TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.

Slides:



Advertisements
Similar presentations
Design and Implementation of Low- Cost Optical Telemetry to Support Radiometric Analysis of the Atmosphere University of Colorado at Boulder Alexandra.
Advertisements

Programmable Interval Timer
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 GROUND MAGNETOMETER GBO DESIGN.
Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
Autonomous Helicopter: James Lyden Harris Okazaki EE 496 A project to create a system that would allow a remote- controlled helicopter to fly without user.
ESODAC Study for a new ESO Detector Array Controller.
Page 1 Aalborg University Communication system for the AAUSAT-II Communication System for the AAUSAT-II Kresten K. Sørensen Department.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
IO Controller Module Arbitrates IO from the CCP Physically separable from CCP –Can be used as independent data logger or used in future projects. Implemented.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
Manfred Meyer & IDT & ODT 15 Okt Detectors for Astronomy 2009, ESO Garching, Okt Detector Data Acquisition Hardware Designs.
- Software block schemes & diagrams - Communications protocols & data format - Conclusions EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE F. S.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
DARPA Digital Audio Receiver, Processor and Amplifier Group Z James Cotton Bobak Nazer Ryan Verret.
4.0 rtos implementation part II
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
ISUAL Sprite Imager Electronic Design Stewart Harris.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
Segway Controller Notes. = connection on top layer of circuit board = connection on bottom layer of circuit board Ground Plane: Areas enclosed by the.
1HSSPG Georgia Tech High Speed Image Acquisition System for Focal-Plane-Arrays Doctoral Dissertation Presentation by Youngjoong Joo School of Electrical.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.
ONE Concept. ONE Work area & lab setup ONE Goals Provide single network interface regardless of physical link Provide reliable, isochronous message transport.
Autonomous Helicopter James LydenEE 496Harris Okazaki.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
CINEMA (CubeSat for Ions, Neutrals, Electrons & MAgnetic fields) Jerry Kim * David Glaser † Thomas Immel ‡ * Systems Engineer, †
Front End DAQ for TREND. 2 Introduction: analog part 2015, feb 10 th.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
TRIO-CINEMA 1 UCB, 2/08/2010 Cinema Stein Interface FPGA (CSI) [Part II] Karthik Lakshmanan CINEMA - EE Team Space Sciences Laboratory University of California,
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Automatic accident avoiding system PROJECT MEMBERS MUTHUKUMAR.K (05ME33) SAKTHIDHASAN.S (05ME39) SAKTHIVEL.N (05ME40) VINOTH.S (05ME56) PROJECT GUIDE:
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley.
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
TRIO-CINEMA FSW- 1 SSL, 8/10/2010 Flight Software Seyoung Yoon and Sameet Ramakrishnan Space Sciences Laboratory Kyung Hee University University of California,
PowerBench Programmable Power Supply Dror Lazar Moran Fishman Supervisor: Boaz Mizrahi Winter Semester 2009/10 HS DSL.
TPC electronics Status, Plans, Needs Marcus Larwill April
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
TRIO-CINEMA 1 UCB, 2/08/2010 LVPS & Switching Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
TRIO-CINEMA 1 UCB, 2/08/2010 Integration and Test Program Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
Wireless Power Transfer Via Inductive Coupling SENIOR DESIGN GROUP 1615 RYAN ANDREWS, MICHAEL DONOHUE, WEICHEN ZHANG.
TRIO-CINEMA 1 UCB, 2/08/2010 ClydeSpace Electronic Power System Yashraj Khaitan Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
TRIO-CINEMA 1 UCB, 2/08/2010 ACS Dave Auslander, Dave Pankow, Han Chen, Yao-Ting Mao, UC Berkeley Space Sciences Laboratory University of California, Berkeley.
MICROCONTROLLER AND INTERFACING Presented by: Shefali Jethva ( ) Shivali Panchal ( ) Komal Soni ( ) Roll no. :- 14EC308.
C osmic R Ay T elescope for the E ffects of R adiation 27 June 2005 Digital Engineering Digital Sub-System Bob Goeke.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface FPGA David Clarino CINEMA Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Command & Data Handling
Command & Data Handling
ISUAL Associated Electronics Package
Introduction to Microprocessors and Microcontrollers
Digital Sub-System Bob Goeke.
Presentation transcript:

TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 2 UCB, 2/08/2010 Instrument Interface Board Agenda AGENDA Overview Block Diagrams Requirements Instrument Interface Board Components Development Plan Issues

TRIO-CINEMA 3 UCB, 2/08/2010 Overview Instrument Interface Board houses LVPS, Communication Interface Logic and Miscellaneous Buffers/Drivers Overall Context

TRIO-CINEMA 4 UCB, 2/08/2010 Instrument Interface Board Block Diagram

TRIO-CINEMA 5 UCB, 2/08/2010 Requirements Level 1 Mission Assurance MA-01Mission Life1 year + Verification: Parts selection shall choose from ruggedized and historically rad- tolerant part types. MA-02QualityUse high quality commercial parts, space flight fabrication techniques. Utilize extensive testing to achieve reliability. Cost MA-03RadiationUse rad tolerant parts where possible without significantly impacting cost. Consider spot shielding of critical parts with little shielding by the bus. Some form of solar cell protection (cover glass) probably required to meet mission life. Expected 1 year dose is 10krads behind 1mm Al, 3krads behind 2mm Al Cost

TRIO-CINEMA 6 UCB, 2/08/2010 Requirements Level 3 Sun Sensor (2x) SUN-03 Interface pull-up resistor, filter cap, discriminator on FPGA card; timing circuit on FPGA times rising edge, available to C&DH Sensor Interface Requirement By Design/Inspection Level 3 Torque Coils (2x) TRQ-03 Interface Bus power switches controlled by PWM on Instrument Interface Card. Switches may be on LVPS card or Instrument Interface Card (TBR) Torque Coil Interface Requirement IIB houses both LVPS and Torque Coil Drivers Level 2 IIB (Instrument Interface and Power Board) IIB-01Primary Primary voltage is ~8V bus voltage (7-9V, TBR) IIB-02Secondary Provide +/-5V, +/-12V, +20V regulated secondaries (no primary ground isolation required) Currents TBD. Also +5VD, +3.3VD, +1.5VD [TBR}, some of which may be provided by EPS Design/Test IIB-03 Torque Coil Switches Provide primary voltage switches controlled by 4 logic signals that allow you to power the two coils with either polarity. Design/Test IIB-04 Other switches Provide primary voltage switches for: MAGIC boom actuator, MAG 12V and 16V, STEIN actuators (2x), Transmitter, HVPS Design/Test STEIN Actuators (now on STEIN?) IIB-05 STEIN Bias Supply Provide programmable 0-150V bias supply. Supply must be very quiet but provides almost no DC load. Design/Test (now on STEIN?)

TRIO-CINEMA 7 UCB, 2/08/2010 Requirements IIB-06C&DH Interface High speed interface to C&DH (>1Mbps)1Mbps transmitter IIB-07 Transmitter Interface Take data stream provided by C&DH (CCSDS packets? Partially formatted CCSDS frames?), append CCSDS transfer frame, RS encoding, Convolutional encoding, and provide serial data stream to transmitter (filtered?) at 1Mbps Design and Test/Verification IIB-08STEIN Interface Interface to STEIN ADCs (TBR - STEIN ADC board may have ADC interface FPGA). Format event telemetry stream. Apply decimation of low energy events based on control from C&DH. Format a second stream of rate counter data (LLD, ULD per detector). Transfer data stream to C&DH Design: Input Data from CDI Interface, Transfer to CPU via SPI, FIFO Buffer with status to CPU IIB-09LVPS Interface Provide logic signals to the LVPS to control the MAGIC boom actuator, HV and transmitter power switches (TBR), STEIN attenuator actuator switches, and torque coils Design/Test IIB-10Torque Coils Provide a programmable duty cycle PWM to run the selected torque coil switch. PWM should run at ~100KHz and be programmablle in 1% or better increments. No more than one switch should be active at a time (4 switches for torque coils - one per polarity per coil, selected by C&DH). Design/Test IIB-11STEIN HVPS Provide 2 DAC outputs to control STEIN HV by C&DH command Now on STEIN IIB-12STEIN Bias Provide 1 DAC output to LVPS to set STEIN detector BIAS supply level by C&DH command Now on STEIN IIB-13STEIN thresholds Interface with 4 threshold DACs on STEIN electronics Now on STEIN IIB-14 Board HeightNot to exceed.984" (25mm)Fits within stack

