COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.

Slides:



Advertisements
Similar presentations
The COSMO-LEPS system at ECMWF
Advertisements

COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
Ensemble activities in COSMO C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
WG7 summary and Science Plan Chiara Marsigli ARPA Emilia-Romagna, SIMC.
Statistical Postprocessing of Weather Parameters for a High-Resolution Limited-Area Model Ulrich Damrath Volker Renner Susanne Theis Andreas Hense.
ESA DA Projects Progress Meeting 2University of Reading Advanced Data Assimilation Methods WP2.1 Perform (ensemble) experiments to quantify model errors.
A.Montani; The COSMO-LEPS system. Present status and future plans of the COSMO-LEPS system Andrea Montani, D. Cesari, T. Diomede, C. Marsigli, T. Paccagnella.
The impact of moist singular vectors and ensemble size on predicted storm tracks for the winter storms Lothar and Martin A. Walser 1) M. Arpagaus 1) M.
Short-Range Ensemble Prediction System at INM José A. García-Moya & Carlos Santos SMNT – INM COSMO Meeting Zurich, September 2005.
WWOSC 2014, Aug 16 – 21, Montreal 1 Impact of initial ensemble perturbations provided by convective-scale ensemble data assimilation in the COSMO-DE model.
ISDA 2014, Feb 24 – 28, Munich 1 Impact of ensemble perturbations provided by convective-scale ensemble data assimilation in the COSMO-DE model Florian.
NWP Activities at INM Bartolomé Orfila Estrada Area de Modelización - INM 28th EWGLAM & 13th SRNWP Meetings Zürich, October 2005.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific.
A. Montani. - COSMO-LEPS for Sochi 2014 Development of a LAM-EPS system for Sochi Winter Olympics Andrea Montani C. Marsigli, T. Paccagnella ARPA-SIMC.
A.Montani; The COSMO-LEPS system: recent developments and plans 2nd Workshop on Short-Range EPS, Bologna, 7-8 April 2005 The COSMO-LEPS system: recent.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Data mining in the joint D- PHASE and COPS archive Mathias.
WORKSHOP ON SHORT-RANGE ENSEMBLE PREDICTION USING LIMITED-AREA MODELS Instituto National de Meteorologia, Madrid, 3-4 October 2002 Limited-Area Ensemble.
Verification of the distributions Chiara Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna Bologna, Italy.
A.Montani; The COSMO-LEPS system. COSMO-LEPS: present status and plans Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate Regional.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Suggested Projects for the.
A. Montani. - COSMO-LEPS for Sochi 2014 Development of a LAM-EPS system for Sochi Winter Olympics Andrea Montani C. Marsigli, T. Paccagnella ARPA-SIMC.
Short-Range Ensemble Prediction System at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
HNMS contribution to CONSENS Petroula Louka & Flora Gofa Hellenic National Meteorological Service
Interoperability at INM Experience with the SREPS system J. A. García-Moya NWP – Spanish Met Service INM SRNWP Interoperability Workshop ECMWF –
Plans for Short-Range Ensemble Forecast at INM José A. García-Moya SMNT – INM Workshop on Short Range Ensemble Forecast Madrid, October,
Ensemble data assimilation in an operational context: the experience at the Italian Weather Service Massimo Bonavita and Lucio Torrisi CNMCA-UGM, Rome.
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz First Experience with KENDA at MeteoSwiss Daniel Leuenberger,
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 4 activities.
SREPS Priority Project COSMO General Meeting Cracov 2008 SREPS Priority Project: final report C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological.
COSMO-DE-EPS Susanne Theis, Christoph Gebhardt, Michael Buchhold,
NWP Activities at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
Multi-model Short-Range Ensemble Forecasting at Spanish Met Institute
A.Montani; Performance of the COSMO-LEPS system during DOP COSMO meeting - Cracow September 2008 Performance of the COSMO-LEPS system during D-PHASE.
A.Montani; COSMO-LEPS status, verification, … X COSMO meeting - Cracow September 2008 COSMO LEPS system: status, verification, applications Andrea.
