Promoting Payments for Ecosystem Services and related sustainable financing schemes in the Danube Basin Promoting Payments for Ecosystem Services and related.

Slides:



Advertisements
Similar presentations
The Basics of FP7 ОПЕРАТИВНА ПРОГРАМА “АДМИНИСТРАТИВЕН КАПАЦИТЕТ” ЕВРОПЕЙСКИ СЪЮЗ ИНВЕСТИЦИИ В ХОРАТА Проектът се осъществява с финансовата подкрепа на.
Advertisements

Lesson Overview 6.1 A Changing Landscape.
VALUASI EKONOMI SUMBERDAYA LAHAN: PASAR LAHAN Diabstraksikan : soemarno, jtnh fpub 2014.
PRODUKSI LOT KECIL. Pendahuluan  Segalanya diproduksi, dipesan dan ditangani dalam lot  Lot = batch  Lot: jumlah sesuatu saat diproduksi, dipesan atau.
June 2014 Bulgaria Investment climate and business opportunities.
Woody Biomass Background. Some History 1970’s energy crisis results in government subsidies and research 1978 Public Utilities Regulatory Policy Act (utilities.
PProtecting the environment is very difficult and important task on which depends our future. The environmental damages are extremely large and that.
Canadian Agency for International Development Канадстьке агентство з міжнародного розвитку International Finance Corporation Міжнародна Фінансова Корпорація.
Wetlands and Water Quality Josh 10/11/07. Wetlands and why they are important. One reason wetlands are important is because they support many different.
Energy production in Finland Energy sources 2008: 86,9 TWh. Clockwise: Hydroelectricity 19,4 %, Wind power 0,3 %, Peat 6,7 %, Biomass 10,2 %, Waste 0,6.
Fossil Fuels, Ethanol, and Biodiesel By: Emma Wellman, Vishal Garg, and Tom Barch Seeking a responsible solution to global warming by decreasing greenhouse.
The Research on the Stakeholders of the LOFT Project Associate Prof. Dr. Preslav Dimitrov Head of the LOFT Project Implementation team
Man and Energy 2 Pongthep Suwanwaree, Ph.D. School of Biology Institute of Science Suranaree University of Technology 18 January 2005.
Проект 2008/ "Здравословни, безопасни и екологични условия на труд“ Проект с финансовата подкрепа на Правителството на Норвегия чрез Норвежката програма.
© Copyright 2014 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP Enterprise Services.
Prepared by master of 2 year education Inna G. Kutova Scientific headmaster: Candidate of Agricultural Sciences, Associate professor Marina M. Ladyka Prepared.
EIB KIDS FUND ENERGY EFFICIENCY FACILITY Dipl.eng. Sevdalina Dzhabarska Independent Energy Expert Of European Investment Bank Republic of Bulgaria Ministry.
Tel: ext 7032, BIODIESEL INITIATIVE AT MEXICO’S ELECTRICAL RESEARCH INSTITUTE Jorge M. Huacuz Non-Conventional.
Institute of Biodiversity and Ecosystem Research Bulgarian Academy of Sciences.
1 WP 2011 Environment The FP7-ENV-2011 Call Конкурс 2011 г. – обща информация и направления “Климатични промени” и “Наблюдения на Земята”
1 MANAGING RISK OF NUCLEAR KNOWLEDGE LOSS L. PIRONKOV TRAINING CENTER, KOZLODUY NPP L. PIRONKOV TRAINING CENTER, KOZLODUY NPP.
Manitoba Hydro’s Emission Management Perspectives Bill Hamlin.
АСТЕЛ 2010 СОФИЯ, април 2010 г. Панел II_IS - 1 Панел II Проектиране на широколентовия достъп, добри практики Игнат Станев Колеж по телекомуникации.
Gijs Jeuken, CEO of Fidem Life Pension System in the Netherlands. European Experience. Kyiv, October 20 th, 2011.
Екологічна конференція на тему Our Planet is Our Home Вчитель англ. мови: Лазоренко Л. І. Мета: активізувати вживання ЛО з теми та використовувати набуті.
1. SELECTION OF CANDIDATES REQUIREMENTS CANDIDATES: SPECIFICALLY TRAINED STAFF PERFORM THE CONTRACT IN ACCORDANCE WITH A INTERNATIONAL RECOGNIZED SCHEME.
Проект ЄС “Виконання Україною зобов’язань щодо членства в СОТ та реалізації Європейської політики добросусідства в сільському секторі (секторальний підхід)”
ROMA MATRIX Bulgaria: National Network of Health Mediators Tackling health inequalities through health mediators and champions and understanding models.
The Truth about Ecological Revitalization - Case Studies and Tools to Improve your Cleanups Sally Brown, University of Washington Carbon Sequestration.
GIS bioenergy Options for GIS bioenergy projects Andreas Türk 25. April 2008.
MANAGEMENT AND DEVELOPMENT OF THE NON-STATE FORESTRY IN BULGARIA Ministry of Agriculture and Foods Executive Forest Agency UEF GOVERNING COUNCIL MEETING.
By: Claire Sheppard Matt Jackson Nathan Curtis and Nadia Hakim.
WEC Bulgarian Energy Day 18 th June 2010 Climate change policy beyond 2012.
Група по Иновации Удостоверения за иновативност Създаване и равитие на еко система за иновации Преференциални условия за членство.
Проект ЄС “Виконання Україною зобов’язань щодо членства в СОТ та реалізації Європейської політики добросусідства в сільському секторі (секторальний підхід)”
