E v3 aLIGO SEI Testing and Commissioning Overall Plan

Slides:



Advertisements
Similar presentations
LIGO-G M May 17, 2006 Installation (INS) Requirements and Design Breakout Presentation NSF Review of Advanced LIGO Project Dennis Coyne, Caltech.
Advertisements

LIGO - G R 1 HAM SAS Test Plan at LASTI David Ottaway November 2005 LIGO-G Z.
LIGO-G D Evaluation of EPI Approaches Dennis Coyne 18 April 2003 EPI Design Review #2.
E2E school at LLO1  Han2k »Model of the LHO 2k IFO »Designed for lock acquisition study  SimLIGO1 »Model of all LIGO 1 IFOs »Designed for –noise hunting.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Dennis Coyne Excomm Jan 26, 2004
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
LIGO Magnetic External Pre-Isolator Richard Mittleman, David Ottaway & Gregg Harry April 18, 2003.
LIGO-G M LIGO Laboratory1 Adv. LIGO Seismic Isolation (SEI) Plans, Schedule, Costs, Team Schedule »through R&D, including near-term plans »project.
Nov ’01, page 1 Current Work on Hydraulics for LIGO 1 and Advanced LIGO Rich Abbott, Graham Allen, Daniel DeBra, Joe Giaime, Giles Hammond, Marcel Hammond,
LIGO-G D 1 Requirements Environment and constraints Performance requirements Functional requirements.
LIGO-G M LIGO Laboratory1 Adv. LIGO Facilities Modifications (FAC) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G M 1 Initial LIGO Seismic Isolation System Upgrade Dennis Coyne LIGO Seminar March 29, 2002.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Active Seismic Isolation Systems for Enhanced and Advanced LIGO Jeffrey S. Kissel 1 for the LSC 1 Louisiana State University The mechanical system for.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Freiburg, May 2011 EST Design Study. End of Phase-III Meeting European Solar Telescope Design Study End of Phase III Meeting WP Instrument.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
22nd March 2005 LIGO-G R Passive attenuation for the LIGO Output mode cleaner; HAM SAS R. DeSalvo, S. Marka, V. Sannibale, A. Takamori, C. Torrie,
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
Ideal Order of QUAD Testing J. Kissel, S. Aston for the SUS Team G v5 01/18/13 1G v5.
Livingston 16 th August 2006 LIGO-G E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,
LIGO-G v3 March 30, aLIGO BSC ISI Electronics aLIGO BSC ISI Electronics FDR 3/30/2010 LIGO-G Ben Abbott, Brian Lantz.
1 HAM-ISI Medm Screens and Troubleshooting (introduction) Hugo Paris for the SEI team.
The purpose of the change of basis matrices is to combine local instruments to sense (or drive ) the platforms rigid body motions along the axis of the.
System Identification for LIGO Seismic Isolation Brett Shapiro GWADW – 19 May G v1.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Daniel Clark Dan DeBra Victor Herrera Brian Lantz Joe Hansen Jeff Kissel Michael Meyer Brian O’Reilly Celine Ramet & Staff at LLO Anamaria Effler Michael.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Poster Design & Printing by Genigraphics ® The commissioning of the prototype BSC-ISI has discovered a large number of structural resonances.
Status of RF stations for NICA project MAC meeting october 2015.
ALIGO HAM-ISI, LHO Unit #1, Testing Validation LIGO-G v1 July 23, 2010 SEI Team Seismic Isolation Group (SEI)
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
LSC Meeting at LHO LIGO-G E 1August. 21, 2002 SimLIGO : A New LIGO Simulation Package 1. e2e : overview 2. SimLIGO 3. software, documentations.
LSC Meeting March ‘07 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) LASTI Progress and Plans LSC Meeting, LLO Dave Ottaway/Richard Mittleman March.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
TBTS Test Program & Schedule G. Riddone
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Lasti ISI Update March 2007 On behalf of the SEI Team LIGO-G Z.
LIGO-G R 1 HAM Passive Seismic Attenuation System (SAS) System Performance, Fabrication, Assembly, Installation Riccardo DeSalvo, Valerio Boschi,
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
LIGO-G D Design Requirements Larry Jones Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference April.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Calibration and the status of the photon calibrators Evan Goetz University of Michigan with Peter Kalmus (Columbia U.) & Rick Savage (LHO) 17 October 2006.
Crab Cavity Technical Coordination meeting:
H1 Squeezing Experiment: the path to an Advanced Squeezer
Cryomodule test stand at ESS site
Installation of an Instrument on a CERN machine
BSC HEPI Pier Amplification
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
A Proposed Capacitive Position Sensor Timing Synchronization and Distribution Solution Ben Abbott May 9, 2014 G v1.
XFEL Vacuum System Commissioning
WP02 PRR: Master Oscillator and RF Reference Distribution
Commissioning and Testing the LHC Beam Interlock System
The 11T cryo-assembly: summary of design and integration aspects
Improving LIGO’s stability and sensitivity: commissioning examples
HAM SAS Test Plan at LASTI
LCLS Undulator System Status and Schedule
Teleconference ACS – FREIA 19th June 2017
Undulator Integration Test Status
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

