EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: OCTOBER 10, 2012.

Similar presentations


Presentation on theme: "EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: OCTOBER 10, 2012."— Presentation transcript:

1 EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: OCTOBER 10, 2012

2 FY 2010 YEAR TO DATE TOTALS MANHOLE INSPECTIONS TAB 1 MANHOLE REPAIRS TAB 2 TV INSPECTION TAB 3 ROOT CONTROL TAB 4 HYDRAULIC CLEANING TAB 5 EASEMENT CLEARING TAB 6 AERIAL STREAM CROSSING INSPECTIONS TAB 7 COMBINED TOTALS BY FISCAL YEAR TAB 8

3 MANHOLE INSPECTIONS INFLOW/INFILTRATION SECTION3,920 SYSTEM MAINTENANCE 252 TAB 1

4 MANHOLE REPAIRS CONTRACTED (RAISED) 789 GENERAL MAINTENANCE 145 TAB 2

5 TV INSPECTION INFLOW/INFILTRATION SECTION 65,763’ SYSTEM MAINTENANCE 137,559’ TAB 3

6 ROOT CONTROL PHASE 1 237,623’ BROOKHAVEN DR BUCKINGHAM CIR CAMBRIDGE DR CARROLLTON CT CHARRING CROSS COTTONWOOD DR DILLARD DR ENGLAND PL FERN VALLEY RD GETTYSBURG TRAIL HAWKINS STORE RD LEE ANN DR MANHATTAN DR NOTTINGHAM DR PATRICK DR RAMBLING RD ROCKBRIDGE RD SHALLOWFORD RD SUMTER DR VISTAWOOD DR WESTMORELAND DR WOODGATE DR PHASE 2 274,878’ CEDARBROOK DR CHAPMAN DR EDGEWOOD DR FARMBROOK TRL FLOYD DR GUILDHALL TRL HECK ROAD HOLBROOK CT KENSINGTON WAY MAPLE FERRY DR OAK FERRY DR PINE FERRY DR RAIL SPLITTER DR STARMIST CT WOOD FOREST RD TAB 4

7 ROOT CONTROL PHASE 3 99,673’PHASE 4 291,301’ AYRES RDAUSTELL CIR CREEK WOOD LNBLACK GUM CT DRIFTWOOD TRLBUTLER CREEK RD FELTON HILL RDFERN VALLEY DR FONTAINE RDMEADOWVIEW LN HIGHVIEW DRMOON STATION RD HURT RDPAIR RD LAKESHORE DRQUAIL RUN LANDERS DRQUINTO DR MAPLE VALLEY RDROXBORO DR NORTHLAND RDSANDTOWN RD OAK HILLS RDSASANQUA LN PINELAND RDSHADOW RIDGE TRL SHANNON GREEN CIRSHADYSIDE RD VALLEY CREEK RDTIFFANY DR TWILLEY CIR WINDY HILL RD WOOD TRAIL LN WREN WAY YORKSHIRE DR ZELMA ST TAB 4

8 HYDRAULIC CLEANING GENERAL MAINTENANCE 280,456’ (COUNTY WIDE) TAB 5

9 EASEMENT CLEARING Quarterly Total YTD Quarter 1808,275’808,275’ Quarter 2276,344’ 1,084,619’ Quarter 3707,241’ 1,791,860’ Quarter 4795,616’ 2,587,476’ TAB 6

10 AERIAL STREAM CROSSING INSPECTIONS INFLOW/INFILTRATION SECTION 1,211 SYSTEM MAINTENANCE 27 TAB 7

11 Totals by Fiscal Year Linear Feet TAB 8

12 Each Totals by Fiscal Year TAB 8

13 Totals by Fiscal Year Tab 8 Each