TRIO-CINEMA 8 UCB, 2/08/2010 Instrument Interface Board Components (1) Instrument Interface Board Components Master Clock (2 24): 16.8MHz Timing Synchs as needed (e.g. 1Hz Synch to STEIN) Derived Clocks (4.2MHz to MAG, 8.4MHz to STEIN) Timestamps Telemetry Frames Provides Time information to CPU (via Register Interface) FPGA Telemetry Framer Interface Translator/Parser Uses I 2 C for internal registers, STEIN CDI commands and internal setup configuration (switches, actuators, PWM Control, etc) Provides a path for STEIN Message Data CDI from STEIN to SPI to CPU FIFO buffered – FIFO Status Available to CPU Provides SPI Interface to MAG for ADC Control and Readout Register Banks FIFOs as needed for STEIN and Telemetry Control

TRIO-CINEMA 9 UCB, 2/08/2010 Instrument Interface Board Components (2) Instrument Interface Board Components (continued) Specialized Buffers/Drivers Actuators Torque Drivers (4) One PWM signal from FPGA is steered to one of four Torque Converters Sun Sensor Receivers (2) Open Collector Receiver with Pull-up and Filter Cap – Logic signal forwarded to the FPGA for further filtering Switches Torque Coil and Power, Actuator Switches, Emhiser Card, (others?) Low Voltage Power Supply Receive Primary Power (7-9 VDC) Produce Secondary Voltages – use off the shelf regulators +/-5V, +/-12V, +20V regulated secondaries (no primary ground isolation required), +5VD, +3.3VD, +1.5VD

TRIO-CINEMA 10 UCB, 2/08/2010 Data Rates IIB/IIF is the Conduit Between the various CINEMA Subsystems –Must provide the 1Mbps continuous data stream to the S-Band transmitter Framing performed in hardware CPU provided fully formatted CCSDS packets via the SPI link Fill generated by hardware when no processor data is available –SPI Data to/from CPU Used for S-Band Telemetry and STEIN Data (only one active at any one point in time) ~10MHz –STEIN – CDI Message Interface 16 bits/event, 80KHz events = 1.28Mbps Interface bit rate = 8.4MHz, Data rate = 4Mbps (includes CDI Protocol and Message Tag Overhead, “fixed message size” mode) –MAGIC Interface 20 bits/sample x 20 samples/second x 3 axes = 0.001Mbps I 2 C to/from CPU SPI (resident in IIF) to/from MAG

TRIO-CINEMA 11 UCB, 2/08/2010 Development Plans Development Specification for FPGA (in progress, David Clarino) Parts Selection and Overall Design –Power Supply Modules –Custom Design as needed –Buffer, Switches and Driver circuits Board Schematic (not yet started) CINEMA System Verification using Engineering Board Flight Board (relayout if necessary) follows test/verification Load into Flight System Joins CINEMA Test Flow and Quality reporting

TRIO-CINEMA 12 UCB, 2/08/2010 Issues IIF/IIB Some requirements are still TBD Personnel for schematics and board layout