Шеста рамкова програма ( ) Приоритетна тема: Наука за наноразмерното състояние, материали и производство (НаноМатПро) Ана Пройкова, доц. д-р Национално.
1 FP7 - NCP 1.The 7 th Framework Programme for Research & Technological Development (FP7) 2.The National Contact Point (NCP) role & operation.
PEST Analysis, Porter’s 5 Forces and Sustainability Strategies Margarita Antonova Volunteer Telerik Academy academy.telerik.com Business System.
Forecast of Ukraine’s economic developments in 2001–2002 Міжнародний центр перспективних досліджень International Centre for Policy Studies Tel
Micro-project No.9: “Cross-border Ukrainian-Polish Youth Volunteer Program "Military Forts - Tracks of Memory” Lead Partner: “European Dialogue”, non-profit.
Impact of EU Enlargement in 2004 on Ukraine’s Foreign Trade Tetyana SHCHERBAKOVA Economist International Centre for Policy Studies Budapest, 6 February.
El Gallo Hydroelectricity Project PDD Analysis
Ukraine’s economy under political crisis conditions 2003–2004 forecast International Centre for Policy Studies Seminar-presentation for clients 7 November.
National University of Life and Environmental Sciences of Ukraine Faculty of Ecology and Sustainable Development Comparison of environmental educational.
Using Public Policy Tools to Create Public Support for Harm Reduction Initiatives International Center for Policy Studies Istanbul
Ukraine: The Country and Its Banking System Andrew BLINOV Senior Economist International Centre for Policy Studies Budapest, 15 October 2003.
1 MANAGING RISK OF NUCLEAR KNOWLEDGE LOSS L. PIRONKOV TRAINING CENTER, KOZLODUY NPP L. PIRONKOV TRAINING CENTER, KOZLODUY NPP.
Thessaloniki Technology Park Center for Research & Technology Hellas (6 Public Research Institutes with 450 staff, researchers, technicians, administrative,
г.Yundola - Bulgaria1 Country report - Bulgaria This project has been funded with support from the European Commission. This publication [communication]
UNFCCC Technical Workshop on JI: Incentives and Barriers Jan-Willem van de Ven Head of Secretariat Multilateral Carbon Credit Fund October 16, 2007.
THE INTERNATIONAL PUBLIC SECTOR ACCOUNTING STANDARDS: A STEP TOWARDS IMPROVING PUBLIC FINANCE MANAGEMENT TRANSPARENCY AND ACCOUNTABILITY BOYKO KOSTOV,
Biomass Boilers Using Energy Crops Mr. Eric Ackerly Vice President Smart Building Products ( WBE Enterprise) 1180 Route 32 Wallkill, NY Phone:
Ukraine’s economy: outlook for 2003–2004 International Centre for Policy Studies Senior Economist Andrew Blinov Presentation for economic counsellors 10.
Implementing environmental flows in Catalan rivers Cost analysis and impact on use CIS ECOSTAT HYDROMORPHOLGY WORKSHOP 12 th and 13 th June 2012 Antoni.
Lesson Overview Lesson Overview A Changing Landscape Lesson Overview 6.1 A Changing Landscape.
Monitoring Server Performance Organizing Your Support Model Borislav Varadinov Telerik Software Academy academy.telerik.com System Administrator
PRIORITIES IN DEVELOPMENT OF ROAD INFRASTRUCTURE BG 2020 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS МИНИСТЕРСТВО НА РЕГИОНАЛНОТО РАЗВИТИЕ И БЛАГОУСТРОЙСТВОТО.
Keep Environment Clean. Conditionals. Урок английского языка в 8 классе МБОУ «СОШ №13» г. Северодвинска Архангельской области Автор : Булатецкая Татьяна.
Механизмы стимулирования улавливания и утилизации шахтного метана Представлено Мередид Эванс Тихоокеанская Северозападная Лаборатория (PNNL) Семинар: “Добыча.
Автор: Мех Екатерина Вячеславовна КГБОУ СПО «Хабаровский промышленно- экономический техникум» Дневное отделение 1 курс Тема: Tour of London. Руководитель:
Universal Service Obligation in Ukraine: Experience and Expectations in Ukraine: Experience and Expectations Postal Services Technology Deputy Director.
Teknik og Miljø - Planlægning og Byggeri Aarhus Kommune Flemming Meyer Master of Law, Special Consultant Municipality of Aarhus Department of employment.
Тема урока: “Welcome the United Kingdom of Great Britain and Northern Ireland”
Java Programming: JDBC Vyacheslav Grebenyuk CTDE, AI dept., KhNURE.
Возобновляемые источники энергии и шахтный метан в законодательстве Германии Рекомендации для Украины Клеменс Бакхаус.
Keystone Agricultural Producers of Manitoba Carbon pricing: Making it work for Manitoba farmers Presented by: James Battershill, General Manager Sean Goertzen,
Scottish independence: myth or reality?myth or reality? I международный дистанционный конкурс мультимедийных презентаций на иностранном языке «Страны изучаемого.
- Изучение проблемы «Загрязнения окружающей среды» и экологической ситуации в родном селе - Поиск эффективных способов защиты окружающей среды - Разработка.
Definitions Settlement – a place where people live
District heating in Finland 2017
Presentation transcript:

