Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 WP 2011 Environment The FP7-ENV-2011 Call Конкурс 2011 г. – обща информация и направления “Климатични промени” и “Наблюдения на Земята”

Similar presentations


Presentation on theme: "1 WP 2011 Environment The FP7-ENV-2011 Call Конкурс 2011 г. – обща информация и направления “Климатични промени” и “Наблюдения на Земята”"— Presentation transcript:

1 1 WP 2011 Environment The FP7-ENV-2011 Call Конкурс 2011 г. – обща информация и направления “Климатични промени” и “Наблюдения на Земята”

2 2 ОБЩИ ХАРАКТЕРИСТИКИ ЗА КОНКУРСА 2011 Call identifier: FP7-ENV-2011 Date of publication : 20 July 2010 Deadline : 16 November 2010 Indicative budget, : EUR 155 000 000

3 3 Основните направления са : Activity 6.1 Climate Change, pollution and risks Activity 6.2 Sustainable management of resources Activity 6.3 Environmental technologies Activity 6.4 Earth observation and assessment tools for sustainable development Activity 6.5 Horizontal activities

4 4

5 5 6.1 Climate Change, pollution and risks Имат се предвид изследвания отнасящи се до по- добряване на нашето знание относно функционирането на климата и земната система, включвайки полярните области; адаптация и мерки за смекчаване; замърсяването на въздуха, почвите и водата; промени в състава на въздуха и водния цикъл; както и глобалните и регионалните взаимодействия между климата и атмосферата, земната повърхност, леда и океана; и въздействието върху биоразнообразието и екосистемите. Основните акценти са върху безпрецедентното въздействие върху околната среда и климата, взаимодействието околна среда и човешкото здраве и природните опасни явления.

6 6 ПОДРАЗДЕЛИ Sub-activity 6.1.1. Pressures on environment and climate (Бюджет : 37 000 000 EUR) 7 теми са отворени Sub-activity 6.1.2. Environment and health (Бюджет : 18 000 000 EUR) 5 теми са отворени Sub-activity 6.1.3. Natural Hazards (Бюджет : 18 000 000 EUR ) 5 теми са отворени

7 7 Sub-Activity 6.1.1 Pressures on environment and climate ТЕМИ: 1.ENV.2011.1.1.1-1 Improvement of the representation of critical climate processes in climate and Earth system models Funding scheme: Collaborative Project (large scale integrating project) 2.ENV.2011.1.1.2-1 The impact of atmospheric pollution on European land ecosystems and soil in a changing climate Funding scheme: Collaborative Project (large scale integrating project)

8 8 Sub-Activity 6.1.1 Pressures on environment and climate ТЕМИ: 3.ENV.2011.1.1.2-2 Climate forcing of non UNFCCC gases, aerosols and black carbon. Funding scheme: Collaborative Project (small or medium-scale focused research project) 4.ENV.2011.1.1.3-1 Vulnerability of Arctic permafrost to climate change and implications for global GHG emissions and future climate. Funding scheme: Collaborative Project (large scale integrating project) 5.ENV.2011.1.1.5-1 Impacts of climate and land use changes in the Amazon. Funding scheme: Collaborative Project (small or medium-scale focused research project)

9 9 Sub-Activity 6.1.1 Pressures on environment and climate ТЕМИ: 6.ENV.2011.1.1.6-1 Impacts of a global temperature increase up to 2°C from pre-industrial level, in Europe and most vulnerable regions of the world Funding scheme: Collaborative Project (large scale integrating project) 7.ENV.2011.1.1.6-2 Mitigation policies and measures in the world’s major economies compatible with the objective of limiting global surface temperature increase below 2°C Funding scheme: Collaborative Project (small or medium- scale focused research project)

10 10 Sub-Activity 6.1.2 Environment and health Непрекъснато се усилва необходимостта от нови знания отнасящи се до повишаващото се взаимодействие околна среда-човешко здраве, включвайки идентификация на източниците; За тази цел се насочва финансиране за изследванията свързани с биологичния мониторинг за човешкото здраве в зависимост от околната средата, качеството на въздуха в затворени помещения, градската околна среда, емисиите от автомо-билите и въздействието им, и възникващите рискови фактори вследствие опасните субстанции.

11 11 Sub-Activity 6.1.2 Environment and health ТЕМИ: 1.ENV.2011.1.2.1-1 Environmental change and its effects on atopic diseases (allergies, asthma, eczema) in Europe. Funding scheme: Collaborative Project (small or medium- scale focused research project) 2.ENV.2011.1.2.2-1 Combined exposures to environmental agents: integrated approaches to evaluate environment-health relationships in children. Funding scheme: Collaborative Project (large scale integrating project) Additional eligibility criterion related to SME participation applying to this topic is set out in the topic description

12 12 Sub-Activity 6.1.2 Environment and health ТЕМИ: 3.ENV.2011.1.2.2-2 Exposure to electro-magnetic fields (EMF): investigations of mechanisms to support risk assessment and reduce uncertainty Funding scheme: Collaborative Project (small or medium- scale focused research project) 4.ENV.2011.1.2.3-1 Integrating ecological and human risk evaluations for better risk governance Funding scheme: Coordination and Support Action (coordinating action)

13 13 Sub-Activity 6.1.2 Environment and health ТЕМИ: 5.ENV.2011.1.2.3-2 Positive effects of natural environment for human health and well-being Funding scheme: Collaborative Project (small or medium- scale focused research project)