E1000304-v3 aLIGO SEI Testing and Commissioning Overall Plan Components and Sub-Assemblies Testing Electronics Actuators Sensors Vacuum Pods Modules Testing (HEPI, HAM-ISI, BSC-ISI) Phase I: Assembly Validation Phase II: Integration Phase III: Control Commissioning Chamber Validation Operations

Components and Sub-Assemblies Testing Electronics: E1100876 - aLIGO SEI Electronics Testing Reports and Procedures T1100453 - Ham 2&3 System Test Plan S1105160 - LHO ISI Test Stand Results Inst. Main Page: E1100786 - aLIGO SEI Instruments, Testing Documents and Tracking Lists Actuators: E1100338 - aLIGO LHO HEPI Actuators Tests Results T1100234 - aLIGO Small Actuator Test Results from Qinetiq T0900564 - aLIGO Large Actuator Test Results from Qinetiq E1100741 - aLIGO BSC-ISI, Actuators Installation Location Sensors: E1000257 - aLIGO HAM-ISI Capacitance Position Sensor Testing E1100231 - aLIGO BSC-ISI Capacitance Position Sensor Testing E1100326 - aLIGO T 240 seismometers for BSC-ISI E1100397 - aLIGO GS-13 testing E1000136 - aLIGO L4C Status Chart Pods: E1100396 - aLIGO Seismometer Pods Neon Leak Test Results Instrumentation: E1100740 - aLIGO BSC-ISI, Seismometers Installation Location E1100770 - In-Vacuum Cabling Status for BSC6, BSC8, HAM2, HAM3 E1100822 - aLIGO BSC-ISI, Cables inventory and Installation Location

Modules Testing Overview HEPI Modules (33) HAM-ISI Modules (15) BSC-ISI Modules (15) Phase I: Assembly Validation Mechanical Assembly No particular testing Install Leads Validate Phase I: Assembly Validation Full Assembly Generic procedure - Validated per test results and report Phase I: Assembly Validation Full Assembly Generic procedure - Validated per test results and report Instrumentation Transport to IFO Transport to IFO Phase II: Integration Check HEPI is ready to receive an ISI platform (Stack, HAM-ISI or BSC-ISI) Install ISI platform on HEPI Leveling Connect Actuators Generic procedure to check and validate HEPI Phase II finishes when we close the chamber. Phase II: Integration Simplified side chamber testing if no instrumentation change after Phase I. Thorough side chamber testing if instrumentation modified after Phase I. Insertion in the chamber Integration with optical components Unit specific testing, function of optics installation sequence. Phase II finishes when we close the chamber. Phase II: Integration Install on stand, balance and check functionalities Integration with optical components Unit specific testing, function of optics installation sequence. Cartridge installation Post insertion testing Phase II finishes when we close the chamber. Close the chamber Close the chamber Close the chamber Phase III: Control Commissioning Generic Step by Step procedure Acceptance criteria Phase III: Control Commissioning Generic Step by Step procedure Several levels of performance Acceptance criteria Phase III: Control Commissioning Generic Step by Step procedure Several levels of performance Acceptance criteria Meet acceptance criteria. Meet acceptance criteria. Meet acceptance criteria. Operation Operation Operation