Promoting Payments for Ecosystem Services and related sustainable financing schemes in the Danube Basin Promoting Payments for Ecosystem Services and related sustainable financing schemes in the Danube Basin Wetlands – modern problem or forgotten old solution ? Examples of usage and developing of market mechanisms from wetlands restoration Georgi Stefanov Policy and Climate change expert WWF - Bulgaria Workshop Nisovo, Wetlands – modern problem or forgotten old solution ? Examples of usage and developing of market mechanisms from wetlands restoration Georgi Stefanov Policy and Climate change expert WWF - Bulgaria Workshop Nisovo,

Nature park "Persina" was created in late 2000 by the Minister of Environment and Water and is one of the youngest parks in Bulgaria. Situated within three Danube municipalities Nikopol, Belene and Svishtov, with a total area of ,2 ha and approximately inhabitants. "Persina" is unique for Bulgaria and is the only park along the Bulgarian part of Danube. Declaring its objectives with conservation and restoration of Danube wetlands, with particular emphasis on preserving the natural state of numerous islands falling within the park - the islands are 24 in number, of which 5 are Romanian. There are 3 reserves, 2 natural landmarks and 1 protected area. The territory in 2007 became also a Natura 2000 site under the two directives (Habitats and Birds). In the park you can find more than 170 bird species and 450 plants species 1/3 of them directly related to the water ecosystems. The most important type of ecosystems in the park are flooded Danube forests (the Bulgarian jungles) and inland marshes. WWF has assisted the process of developing the park, and the last 10 years work in the all of it’s programs and implementing many different projects in the park area. Brief info about Persina nature park

Wetlands and marshes - what we know and what we don’t know about them ? Wetlands and marshes - what we know and what we don’t know about them ? Breading mosquitoes? (breeding fish) Breeding diseases? (used in medicine) Smell very bad? (methane production and use of biomass) Occupy unnecessary space for farmland? (minimum area, maximum benefits) (help for water balance, high value biodiversity, flood regulation) Other? (the highest productive ecosystems worldwide) Breading mosquitoes? (breeding fish) Breeding diseases? (used in medicine) Smell very bad? (methane production and use of biomass) Occupy unnecessary space for farmland? (minimum area, maximum benefits) (help for water balance, high value biodiversity, flood regulation) Other? (the highest productive ecosystems worldwide)

