NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 Route 111 to Mount Pleasant Road Design-Build Project Request for Qualifications Informational.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
New York State Department of Transportation Rochester Station PIN , Contract DH34463 Design-Build Project Request for Qualifications Informational.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028) Saratoga, Warren, and Washington Counties.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,
Florida Department of Transportation, November 2009
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project PIN , Contract No. D Town of Babylon, Suffolk County.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 146 Over the Mohawk River Design-Build Project PIN , Contract No. D Town of Niskayuna, Schenectady.
New York State Department of Transportation
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
New York State Department of Transportation
Consulting Trends and the Design Process. Fundamental activities conducted by consulting firms Winning work Doing work Managing work Managing business.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges Over Route 80 Town of Tully, New York Region 3 PIN , Contract No. D Onondaga.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION SR 427 over Chemung River Design-Build Project PIN , Contract No. D Town of Chemung, Chemung County.
NYSDOT GreenLITES “ G reen L eadership I n T ransportation E nvironmental S ustainability” Modified from original by Mark Arner, PE, C&S Engr.
I n t e g r a t I n g C S S Practitioner Module 6 1 Module 6: CSS and Livability in Construction, and Maintenance.
GreenLITES Project Design Certification Program Recognizing Outstanding Leadership In Transportation and Environmental Sustainability AASHTO Meeting October.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
New York State Department of Transportation
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-190 & NY Rt. 265 Over NY Power Authority Reservoir Design-Build Project Draft Request for Proposals RFP Informational.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements At Various Locations in Regions 2 & 9 PIN , Contract No. D
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Land Use Study for the Community of Winchester July 9, 2012.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure (4) and Bridge (3) Replacements At Various Locations in Region 9 PIN , Contract No. D
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 8 Bundled Bridges (Columbia & Dutchess Counties) PIN 8BOW.0A, Contract No. D Draft Request for.
Maintenance and Temporary Traffic Control
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 (DB Phase 3) Terry Rd. to Gibbs Pond Rd. Design-Build Project PIN , Contract No. D
Evaluating New York GreenLITES for CDOT Projects Carrie Wallis-ATKINS Art Hirsch-TerraLogic July 12, 2011 Presentation to Colorado Department of Transportation.
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
Transportation Engineering Business Development Workshop Department M
CONTRACT AWARD TO ALTA PLANNING AND DESIGN FOR CONSULTANT SERVICES TO CONDUCT SAFETY OUTREACH AND UPDATE THE SUGGESTED ROUTES TO SCHOOL MAPS FOR THE SAFER.
Draft Transportation Element September 6, 2017
NYSDOT GreenLITES. “Green. Leadership. In. Transportation
Construction Management & Inspection
PRE-PROPOSAL MEETING, January 25, 2018 Contract No.:
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 Route 111 to Mount Pleasant Road Design-Build Project Request for Qualifications Informational Meeting September 5,

NY Route 347 – Design Build Agenda  Introductions and Opening Remarks  Project Overview  Quality Control & Quality Assurance  Procurement  Questions and Answers 2

Peter Russell Attn: NY Route 347 Office of Contracts Management New York State Department of Transportation 50 Wolf Road, 6 th Floor Albany, New York NY Route 347 – Design Build Rules of Contact 3

NY Route 347 – Design Build Agenda  Introductions and Opening Remarks  Project Overview  General Location  Goals  General Scope of Work NY Route 347 Vision Plan  Quality Control & Quality Assurance  Procurement  Questions and Answers 4

NY Route 347 – Design Build General Location 5

Bike Path NY Route 347 – Design Build General Location Start End 6

NY Route 347 – Design Build Goals  Improve safety and mobility along the Route 347 Corridor;  Efficient and Effective Project Delivery; and  Implementation of the NY 347 Vision Plan. 7

NY Route 347 – Design Build Goals Continued…  Improve safety and mobility along the Route 347 Corridor by:  Providing additional roadway lanes and improving traffic flow;  Implementing Intelligent Transportation System (ITS) technology (use of INFORM);  Improving access to public transportation;  Providing enhancement to infrastructure for use by pedestrians; and  Creating a shared-use path for bicyclists and pedestrians. 8

NY Route 347 – Design Build Goals Continued…  Efficient and Effective Project Delivery by:  Ensure coordination with other construction projects  Minimize disruption to existing traffic  Minimizing temporary construction impacts to adjacent residents and businesses Keep adjacent residents and business informed Address general project related questions from public Forward project concept questions to NYSDOT Forward questions from elected & public officials and the media to NYSDOT  Deliver Project Safely, On Schedule, On Budget, and Environmentally Compliant. 9

