FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.

Slides:



Advertisements
Similar presentations
Capital Beltway HOT Lanes Project Project Update April 2009.
Advertisements

New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
4-1 Application Workshop. 4-2 Module Objectives Apply the concepts learned to a freeway lane closure Case 1. Without a back up Case 2. With a back up.
Work Zone Impact Strategies Module 6. TMP Overview3 Identification of TMP Strategies Should be based on: type of work zone traffic conditions anticipated.
Bob Grubbs Lead Bridge Engineer ODOT Region 3, Tech Center Lessons Learned FAST 14, Boston MA FHWA Highways for Life Showcase.
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Grade Separation Alternative
Construction Communications. Communication is an expectation Inform our customers about improvement projects Raise awareness of: Construction zone locations.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
I-95 Bridge Rehabilitations: Project Overview Steven McNeely, Project Manager Project Management Office Richmond District.
Corridor-Wide Construction Presentation to FDOT Materials Lab
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
I-696 Integrated Corridor Management (ICM) Operations Traffic Incident Management Best Practices resulting from Good Government in Action.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1 Traveler Information on 2010 Construction Route 7 over I-87 (Exit 6) Bridge Replacement Town of Colonie.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
I-65 Added Travel Lanes Project in Tippecanoe County
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
MAINTENANCE & TRAFFIC OPERATION INCIDENT MANAGEMENT.
SafeZone Martin Baker Road Safety Team Leader Poole Borough Council Kevin Jones UK Product Sales Manager Siemens.
Temporary Traffic Control Standards Update. Why? Came into this position soon after TC details became TTC standards about 1.5 years ago (2/13/2013) As.
LLANO COUNTY MUD #1 ROAD PROJECT REVIEW PURPOSE DISCUSS POSSIBILITY OF COMPLETING REMAINING ROAD UPGRADE PROVIDE FACTS TO INFORM COMMUNITY TO MAKE DECISION.
Illinois state line to Madison Dane and Rock County
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
© 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source: FHWA.
TEA, Portland, Maine Travis Koestner Missouri Department of Transportation October 20, 2006 Alternate Paving Update $$ Cost Control at MoDOT $$
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Offsite Detour analysis. Calculation of detour length Distance along SR = Distance along SR
Purpose of Work Shop Share Ohio’s experience with a full closure reconstruction: the rationale, challenges, implementation and benefit.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Some Findings on Public Outreach for Work Zones.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Understanding Work Zones
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
Transportation Operations Group Designing for Speed, Congestion, and Delay in the Work Zone Gerald Ullman Research Engineer Texas Transportation Institute.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Geometric Design: General Concept CE331 Transportation Engineering.
TALKING FREIGHT SEMINAR: Truck Separated Lanes/Truck Tolling MARCH 16, 2005 DARRIN ROTH DIRECTOR OF HIGHWAY OPERATIONS AMERICAN TRUCKING ASSOCIATIONS.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
2007 Incident Management Summit Sri Balasubramanian Chief, Office of Emergency Management Division of Maintenance California Department Of Transportation.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
The I-465 West Leg Reconstruction Project
General Tab Project, Cost Schedule, and Work Limits Roadway Character
MODULE 2: TSMO Strategies
Contract 60X10 Informational Meeting Weber I-55
Geometric Design: General Concept CE331 Transportation Engineering.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
HERO UNIT Training Module
Traffic Control Plan A plan directed to the safe and expeditious movement of traffic through construction and to the safety of the work force performing.
MODULE 2: TSMO Strategies
Presentation transcript:

FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY

WHY CHOOSE FULL CLOSURE OF TWO MAJOR INTERSTATES?

THE ANSWER

ADVANTAGES OF FULL CLOSURES Impact on customers (travelers) is for a much shorter duration than traditional part width-construction. Use of detour is a safer driving environment than being stuck in traffic in traditional part width construction. Safer working environment for the contractors. Receive a higher quality end product.

DISADVANTAGES OF FULL CLOSURES Limited locations it can be used. More coordination and planning needed up front. More expensive?

KENTUCKY’S FIRST EXPERIENCE WITH FULL CLOSURES I-65 in Louisville, Kentucky A 90 Day Project in 107 Hours 2000

TRADITIONAL TRAFFIC CONTROL VS. FULL CLOSURE Using Traditional methods, work would have taken approximately 90 working days as opposed to two weekends for the full closure. Using traditional methods, estimates showed severe traffic congestion throughout the day (6am-6pm). Using a full closure has larger impact on the traveling public, but for a much shorter duration. This holds with the Cabinet’s philosophy of, “Get In, Get Out, & Stay Out.” Using a full closure gave the Cabinet the opportunity to complete supplemental needed repairs in the work zone.

FACTS ABOUT THE I-65 PROJECT ADT of 130,000 vehicles (approximately 50% commercial truck traffic) Work zone six miles in length Replaced bridge expansion joints (17NB & 27SB) Resealed bridge expansion joints (2NB & 6SB) Patched bridge decks (5 Bridge NB & 5 Bridges SB)

I-65 DETOUR  The total detour length was 20 miles; however, the detour was only 7 additional miles longer than the original route. Twelve side streets were partially or completely closed during the two weekends.

KENTUCKY’S SECOND EXPERIENCE WITH FULL CLOSURES I-64 in Louisville, Kentucky An Eight Month Project in 8 Weekends 2001

TRADITIONAL TRAFFIC CONTROL VS. FULL CLOSURE Using Traditional methods, work would have taken approximately eight months as opposed to 8 weekends for the full closure (the Cabinet estimated 15 weekends). Using traditional methods, traffic modeling showed severe traffic congestion throughout the day with possible backups of 15 miles. Using a full closure has larger impact on the traveling public, but for a much shorter duration. This holds with the Cabinet’s philosophy of, “Get In, Get Out, & Stay Out.” Full closure allows the Cabinet the opportunity to complete supplemental needed repairs in the work zone.

FACTS ABOUT THE I-64 PROJECT ADT of 100,000 vehicles Work zone 3.3 miles in length 135,000 tons of asphalt placed (paved approximately 13 lane miles) Poured 428 CU.YDS. Of concrete overlays on bridges and in the tunnels New barrier walls placed on the bridges & inside the tunnels 10 acres of sod placed in the median 40,000 tons of stone used on shoulders and for road repairs 30,000 feet of guardrail installed/replaced (1/3 rustic guardrail) Installed video cameras, vehicle detectors, & variable message signs New lighting system placed in the tunnels 90 new street lights installed

STEPS TO INSURE SUCCESS Public Awareness/Public Information Campaign Partnering with the media Newspaper & Radio Advertising Personal visits to businesses & residents along work zone Use of ITS systems (TRIMARC) Sent flyers to trucking industry Placed information on CB radio Cabinet setup a local phone number to give information

STEPS TO INSURE SUCCESS (CONT’D) A Sound Traffic Control Plan Advance signage/Intensive signage Comprehensive Traffic Control Plan Involvement of local and state police Used helicopters to monitor traffic flow

RESULTS No major backups No traffic accidents Public’s needs better served More respect for the Cabinet from the community Safer, more efficient work zone environment

LESSONS LEARNED Full closure is a viable traffic control alternative. Public awareness is vital to the success of full closures. Public prefers full closures as compared to traditional traffic control methods.