A) Environmental Benefits Sustainable management and use of biomass from wetlands and farmlands area of ​​ 5400 hectares (240 hectares are protected areas – “Kaikusha” marsh). Reduce the unsustainable agricultural practice of burning stubble in agricultural land and conservation of the biodiversity. Reduction of CO2 in the atmosphere associated with stubble burning and decompose of biomass in the fields / wetlands. Improve water regime of the marsh “Kaikusha” and recovery of its regulatory functions with respect to water, maintenance of fish stocks, absorption and fixation of CO2, maintaining biological diversity. Improvement of soil fertility on more than 5,000 ha of agricultural land. Improve water quality in the area of ​​ 150 ha. B) Economic benefits Creation of a business interest in the use of biomass by generating revenue from the sale of pellets and briquettes Creation of economic opportunities for users of land utilization of residues in the land as an additional source of income and the costs of collection and transmission (transport). Offering an alternative to the local population to shift from fossil fuels as coal and firewood consumption to pallets and briquettes and reduce the energy costs by an average of 30%. C) Social benefits Creation of employment among the local population by engaging them in processes of extraction and processing of biomass. Creation of jobs indirectly as an additional source of revenue for collection and transportation of raw materials. Nature Park – “Persina” and surrounding agricultural areas - creation of market scheme “biomass from wetlands” - maximum benefits for everybody

The scheme … Providers of ES: Farmers Providers of ES: Farmers Buyers of ES: Companies for production of pellets Buyers of ES: Companies for production of pellets biomass euro

Easy for connection with the other WWF programs, projects and activities in the region; High value and available area; Climate change orientated solution. Big potential for growing. Feasibilities studies show that in Bulgaria about 30% straw, 65% of cornstalks and 80% of other solid agricultural waste can be taken into account for energy production, an estimated 800,000 tons annually. Economical solution to find enough political support for wetland management and wetland restoration paid by itself. Approximately biomass production from the existing protected wetlands ( hectares) by keeping nature condition (cut only 20% per year) an estimated 80,000 tons annually in production to pallets and briquettes. Why we choose to focused on biomass from wetlands and unused agriculture waste ?

New renewable energy sources (RES). Jobs, business, cheap heating for local people. Wetlands as a "reservoir" of carbon Biomass, in all its aspects, energy, construction, customs, traditions and culture Explore the possibilities of voluntary trading markets Energy use of biomass and Ideas for implementation in coming years

Amount of carbon sequestration by the most typical species (plants) of “Kaikusha” marsh (150 ha) P gC/m2/yD gC/m2/yArea haP gC/m2/yR gC/m2/y Phragmites (reed) ,380,2 Typha (bulrush) ,669,3 Schoenoplectus (sedge) ,277,2 “C” lost 20 total production 719 total respiration 499 “C” accumulation 201 Total average of 2 tones / ha / year = 600 tons Kaikusha marsh > Euro 6000 Production (P); decomposition, absorption (D); carbon accumulation (R)

ФондОписаниеКонтакт Multilateral Carbon Credit Fund (съвместна инициатива на ЕБВР и ЕИБ) Допустими проекти Въглеродните кредити могат да се генерират от разнообразни проекти, включително:  Енергия от ВЕИ – вятър, води, биогас, биомаса  Енергийна ефективност в индустрията (когенерация) и строителството  Избягване на аварии и изтичане при добива и обработката на природен газ и нефт.  Преминаване към въглеродно-неутрални горива  Поглъщане на емисии парникови газове (въглеродно свързване в гори) Jan-Willem van de Ven, Head of the MCCF Secretariat Phone: (+44) (+44) European Bank for Reconstruction and Development One Exchange Square, London EC2A 2JN, United Kristin Lang, Deputy Head of the MCCF Secretariat Phone: (+352) (+352) European Investment Bank 100, boulevard Konrad Adenauer, L-2950 West zone Carbon manager: Haskoning, Prototype carbon fund на Световна банка PCF финансира разнообразни пилотни проекти за редуциране на въглеродните емисии в рамките на механизмите Чисто развитие и Съвместно изпълнение. Carbon Finance Unit, ENV The World Bank, 1818 H Street, NW, Washington, DC 20433, USA phone fax BioCarbon Fund на Световна банка Това е специализиран фонд на Световна банка за демонстрационни проекти, които свързват въглеродни емисии в горски екосистеми и земеделски култури. Фондът е публично-частна инициатива, администрирана от WB, която цели ценово-ефективно поглъщане на въглерод, съчетано с опазване на биоразнообразието и социални ползи. Фондът може да одобрява разнообразни проекти, свързани с подобряване на управлението на земите и горското стопанство. Такива са залесяване, попълване, редуциране на емисии от обезлесяването, земеделски ползвания. Carbon Finance Unit, ENV The World Bank, 1818 H Street, NW, Washington, DC 20433, USA phone fax Italian Carbon Fund (ICF) ICF финансира проекти в широк диапазон, включително въглеродно свързване. Фондът е създаден от правителството на Италия по споразумение със Световна банка. Carbon Finance Unit, ENV The World Bank, 1818 H Street, NW, Washington, DC 20433, USA phone fax Danish Carbon Fund Фондът обединява финансов ресурс от Правителството на Дания и няколко големи датски енергийни компании по споразумение със Световна банка Carbon Finance Unit, ENV The World Bank, 1818 H Street, NW, Washington, DC 20433, USA phone fax