 Implementation of the NY 347 Vision Plan by:  Implement the principles of traffic calming measures;  Improving pedestrian and bicycle connectivity along the roadway and to bus transit;  Minimize the removal of existing vegetation and provide extensive new plantings;  Planting native vegetation to support wildlife; and  Treating road runoff to improve water quality NY Route 347 – Design Build Goals Continued… 10

NY Route 347 – Design Build General Scope of Work  Widening of NY Route 347 with additional travel lanes and shared-use path for pedestrians and bicyclists;  Pedestrian facility design and installation;  Bus turnouts and enhanced bus stop design and installation;  Extensive landscape design and installation potentially including, but not limited to: vegetated screening, planted raised median, street trees, vegetated drainage features;  Sound wall design and installation; and  Installation of street and pedestrian lighting. 11

NY Route 347 – Design Build Typical Cross Section 12

NY Route 347 – Design Build General Scope of Work Continued…  Installation and integration of the INFORM system;  Traffic signals;  Signing & pavement markings;  Work Zone Traffic Control;  Drainage and Utilities 13

NY Route 347 – Design Build General Scope of Work Continued…  Relocation and/or preservation of existing utilities  Inventory of existing utilities provided to DB Team  DB Team responsible for holding utility coordination meetings  DB Team to provide supporting documents for utility design, including: plans, Special Note of Utility Coordination & Table of Conflicts  Special Note of Utility Coordination must include work description, proposed locations and time frames  Table of Conflicts to include existing & proposed locations 14

NY Route 347 – Design Build General Scope of Work Continued…  Relocation and/or preservation of existing utilities (continued)  Supporting documents are required for Utility & Municipal Agreements to be completed by RUE  DB Team must include the cost to relocate Suffolk County Water Authority facilities in their bid. The cost shall include all permits from the Suffolk County Dept of Health and all service connections  LIPA to provide a cost estimate for their work to the RUE, once all supporting documents are provided by the DB Team. The RUE will complete the Agreement 15

NY Route 347 – Design Build “The Threads that Weave”  Concepts in the Vision Plan include :  Sustainability  Smart Growth  Context Sensitive Solutions  Environmental Stewardship  Walkability  Livability  GreenLITES 16

NY Route 347 – Design Build GreenLITES – Evergreen Certification  The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation infrastructure through the use of best practices that minimize impacts to the environment.  NYSDOT implemented “GreenLITES” (Leadership In Transportation and Environmental Sustainability), a project rating program recognizing four levels of successfully attaining these goals in our projects.  Route 347 will continue to implement as many of these best practices as possible achieving the highest level of certification… …Evergreen. 17

NY Route 347 – Design Build Making Route 347 More “Bicycle & Pedestrian Friendly” & Multimodal  Improving Bicycle & Pedestrian Facilities  Constructing a Shared-Use Path  Adding Sidewalks  Reducing Crossing Distances  Extending Crossing Times at Crosswalks  Creating “Greenway Stops” along the proposed shared-use path  Enhancing Visibility & Motorist Cues at High Pedestrian Areas ie. Senior “Activity Centers”, Schools, etc  Improving Connections to Places of Interest, Community Centers, & Transit  Identifying Destinations  Improving Access to Community Centers & Parks  Enhancing Bus Stops 18

NY Route 347 – Design Build “Enhancing the Plan”  Recognizing Opportunities for  Improving & Expanding Non-Motorized Transportation Alternatives  Improving & Expanding Access to Mass Transit & Connections  Conserving Energy  Improving & Preserving Quality of Life, Aesthetics, & the Environment  Stimulating the Economy  Developing a Corridor Theme  “ Parks to Ports Greenway ”  Identifying & Highlighting Environmental Assets  Greenway Stops, Interpretive Signs, Info. Kiosks  Utilizing Traffic Calming Features  Narrowing Lane Widths  Narrowing Shoulders  Visually Narrowing by Adding Vertical Elements ie. Street Trees, Decorative Street Lighting, and Aesthetically Enhanced Raised Planted Medians  Constructing a Buffer between Multi-Use Path and Shoulder  Reducing the Posted Speed 19

NY Route 347 – Design Build Typical Plan 20

NY Route 347 – Design Build Proposed Sound Walls or Vegetated Screening  Sound Wall Design  Objective to Provide Noise Abatement;  Must Maintain Proposed Wall’s : Location, Top Elevation, Length;  Must Integrate Sound Absorptive Material on Select Walls;  Must Provide a Through-Access Panel on at least one Wall  Design to Meet Conceptual Aesthetic Design Criteria  Vegetated Screening Design  Objective to Provide Visual Screening to the Road  May use a combination of preservation of existing vegetation, new planting and durable fence materials;  Design to Meet Conceptual Aesthetic Design Criteria