A.Montani; The COSMO-LEPS system. Recent developments and plans for the COSMO-LEPS system Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate.
SREPS Priority Project: final report C. Marsigli, A. Montani, T. Paccagnella ARPA-SIMC - HydroMeteorological Service of Emilia- Romagna, Bologna, Italy.
First experiments with KENDA for providing ICs to COSMO-It-EPS Chiara Marsigli Tiziana Paccagnella Andrea Montani ARPA Emilia-Romagna, SIMC.
FE 1 Ensemble Predictions Based on the Convection-Resolving Model COSMO-DE Susanne Theis Christoph Gebhardt Tanja Winterrath Volker Renner Deutscher Wetterdienst.
Activities of the new WG7 Chiara Marsigli. WP Development of COSMO-LEPS Maintenance and updates of the operational suite at ECMWF (A. Montani) Study,
Langen, September 2003 COSMO-LEPS objective verification Chiara Marsigli, Francesco Boccanera, Andrea Montani, Fabrizio Nerozzi, Tiziana Paccagnella.
Short Range Ensemble Prediction System Verification over Greece Petroula Louka, Flora Gofa Hellenic National Meteorological Service.
CONSENS Priority Project Status report COSMO year 2009/2010 Involved scientists: Chiara Marsigli, Andrea Montani, Tiziana Paccagnella, Tommaso Diomede.
Deutscher Wetterdienst Preliminary evaluation and verification of the pre-operational COSMO-DE Ensemble Prediction System Susanne Theis Christoph Gebhardt,
Performance of COSMO-LEPS over the Alpine region Chiara Marsigli, Andrea Montani, Fabrizio Nerozzi, Tiziana Paccagnella ARPA-SMR, Bologna, Italy ICAM/MAP.
Short-Range Ensemble Prediction System at INM García-Moya, J.A., Santos, C., Escribà, P.A., Santos, D., Callado, A., Simarro, J. (NWPD, INM, SPAIN) 2nd.
10th September 2009Theis, Gebhardt, Buchhold, Paulat, Ohl, Ben Bouallègue, PeraltaProject COSMO-DE-EPS Developing an Ensemble Prediction System based on.
PP CONSENS Merging COSMO-LEPS and COSMO- SREPS for the short-range Chiara Marsigli, Tiziana Paccagnella, Andrea Montani ARPA-SIMC, Bologna, Italy.
VERIFICATION Highligths by WG5. 2 Outlook Some focus on Temperature with common plots and Conditional Verification Some Fuzzy verification Long trends.
A study on the spread/error relationship of the COSMO-LEPS ensemble Purpose of the work  The spread-error spatial relationship is good, especially after.
CONSENS Priority Project Status report COSMO year 2009/2010 Involved scientists: Chiara Marsigli, Andrea Montani, Tiziana Paccagnella, Tommaso Diomede.
Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
CONSENS Priority Project Status report COSMO year 2008/2009 Involved scientists: Chiara Marsigli, Andrea Montani, Tiziana Paccagnella, Tommaso Diomede.
A.Montani; The COSMO-LEPS system: 5-year milestone COSMO meeting, Athens, September 2007 The COSMO-LEPS system: getting close to the 5-year milestone.
WG4 Oct 2006 – Sep 2007 plans COSMO General Meeting, 21 September 2006 Pierre Eckert.
A.Montani; The COSMO-LEPS suite at ECMWF: present status and developments COSMO meeting, Zurich, September 2005 The COSMO-LEPS suite at ECMWF: present.
1Deutscher WetterdienstMärz 2005 April 2005: 19 NWS/ 21 forecast products (1) AustriaALADIN-LACE (9.6 km) ARPEGE (2) Czech Repub ALADIN-LACE (9 km) ARPEGE.
LEPS VERIFICATION ON MAP CASES
BACY = Basic Cycling A COSMO Data Assimilation Testbed for Research and Development Roland Potthast, Hendrik Reich, Christoph Schraff, Klaus.
Arpae Hydro-Meteo-Climate Service, Bologna, Italy
A.Montani; The COSMO-LEPS system.
Daniel Leuenberger1, Christian Keil2 and George Craig2
COSMO-DE-EPS Susanne Theis, Christoph Gebhardt, Michael Buchhold,
Preliminary test for the development of a 2.8km ensemble over Italy
The COSMO-LEPS system: present status and outlook Andrea Montani, Chiara Marsigli and Tiziana Paccagnella ARPA-SIM Hydrometeorological service of Emilia-Romagna,
Christoph Gebhardt, Zied Ben Bouallègue, Michael Buchhold
NWP Strategy of DWD after 2006 GF XY DWD Feb-19.
SRNWP-PEPS COSMO General Meeting September 2005
New PP: Consolidation of COSMO ensemble (CONSENS)
Short Range Ensemble Prediction System Verification over Greece
Presentation transcript:

COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy

limited-area model error: schemes, parameters, surface forcings COSMO-SREPS methodology  i.c. and b.c. perturbations -> INM multi-model multi- boundary (SREPS)  model perturbations -> parameter perturbation (fixed value throughout the integration to test the impact of the different parameter perturbations) LAM ensemble driving model error analysis error at the global model scale larger scale errors smaller scale errors

System applications  COSMO Priority Project -> Short-Range Ensemble  1D-Var DA of satellite data to provide retrievals to be nudged within 7km COSMO-I7: test of the use of COSMO-SREPS to estimate a flow-dependent B matrix  COSMO-SREPS provides boundary conditions for the ensemble system at 2.8 km under development at DWD (COSMO-DE-EPS)

Involved COSMO people  Marsigli, Montani, Paccagnella (ARPA-SIM): 1.5 FTE  Flora Gofa, Petroula Louka (HNMS): verification, 0.5 FTE Collaboration:  Susanne Theis, Christoph Gebhardt (DWD): EELMK  Uli Schaettler (DWD): COSMO model code

Task 0. Preliminary actions for the system set-up: completed. Task 1. Definition of the methodologies to perturb model trajectories: completed Task 2. Definition of the methodologies to perturb initial conditions: suspended Task 3. System set-up: completed (set-up for the JJASON 2007 period during the MAP D-PHASE DOP) Task 4. Test on case studies: on-going (21 runs in autumn 2006 done, analysis on-going) Task 5. Test on a regular basis: on-going (running on the JJASON 2007 period during the MAP D-PHASE DOP) Task 6. Verification: on-going

System set-up 16 COSMO runs 10 km hor. res. 40 vertical levels COSMO at 25 km on IFS IFS – ECMWF global by INM Spain COSMO at 25 km on GME GME – DWD global COSMO at 25 km on UM UM – UKMO global COSMO at 25 km on NCEP AVN – NCEP global P1: control (ope) P2: conv. scheme (KF) P3: tur_len=1000 P4: pat_len=10000

intra-group distance 14 days (00UTC runs) 2mT whole domain

Daily precipitation ROC area Northern Italy + Switzerland observations Average over 0.5 x 0.5 deg boxes - +42h fc range

Daily precipitation ROC area Northern Italy + Switzerland observations Average over 0.5 x 0.5 deg boxes - +66h fc range

Relationship between error and spread 12UTC runs Northern Italy observations Nearest grid point

ensemble mean 2m Temperature nearest grid point

Ensemble member verification Precipitation – mm / 6h IFS GME UKMO NCEP

Ensemble member verification Precipitation – mm / 6h Tiedtke, pat_len500 Kain-Fritsch, pat_len500 Tiedtke, tur_len1000, pat_len500 Tiedtke, pat_len10000

Deterministic scores – ave 0.5 x 0.5 IT+SV 1mm/24h5mm/24h10mm/24h 12 UTC

Deterministic scores – ave 0.5 x 0.5 IT+SV 1mm/24h5mm/24h10mm/24h 12 UTC

Conclusions  ic and bc perturbations contribute to the spread for an amount approximately double with respect to the parameter perturbations, statistically over the whole domain and the whole period in terms of 2mT. Locally (in space and time) the situation can be quite different  the selected parameters produce a detectable spread among members with the same father  rms error is grater than spread for all the events but the correlation is good  different fathers contribute differently to the skill, for different parameters this is less clear

On-going activities  run of COSMO-SREPS with model perturbations for the DOP MAP D-PHASE (6 months, June-November 2007) :  statistical analysis of the system  comparison with the other available mesoscale ensemble systems  verification - system analysis (HNMS)  provide b.c. for DWD ensemble tests  test a flow-dependent B-matrix for 1D-Var of satellite data  test of different parameters (16 runs using only the IFS initial and boundary conditions)

Test of parameter perturbations (same father) 16 LM runs at 10 km P1: control (ope) P2: conv. scheme (KF) P3: parameter 1 P4: parameter 2 P5: … IFS – ECMWF global

Fine