EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: October 7, 2009.

Slides:



Advertisements
Similar presentations
A sampling of stream and watershed improvement projects in the Lower Gallatin watershed.
Advertisements

Williamson County Bond Program: City of Georgetown PARKS ELEMENT – –Hike and bike trail expansion from Bootys Road Park to Williams Drive along Bootys.
January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
Oklahoma Regions. Eastern Oklahoma Ozark Plateau: This region is in NE OK. It is famous for its wild, rugged beauty. Pure cold springs feed the Illinois.
Indian Mill Creek Watershed Road Stream Crossing Report Survey conducted by Janice Tompkins and Mary Sievert, MDEQ during October of 2003.
Town of Southbury Department of Public Works 2014.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
The Great Ohio Lake-To-River Greenway PICTURE THIS…. An 100 mile-long green band of protected open space running through fertile farmlands, lush woodlands,
Public recreation sites (Municipal) Public recreation sites (County) Pleasant Valley Park BERNARDS TOWNSHIP PARKS AND TRAILS Dunham Park Whitenack Woods.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: July 12, 2010.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Map Colors Black -cultural man made features (bldgs, roads, elevations, all labels) Blue -hydrography or water features (stream, river, lake, swamp,
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010.
Green- Duwamish River Watershed
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
Property Surveys  Legal Description  Definite boundaries  Must be clear – only one point  Must not change with time  Courts assume:  First in time.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Gleneagle North HOA Annual Meeting 23 September pm.
Bringing It In House. IndianTrailsSportsComplexexpansion.
Continuous School Improvement August Objectives  Our purpose for continuous school improvement  Key Indicator – IE06 (OTTW Connections)  Tiered.
CITY COUNCIL GOALS & OBJECTIVES. TOP PRIORITY Street Valley Gutters 33 installed by Public Works 35 installed by contractor Pipe Replacement Program.
Elk & Nature Tourism in North Central Pennsylvania.
May 27 th, 2003FRCV Conservation Plan Summary and Status Rock Creek Valley Conservation Plan & Priorities Prepared by Friends of Rock Creek Valley with.
DCCCD Brookhaven College City Council Presentation October 16, 2007.
 Prepared by  Prepared for  City of Palm Coast, Florida  January 27, 2015  Drainage Study Sections 30 & 34 for Development of City Wide Stormwater.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
Community Development Department Construction Phase.
Bringing It In House. IndianTrailsSportsComplexexpansion.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: OCTOBER 10, 2012.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: JULY 8, 2011.
Case No. VA Board of County Commissioners October 20, 2015.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: October 7, 2010.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Section 1: How We Use Land
© 2010, TESCCC Regions of Texas ©2012 TESCCC Kindergarten Unit 13, Lesson 2.
Regions of Texas.
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
Georgia’s Geographic Regions. Essential Question??? What are the significant geographic regions of Georgia, and how have they impacted Georgia’s growth.
Current and upcoming projects. Controlled Burns Planned for 2012: 8,290 acres possible FY12 Wilson Creek 1250 acres completed 11/2011 FY12 Dobson Knob.
A proposed route for a walking trail between Trapelo Road and Beaver Street in Waltham, Massachusetts Based on field inventory and reporting by the Mass.
NY-NJ Trail Conference West Hudson North accomplishments for 2015 Black Rock Forest Minnewaska State Park Preserve Schunemunk State Park Storm King State.
Social Studies Review Unit Two Miss Bowen 4 th grade Social Studies.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Greenway Connectivity Soft Trails Road Trails Shared Use Trails.
Where is Maryland located? Maryland is located along the Atlantic coast of the United States. It is near the center of those states which border on the.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: July 10, 2006.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Land. Here are some pretty hills. It takes a long time to hike (or walk) up a hill.
Georgia’s Geographic Regions. Essential Question??? What are the significant geographic regions of Georgia, and how have they impacted Georgia’s growth.
Monday-Thursday Route Participants Agusta Ct Agusta Ct Baltusrol Drive Baltusrol Drive Barnes Lane Barnes Lane Beverly Road Beverly Road Brae Burn Drive.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Proposed Resurfacing FY16 and FY17 (Spring/Summer 2016)
FY 2016 – 2017 BUDGET OVERVIEW Forest Preserve District of DuPage County.
Athletic Field Contact Information Area 1: Russell Arrington, Manager Michael Harris, Athletic Fields Manager Blake Lane Park Cunningham.
The _______________ are yellow, Red and orange in autumn. seasons There are 4______________.
The Oak Ridges Trail What to expect.
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
10 TREK TRAILS North Walk-in-Water Creek North Walk-in-Water Creek
Jason Throneberry Aquatic Ecologist.
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
CHEROKEE PARK TRAIL MAP 6 Miles / 1100 ft Elevation change
Arkansas Regions.
2017 SAVE OUR STREAMS MONITORING REPORT SML WATERSHED
WESLEYAN P MAJOR MAINTENANCE FY 14 Foss Hill 1-7
SUNCREEK ESTATES Section 1
H64:02 Clear River East & West Hills Sept 8/99 (mvc-019f)
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
Monterey County Project Report for Measure X Expenditures
Emergency Services Mill Levy Results by Percentage (For-Against) Nov 2017 P A R K C O U N T Y & C I T Y O F L I V I N G S T O N P R E C I N C T S V O.
Presentation transcript:

EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: October 7, 2009

FY 2009 YEAR TO DATE TOTALS MANHOLE INSPECTIONS TAB 1 MANHOLE REPAIRS TAB 2 TV INSPECTION TAB 3 ROOT CONTROL TAB 4 HYDRAULIC CLEANING TAB 5 EASEMENT CLEARING TAB 6 AERIAL STREAM CROSSING INSPECTIONS TAB 7 COMBINED TOTALS BY FISCAL YEAR TAB 8

MANHOLE INSPECTIONS INFLOW/INFILTRATION SECTION6,041 SYSTEM MAINTENANCE 71 TAB 1

MANHOLE REPAIRS CONTRACTED (RAISED) 2,738 GENERAL MAINTENANCE 42 TAB 2

TV INSPECTION INFLOW/INFILTRATION SECTION 64, 659’ SYSTEM MAINTENANCE 69,446’ TAB 3

ROOT CONTROL PHASE 1 20,853’ ARUBA DRIVE CHARLOTTE CIRCLE DAN PLACE ENNISBROOK DRIVE FOXWOOD TRAIL HIDDEN TRAIL ROAD IVY CHASE RIDGECREST DRIVE TIMBER CREEK VALLEY VIEW DRIVE PHASE 2 382,318 ’ ATLANTA COUNTRY CLUB BEAVER CREEK DOGWOOD FOREST MISTY FOREST OVERLAKE RIVER CLIFF SEVEN SPRINGS WESTVIEW CHELSEA PARK CHESTNUT LAKE DOBBS CROSSING INDIAN HILLS HAMPTON WOODS PINEHURST PRINCETON WALK ROBINSON FARMS WOODLAWN DRIVE WOODSTONE WEST TAB 4

PHASE 3 233,046’ ANNWICKS AUTUMN RIDGE BUNKER HILL CEDAR FORKS CROSS GATE FREY LAKE INDIAN HILLS HAMMOND WOODS HOLLY MILL RUN MURDOCK ROAD PINETREE COUNTRY CLUB RIO MONTANA SHADOWOOD SPEARPOINT SUMTER LAKE WELLINGTON WOOD VALLEY WORLEY DRIVE PHASE 432,367’ BEN KING DRIVE CHEATHAM WOODS COUNTY SERVICES PKWY. FERN VALLEY DRIVE SHAW ROAD STERLING TRAIL TIFFANY LANE

HYDRAULIC CLEANING GENERAL MAINTENANCE 160,189’ (COUNTY WIDE) TAB 5

EASEMENT CLEARING PHASE 1 93,913’ PHASE 2 112,359’ PHASE 3 21,887’ TAB 6

AERIAL STREAM CROSSING INSPECTIONS INFLOW/INFILTRATION SECTION 536 SYSTEM MAINTENANCE 26 TAB 7

Totals by Fiscal Year Linear Feet TAB 8

Each Totals by Fiscal Year TAB 8

Totals by Fiscal Year Tab 8 Each