NY Route 347 – Design Build Proposed Greenway Stop 22

NY Route 347 – Design Build Implementing the NY Route 347 Vision Plan 23

NY Route 347 – Design Build Implementing the NY Route 347 Vision Plan 24

NY Route 347 – Design Build Agenda  Introductions and Opening Remarks  Project Overview  Quality Control & Quality Assurance  Procurement  Questions and Answers 25

NY Route 347 – Design Build Quality Control (QC)  QC is Design-Builder’s Responsibility  Design-Builder shall appoint a QC Manager responsible for developing QC Plan for both Design and Construction  Design QC shall be by the Designer in accordance with the QC Plan  Construction Inspection shall be by an Independent Engineering Firm (Hired by the Design-Builder)  Materials Testing shall be by an Independent Testing Firm or Laboratory (Hired by the Design-Builder)  The Independent Testing Firm shall report to the Construction Inspection Firm who shall report to the Department  Offsite Plant Quality Control will be performed by the Department 26

NY Route 347 – Design Build Quality Assurance (QA)  QA is Department’s Responsibility  The Department may perform QA on any of the Design-Builder’s activities  The Department may utilize an independent Consultant to perform QA of the Design-Builder’s Designs  The Construction QA will be department staff. 27

NY Route 347 – Design Build Agenda  Introductions and Opening Remarks  Project Overview  Quality Control & Quality Assurance  Procurement  Schedule  Contract Information  SOQ Evaluation and Selection  Additional Information and Website  Questions and Answers 28

NY Route 347 – Design Build Procurement Schedule ActivityDue Date Final RFQ ReleasedSeptember 12, 2012 Final Date for receipt of Proposer’s questionsSeptember 28, 2012 Issue Date for Final Addendum to the RFQ and/or answers to Proposer’s questions October 5, 2012 SOQ Due DateOctober 17, 2012 Shortlisted DB Teams AnnouncedNovember 1, 2012 Draft RFP IssuedNovember 7, 2012 Draft RFP Info MeetingNovember 20, 2012 Final RFP to Shortlisted FirmsDecember 5, 2012 Proposals DueJanuary 17, 2013 Selection of Best ValueFebruary 1, 2013 Execute ContractFebruary 28, 2013 Notice to ProceedMarch 1,

NY Route 347 – Design Build Contract Information  Lump Sum Design-Build Contract  Two Step Design-Build Procurement Process  Project Schedule  Total Duration 28 Months +/- (under review)  There will be a Payment Schedule provided in the RFP  Stipend Under Consideration by NYSDOT  Liquidated Damages may be imposed for missed milestones and final completion  ROW by NYSDOT  Construction Related Permits (i.e., SPDES) by Design-Builder  The final RFQ will be updated to reflect that only Greenman-Pedersen, Inc. and Stantec Consulting Services, Inc. will be disqualified 30

NY Route 347 – Design Build SPDES General Permit  D/B Team to prepare SPDES Stormwater Pollution Prevention Plan (SWPPP) consistent with NYSDEC and NYSDOT procedures;  D/B Team shall design drainage system to treat Stormwater Quality and Quantity as per NYSDEC and NYSDOT guidance documents;  D/B Team to prepare Notice of Intent (NOI) for NYSDOT signature/submission to NYSDEC. 31

NY Route 347 – Design Build SOQ Evaluation and Selection  Pass/Fail Evaluation Factors  Legal;  Financial;  Backlog Capacity;  Proposal responsiveness; and  Vendor Responsibility.  Quality Evaluation Factors  Organization and Key Personnel (40%)  Experience of the Firms (25%)  Project Understanding (20%)  Past Performance (15%) 32

NY Route 347 – Design Build Additional Information  Responses to Proposer Questions will be posted on the Department Website  Final Addendum to the RFQ will be issued by Friday, October 5, 2012  Additional Reference Information to be Posted on Website:  Final Design Report / Final EIS / Final Section 4(F) Evaluation  Contract D Design Drawings (Adjacent Contract)  As-Built Drawings NY 347  Soil Borings  SUE Utility Data  Route 347 Revaluation 23CFR – Review & Appendixes (Including NY 347 Vision Plan)  There will be a Buy America Clause  There will be a DBE Participation Goal 33

NY Route 347 – Design Build Project Website 34

Peter Russell Attn: NY Route 347 Office of Contracts Management New York State Department of Transportation 50 Wolf Road, 6 th Floor Albany, New York NY Route 347 – Design Build Project Contact 35

NY Route 347 – Design Build Questions and Answers Questions?? 36