo of team members here, annotated with names of team members. Craig Lechlitner,
ECE 477 Design Review Team 5  Fall 2007 Wes Chris Josh Dave.
 Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design  Schematic and theory of operation.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
Shiv Yukeun Donghan Robert.  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Design Review Team 01  Fall 2010 Jigar Gandhi Chandler Wall John-Taylor Smith Eric Zarowny.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
Tone Matrix Music Box Jun Jun PehWan Qi Choo Kian Hui Wong Chia Siong Goh.
ECE 477 Design Review Team 7  Spring 2007 Joe Land Ben Fogle James O’Carroll Elizabeth Strehlow.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
ECE 477 Design Review Team 1  Fall 2006 Sumanth Peddamatham Alex Tucker Chris Arges Radhika Mulani.
ECE 477 Design Review Team 14  Spring 2006 Jason, Nathanael, David, David.
ECE 477 D ESIGN R EVIEW T EAM 5 MY ATM F ALL 2012 Tung Lun Loo Yu Chen Lim Chuan Yean Tan Xue Yuan Wong.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
Alumoline Fuel-Cell Instrumentation Nissan GT-R Naman Chopra Suan-Aik Yeo Ronny Wijaya Darin Tanaka.
ECE 477 Design Review Team 3  Fall 2007 Steven Kingsley (Analog) Roy Scheck (Leader) Tony Liechty (Digital) Charles Lan (Software)
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW FEST – FALL OUTLINE  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 1  Spring 2008 Alan BernsteinIan AlsmanIlya VeygmanDarshan Shah.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Design Review Team 5  Spring 2010 Fred Grandlienard Andrew Gregor Kevin Mohr Ryan DeFord.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Design Review.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
Josh Piron, Jacob Pfister, Kevin Templar, Mike Phillips グループ 9 (Group 9) ‏ PCB Design DART.
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Final Design Review
ECE 477 Final Presentation Team 9  Fall 2009 DART.
ECE 477 Design Review Team 8  Spring 2007
ECE 477 Design Review Team 21 - Spring 2013
ECE 477 Design Review Group 3  Fall 2005
ECE 477 Design Review Group 6  Fall 2005
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Team 14  Spring 2012
ECE 477 Design Review Team 5  Fall 2006
ECE 477 Final Presentation Team 1  Spring 2008
ECE 477 Design Review Team ??  Fall 2012
ECE 477 DESIGN REVIEW TEAM 14  SPRING 2010
Presentation transcript:

ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,

Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation PCB layout Software design/development status Project completion timeline Questions / discussion

Project Overview Driver’s Assistant Recorder Tracker (DART) Speedometer Stop Watch Accelerometer Lap Counter Customizable Display Intended for the hobbyist go-kart racer

Project-Specific Success Criteria 1) An ability to log data from various sensors. 2) An ability to time and count laps. 3) An ability to monitor battery life. 4) An ability to store data on external memory. 5) An ability to customize race display.

Block Diagram Five Main Areas Microcontroller Sensors Power SD/MMC User Interface

Component Selection Rationale: Microcontroller Low Operating Voltage Multiple A/D Multiple Analog Sensors Room for expansion Higher Clock Speed Polling multiple sensors Standard Peripherals SPI, UART, and I2C

Component Selection Rationale: DSPIC33FJ128MC804 Operates at 3 to 3.6 Volts 9 Channel 10 Bit A/D Converters 40 MIPS 2 SPI, 2 UART, 1 I2C 128 Kbytes Flash / 16 KBytes Ram 4 External Interrupts 26 Remappable pins 35 Available I/O pins

Component Selection Rationale: LCD & SD/MMC LCD and Carrier Board Graphics LCD Carrier board for less LCD programming, more user interface SD/MMC Card Adapter Breakout board for better file manipulation

Component Selection Rationale: Sensors Sensors Temp Thermocouple & ATD Converter Speed Magnet Switch Accelerometer MAX6675 Lap Counting / Timer IR Sensor/Emitter

Packaging Design Package Design Goals: Small package size (no larger than MyChron 4) Large, sunlight-readable display Six or more buttons for easily navigating menus Water resistant Durable

Schematic/Theory of Operation: Power

Schematic/Theory of Operation: Microcontroller

Schematic/Theory of Operation: External Interfaces

Software Design/Development Status Polling Loop Poll each sensor Log data Update Display SD/MMC Storage Design Consideration Update inside Polling Loop vs. Post Collection Menu / Display Interface Customized Racing Display Simple / Robust menu functions

Project Completion Timeline Week 8 LCD Assembly & Testing Design Review Week 9 Sensor Assembly & Testing Proof of Parts, Finalize Schematic/PCB Week 10 SD/MMC Testing Finish Software Design Narrative Week 11 PCB Arrive, begin populating Finish Patent Liability Analysis

Project Completion Timeline Week 12 Finish Power + Micro Populating Near final software complete Finish Reliability and Safety Analysis Week 13 SD/MMC + LCD interfacing completed Final Software complete Finish Ethical and Environmental Impact Analysis Week 14 Finish Assembly

Project Completion Timeline Week 15 Field Testing Finish User Manual Week 16 Prepare Final presentation Week 17 Grab Diploma & Run (Kevin)

Questions / Discussion