14 14 Sub-Activity 6.1.3 Natural Hazards ТЕМИ: 1.ENV.2011.1.3.1-1 Towards real-time earthquake risk reduction. Funding scheme: Collaborative Project (large scale integrating project) 2.ENV.2011.1.3.2-1 Building societal resilience to disasters in Europe Funding scheme: Collaborative Project (small or medium-scale focused research project)

15 15 Sub-Activity 6.1.3 Natural Hazards ТЕМИ: 3.ENV.2011.1.3.2-2 Vulnerability and increased drought risk in Europe. Funding scheme: Collaborative Project (small or medium-scale focused research project) 4.ENV.2011.1.3.3-1 Risk prevention and management before volcanic eruptions. Funding scheme: Collaborative Project (small or medium-scale focused research project) for specific cooperation actions (SICA) dedicated for international cooperation partner countries (focus on Latin America)

16 16 Sub-Activity 6.1.3 Natural Hazards ТЕМИ: 5.ENV.2011.1.3.4-1 Capacity building in natural hazards risks reduction Funding scheme: Coordination and Support Action (coordinating action) Additional eligibility criterion related to SME participation applying to this topic is set out in the topic description

17 17 ACTIVITY 6.4. EARTH OBSERVATION AND ASSESSMENT TOOLS FOR SUSTAINABLE DEVELOPMENT Sub-activity 6.4.1. Earth and ocean observation systems and monitoring methods for the environment and sustainable development (Бюджет : 20 000 000 EUR) 4 теми са отворени Sub-activity 6.4.2 Forecasting methods and assessment tools for sustainable development taking into account different scales of observation (Бюджет : 13 000 000 EUR) 4 теми са отворени

18 18 Подкрепят се изследванията относно: системи за наблюдения на земята и океана и методите за мониторинг във връзка с екологично и устойчиво развитие; развитието и интеграцията на наблюдателните систе- ми за целите на околната среда и устойчивостта в рам- ката на GEOSS (глобална земна наблюдателна система на системите), [включвайки и програмата GMES (глобален мониторинг и сигурност на околната среда )]. взаимна оперативност между системите и оптимиза- цията на информацията за по изчерпателно знание, моделиране и прогнозиране на екологичните явления както и за оценка, експлоатация и управление на природните ресурси.

19 19 Sub-activity 6.4.1. Earth and ocean observation systems and monitoring methods for the environment and sustainable development ТЕМИ: 1.ENV.2011.4.1.1-1 Integration and optimisation of information for building a Global Carbon Observing System. Funding scheme: Collaborative Project (large scale in- tegrating project) – for specific cooperation actions (SICA) dedicated to international cooperation partner countries 2.ENV.2011.4.1.3-1 Inter-operable integration of shared Earth Observations in the Global Context. Funding scheme: Collaborative Project (large scale integrating project)

20 20 Sub-activity 6.4.1. Earth and ocean observation systems and monitoring methods for the environment and sustainable development ТЕМИ: 3.ENV.2011.4.1.4-1 Developing increased EO capacity for better agriculture and forestry management in Africa. Funding scheme: Collaborative Project (small or medium-scale focused research project) for specific cooperation actions (SICA) dedicated to international cooperation partner countries

21 21 Sub-activity 6.4.1. Earth and ocean observation systems and monitoring methods for the environment and sustainable development ТЕМИ: 4.ENV.2011.4.1.4-2 Assessing the ecosystem status, including fisheries, within the Mediterranean marine coastal areas of North African countries. Funding scheme: Collaborative Project (small or medium-scale focused research project) for specific cooperation actions (SICA) dedicated to international cooperation partner countries

22 22 Sub-activity 6.4.2 Forecasting methods and assessment tools for sustainable development taking into account different scales of observation ТЕМИ: 1.ENV.2011.4.2.1-1 Efficiency assessment of environmental policy tools related to sustainability Funding scheme: Collaborative Project (small or medium-scale focused research project) 2.ENV.2011.4.2.2-1 Knowledge brokerage activities for engaging in a "beyond GDP" society. Funding scheme: Collaborative Project (small or medium-scale focused research project). Additional eligibility criterion: The requested EU contribution shall not exceed EUR 1 500 000.

23 23 Sub-activity 6.4.2 Forecasting methods and assessment tools for sustainable development taking into account different scales of observation ТЕМИ: 3.ENV.2011.4.2.3-1 Community based management of environmental challenges. Funding scheme: Research for the benefit of specific groups – Civil Society Organisations, Additional eligibility criterion: A minimum of one participant from Latin America is required 4.ENV.2011.4.2.3-2 Sustainable Consumption and Production at the heart of green growth Funding scheme:Collaborative Project (small or medium-scale focused research project)

24 24 ПРОЕКТЕН ЦИКЪЛ Идея Създаване на консорциума Синтез на предложение Изпращане на предложението Оценяване&селекция Договаряне Контракт разработка Съглашение На Консорциума Краен отчет (вкл.финансов) Реалната работа по проекта Плащане

25 25 Благодаря за вниманието !


Download ppt "1 WP 2011 Environment The FP7-ENV-2011 Call Конкурс 2011 г. – обща информация и направления “Климатични промени” и “Наблюдения на Земята”"

Similar presentations


Ads by Google