Phase I: Assembly Validation HEPI Overview: Mechanical assembly (no Instruments) No particular tests (rigid connection between cross beams and piers). No report. Final check is the leveling. Assembly validation is responsibility of SEI installation lead (Jeremy @ LLO, Hugh @ LHO) HAM-ISI Overview: Sub-assembly check, Inventory, Balancing, Check & adjust gaps, Range of motion, Static tests, Linearity tests, Power spectrums, Transfer functions… Main page: E1000305 - aLIGO HAM-ISI Testing and Commissioning Documentation Procedure: E1000309 - aLIGO HAM-ISI, Pre-integration Testing Procedure, Phase I (post-assembly) Report Example: E1000326 - aLIGO HAM-ISI, Pre-integration Test Report, Phase I, LLO Unit #2 BSC-ISI Overview: Similar to HAM-ISI. Twice many stages. Main page: E1000306 - aLIGO BSC-ISI Testing and Commissioning Documentation Procedure: E1000486 - aLIGO BSC-ISI Testing Procedure, Phase I (Post-assembly) Report Example: E1100294 - aLIGO BSC-ISI, Pre-integration Test Report, Phase I, LHO Unit #1

In other words, all the testing related to merging with other modules Phase II: Integration Everything between the end of the module assembly and closing the chamber. In other words, all the testing related to merging with other modules HEPI Overview: Check that HEPI is ready to receive an ISI or Stack (Stops, Leveling…) Check actuators and sensors (L4C power spectrums, IPS DC values…) Install ISI (or passive stack) Unlock HEPI. Monitor dial indicators, load cells. Level HEPI. Connect actuators. Set IPS gaps. Check the control software (SEI and SUS Watch dogs) Test HEPI (Range of motions, Transfer functions, turn on low performance loops) Leveling, alignments. Report and validation of phase II.

Everything between end of the module assembly and closing the chamber Phase II: Integration Everything between end of the module assembly and closing the chamber In other words, all tests related to merging with other modules HAM-ISI Phase II starts when the HAM-ISI unit is mounted on a stand in the observatory (LVEA or End Station) Two-case scenario: Assembly already completed and fully tested in the assembly building (i.e. HAM-ISI 8 & 9 @ LHO) Minimum side chamber testing before insertion (DC values of CPS, power spectrums of GS13s…) . Could be done without electronic rack if not available. Testing completed after the chamber is closed. Assembly completed in LVEA or End Station (Install GS13, CPS Shield…) Need Side Chamber Testing before Installation. After installation in the chamber: - Platform is being populated with optics - Testing sequence to be detailed chamber per chamber. Report, Validation Close the chamber: End of Phase II Phase III: Control Commissioning

Everything between end of the module assembly and closing the chamber Phase II: Integration Everything between end of the module assembly and closing the chamber In other words, all tests related to merging with other modules BSC-ISI Phase II starts when the BSC-ISI unit is mounted on stand in the observatory (LVEA or End Station) Check functionalities (Static Tests, Transfer functions). Compare with measurements after assembly (Phase I) Test control functionalities (Damping, Level 1 control…) Integration with optical components. Testing is chamber specific, function of the optics installation sequence. Installation in the chambers Test basic control functionalities in the chamber (Damping, Level 1 control…) Report, Validation Close the chamber: End of Phase II Phase III: Control Commissioning

Phase III: Control Commissioning Everything after closing the chamber and before hand-off to operations HEPI: Control strategy developed for iLIGO Detailed step by step procedure based on the BSC-ISI model Being tested at LASTI Procedure being written HAM-ISI: Control strategy developed for eLIGO Step by Step procedure based on the BSC-ISI model BSC-ISI: Control strategy developed on ETF and BSC-ISI prototype Step by Step procedure Tested at LASTI

Performance Levels HEPI HAM-ISI and BSC-ISI Basic control functionality tests during HEPI checkout (Phase II) Regular performance control loops, Sensor Correction (Phase III) HAM-ISI and BSC-ISI Low Frequency control: High Blend: Low performance ~ 1 Hz Blend frequency Phase II Medium Blend: Medium Performance ~ .3 Hz Phase III Low Blend: High Performance ~.1 Hz Phase III High Frequency Control: Control Level 1 : Low performance ~ 10 Hz Unity gain frequency Phase II Control Level 2 : Medium Performance ~ 20 Hz Unity gain frequency Phase III Control Level 3 : High Performance ~ 30 Hz Unity gain frequency Phase III