№ Type of the fuelCalorific valueEfficiency Price of the fuel (by 2010) Price per 1 КW 1 Diesel 11,67 KW/liter88%2.07 lv/liter Electricity 1 KW100%0.173lv/kw Nature gas 9,89 KW/m 3 90%0.9349lv/m Wooden chips 4.9/KW/kg90%0.36lv/kg Pallets from wetlands and agriculture waste 5.16/KW/kg90%0.28lv/kg0.063 Comparison table of prices of heat from different fuel types allows automation of the heating process

Type of culture Sown area ha Average yield per ha - ton Overall biomass production - ton Wheat and barley Corn Sunflower Reed TOTAL Biomass amounts of a different cultures

№ Name of indicatorsUnit of quantity Standardized methods, validated internally lab № for the record Results form tasting Norm DIN Moisture%DIN ,1 ±0,2 12 max 2. Specific heating value kcal/kgDIN Working fuelkcal/kgDIN ± Working fuelKJ/kgDIN ± Sulfur content of dry mass %DIN ,056 ±0,003 0,08 max 4. Balance after incineration / ash / dry weight of %DIN ,5 ±0,1 1,5 max 5. Extraction of volatile substances on dry weight %DIN ,2 ±0,2 - Test results of the Reed - Independent laboratory analysis – Sofia

Comparisons of the financial value of biomass yield in two versions: option 1 Processing of 1 ton of biomass in the village Lesidren (150 km) option 2 Processing of 1 ton of biomass in Belene (20 km) Leva per ton Production of biomass 40,00 lv. Primary processing (baling) and transport 120,00 lv.30 lv. Processing of biomass supply and delivery 200,00 lv. Labor 100,00 lv. Value of the pallets 460,00 lv.370,00 lv. Market value of conventional pellets 400,00 lv. Reserve / Balance + 40,00 lv.- 30,00 lv.

Economical conclusion based on the analysis and calculated potential, says that the indicators for evaluating the effectiveness of the investment and financial indicators give reason to believe that the investment is effective and the idea could be realized Net Present Value – by 33% for 10 years Internal Rate of Return – approximately by 68% Profitability Index – 6,3% Payback period – 2 years

Indicators of treated water, meeting the required values ​​ for the discharge of treated wastewater in accordance with national legislation in this area. Two to three times lower financial costs for construction and maintenance of such equipment compared with conventional treatment plants. Cover within the European requirements concerning the construction of treatment facilities in small settlements less than people. Possibilities for utilization of biomass from these wetlands, such as renewable Creation of semi-natural habitats suitable for a significant part of the flora and fauna that inhabit these types of habitats. Create additional opportunities for tourism and recreation around those areas adjacent to settlements. And more benefits…: constructed wetlands as a wastewater treatment system – very suitable for small villages

Conclusion for wetlands  The highest - productivity ecosystems  Opportunities for additional income for local people  Diverse benefits, including all  Local energy source  Decision to costly problems such as floods and construction of treatment plants for domestic wastewater in in small settlements  Highest absorbability of C02

ЗАКЛЮЧЕНИЕТО ! ‘It takes a new way of thinking to solve the problems that we created by the old way of thinking’ "Трябва нов начин на мислене за решаване на проблемите, които ние сме създали поради стария модел на мислене"

Thank you! Georgi Stefanov