Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting European Solar Telescope Design Study End of Phase III Meeting WP 10300 Instrument.

Similar presentations


Presentation on theme: "Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting European Solar Telescope Design Study End of Phase III Meeting WP 10300 Instrument."— Presentation transcript:

1 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting European Solar Telescope Design Study End of Phase III Meeting WP 10300 Instrument Control System Cosentino, R., Romano, P. Belluso, M., Comparato, M., Giorgi, F., Grivel, C., Laforgue, D., Paez, E.

2 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 2 Instrument Control Software Overview The instruments are designed and constructed to be used simultaneously and synchronized. There will be also a deep interaction among the ICS and some external sub- system developed by other sub-WPs

3 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 3 EST ICS architecture Two options are available to send a command to ICS. In the former case an already defined configuration, i.e., list of commands and parameters, can be send to the ICS through the sequencer. In the latter case a generic user can select a configuration by the GUI. Moreover, the user can download a complete configuration and can use the GUI to modify some parameters or part of the setup.

4 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 4 ICS coordinator classes

5 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 5 Broad Band Imager

6 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 6 Devices Numbe r of devices Type of movement Comments Mechanism to insert appropriate optical targets 1TBD TBD if it will be common for all the instruments Linear stage to switch between the two different resolution modes 22 positions Mechanism: linear stage TBC Focus system1or 2Linear TBD, along the optical axis Filter wheels or linear stages 2TBD The number of slots is TBD Instrument sensorsTBDN/A hw controlled; temperature monitoring; environment monitoring (TBD at ICS level?) Filter electronic device TBDN/A hw controlled; temperature monitoring Linear stage for out of focus detector 1LinearAlong the optical axis Detector controller3N/A1 controller per detector Crossed polarizer drive 1 or 2rotation 1 in continuum sub channel and 1 (TBC) in “narrow band” sub channel Broad Band Imager

7 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 7 BB class diagram

8 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 8 BB use case

9 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 9

10 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 10

11 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 11 Narrow Band tunable filter Spectropolarimetr Devices Number of devices Type of movement Comments Stop wheel1rotationalwith 4 slots Filter wheel for filtergram channel 1rotationalthe number of slots is TBD Filter wheel for continuum channel 1rotationalthe number of slots is TBD Pre filter tilt device2tilttuning purpose Focus drive2linear for focusing purposes; with 2 linear stages Linear stage for laser channel1linear to insert and remove the laser flip mirror ICOS / controller of each FP3piezo 3 actuators and 5 air capacitors; hw controlled and monitoring Instrument sensorsTBDN/A hw controlled; temperature monitoring Modulator package2linear to remove and insert the modulator and the Wollaston prism Linear stage for etalons3linear to remove and insert an individual etalon Tilt device for etalons3tiltto tilt an individual etalon Tilt devices for collimator mirrors 2tiltfor collimation purposes High precision rotation table1rotationalfor alignment purposes Crossed polarizer drive1rotationalto adjust the light level Detector controller2N/A1 controller per detector (TBC) Linear stage for out of focus detector (TBC) 1LinearAlong the optical axis

12 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 12 NB class diagram

13 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 13 NB use case

14 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 14

15 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 15 Grating Spectropolarimeter

16 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 16 SP class diagram

17 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 17 GS use case

18 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 18

19 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 19 Deployment diagram

20 Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting 20 Plan for the next future Detailed definition of classes and methods Implementation of instrument simulator Development of instrument control system in “simulation mode” (prototyping) Test of the communication software Final design of the node deployment Reliability and failure analysis of critical parts Development of instrument user interfaces (GUI)


Download ppt "Freiburg, 17-20 May 2011 EST Design Study. End of Phase-III Meeting European Solar Telescope Design Study End of Phase III Meeting WP 10300 Instrument."