GEMINI Re-platforming Project September 2012 GRP External User Changes and Key Messages ahead of seeking approval.

Slides:



Advertisements
Similar presentations
Broker Online Chat Info Kit. Broker Online Chat will be available effective Monday 21 January Operating hours will be: 6am to 4pm WST Monday to.
Advertisements

Gemini Re-platforming Project Update April This presentation is to provide an overview of the Gemini Re-platforming Project (GRP) and provide early.
Jeremy Colburn – Product Manager Technical Briefing – Spring 2015.
 Minimum System Requirements  Updates to Proctor Caching  Updates to Configure TestNav  Setting Up Your Infrastructure  System Check Utility  Resources.
1223 North Glenville Dr. Richardson, TX P: F: The Value-Priced Leader Now Offers Web-Control Confer III.
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Crew Management, Operations Control & Commercial Planning System
Imaging Services, WebNow and ImageNow are provided by MAIS - Document Imaging Services. Presentation originally developed by Michigan Business Services.
University of Michigan Administrative Information Services Upgrade to Citrix Presentation Server 4.0 & Resulting Changes Aaron Landy Michigan Administrative.
Keeping You Connected Through Citrix Access your applications Access your network shares and documents Access your …and do it remotely!
Remote Accessing Your Home Computer Using VNC and a Dynamic DNS Name.
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved. 1 Cryptographic.
Safe Harbors Quarterly Partner’s Meeting August 22, 2013 New Holly Gathering Hall.
VIBRANT MEDIA Online Marketing & Event Administration Solutions 11 March 2009.
1 Browser Compatibility Assessment TAC Presentation May 28, 2015 David Forfia Director, Enterprise Architecture.
DEDS Migration to secured FTP For discussion with GNP Industry.
XA R7.8 Upgrade Process and Technical Overview Ruth Anne Pharr Sr. IT Consultant, CISTECH Inc.
SMART METER TEXAS Status Update July 29, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
Student Financial Assistance. Edconnet SFA to the Internet: EDconnect Software Session 16.
PeopleSoft 9 Upgrade Interface Planning November 2011 Roger Lurie, PS 9 Integration Lead Chris Deaton, Quality Assurance Coordinator.
1 APNIC Open Address Policy Meeting Special Interest Group Session March 2nd, Korea, Seoul.
MyFloridaMarketPlace CRB Meeting
Microsoft Exchange POC Evaluation Results and Recommendations.
Brief Troubleshooting Guide Barbara O’Grady Product Support Specialist Product Readiness Team Dublin - IRELAND.
1 “Data Enquiry Service” Update 5 December 2011 (by )
NON FS CITRIX CLIENT INSTALLATION – ACCESSING ROSS FROM NON AGENCY NETWORK (Utilizing Rental PCs on Non Agency Network) ISSUES: Utilizing ROSS Production.
Portal User Group Meeting June 13, Agenda I. Welcome II. Updates on the following: –Migration Status –New Templates –DB Breakup –Keywords –Streaming.
Current Projects in DTEI Presented By: Tracy Jordan.
Presentation to the Information Services Board March 6, 2008 Bill Kehoe, Chief Information Officer Bill Kehoe, Chief Information Officer.
Annie Griffith January 2008 UK Link Technology Refresh.
HotEx Radius Manager Installation. hotEx RADIUS Manager Network Diagram.
Operating Systems & Information Services CERN IT Department CH-1211 Geneva 23 Switzerland t OIS Update on Windows 7 at CERN & Remote Desktop.
Annie Griffith & Chris Fears September 2007 UK Link Technology Refresh.
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
 Penn Pilot  Microsoft Pilot  General Migrations  Overall Timeline  Getting Started September PennO365: From Pilots to General Migrations AGENDA.
1 Introducing WebNow for Viewing Document Images 2006 User Interchange Dates: Thu Feb 16 1:00 – 2:30 pm Suite 18 Wolverine Tower * Mon Feb 20 8:30 – 10:00.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
1 Browser Compatibility Assessment June 2 nd, 2015.
MassHealth Medicaid Management Information System (MMIS) Provider Online Service Center (POSC) Technical Upgrade January 13, 2016.
Objectives: Upgrade Siebel to a supported application Upgrade Oracle database to current version Deliver all existing user functionality with no degradation.
Retail Market Update August 6, Load Profile Guides In accordance with section § (e) (3) and PUCT Project 25516, Load Profiling and Load Research.
Global Transaction Bank Deutsche Bank Investor Reporting Demo.
Provider Information Request (PIR) Staff Data Collection.
Provider Information Request (PIR). Welcome! Introduction to reporting student and staff data to the department: Getting started 2016 PIR Collection Training.
1 June 2012 COR1000 Telecoms Project UK Link Committee.
SMOOTHWALL FIREWALL By Nitheish Kumarr. INTRODUCTION  Smooth wall Express is a Linux based firewall produced by the Smooth wall Open Source Project Team.
REGISTRATION & ACCESS Frequently Asked Questions March 2016.
AMIGO Assistance for BMC TrueSight Infrastructure Management
Road Manager Module National Heavy Vehicle Regulator
Em4 Ethernet tutorial Remote connection.
MCSA VCE
Gemini Re-platforming Project; External User Participation July 2012
NFX Q-Port on-boarding guide
DTC Spring Kick-Off January 8th 2015.
Department of Licensing HP 3000 Replatforming Project Closeout Report
Road Manager Module National Heavy Vehicle Regulator
The Service Portal What is the Self-Service Web Portal?
Xoserve IX Refresh Customer Update 04/04/2019.
UNC0376S – Increased Choice when applying for NTS Exit Capacity
30 JANUARY 2019 PRIVATE HEALTH ESTABLISHMENTS
The Service Portal What is the Self-Service Web Portal?
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Xoserve IX Refresh Customer Update 05/03/2019.
Xoserve IX Refresh Customer Update 04/04/2019.
Regional WMS Migration Governance Meeting
Presentation transcript:

GEMINI Re-platforming Project September 2012 GRP External User Changes and Key Messages ahead of seeking approval.

Changes & Impacts Legacy Gemini Access Today Legacy and Target Gemini Access Before GRP Readiness Testing and Cutover Gemini Access Post GRP PIS N/ARequired Changes* : Implement Target GEMINI IP addresses Implement Target Citrix/API firewall rules Change Citrix login password API client - use target GEMINI URL Update PC User customisations (shortcuts/batch files/web browser) If required update Citrix client to version 11 Required Changes*: Remove Legacy GEMINI IP addresses Remove Legacy Citrix/API firewall rules Remove Legacy customisations (shortcuts/ batch files) Recommended Changes*: If required update Citrix client to version 13 N/ACitrix Client version 11** required for pre-cutover coexistence and migration to Citrix Xenapp impact assessment for compatibility with non-Gemini systems that use Citrix. Citrix Client version 13** recommended for an enduring supported PC platform - impact assessment for compatibility with non-Gemini systems that use Citrix. IX Citrix Metaframe 4.5 Citrix Client v11 or earlier LEGACY GEMINI External GEMINI User POTENTIAL OTHER NON-GEMIN SERVICES USING CITRIX Citrix Metaframe 4.5 Citrix Client v11 LEGACY GEMINI External GEMINI User POTENTIAL OTHER NON-GEMIN SERVICES USING CITRIX Potential Citrix Use Citrix Client v13 External GEMINI User POTENTIAL OTHER NON-GEMIN SERVICES USING CITRIX Citrix Xenapp 6.5 Citrix Xenapp 6.5 Assess Citrix Client v11 upgrade Impact Assess Citrix Client v13 upgrade Impact IX TARGET GEMINI Changes Impact Analysis External User Gemini Access Configuration Timeframe Further detailed information shall be provided to inform you of the required and recommended changes on Friday 14 th September **Stated versions of Citrix Tested using vanilla PC builds

What are the key messages for your IT Support Function & Business Users? We invite you to share the following key messages internally: Business Users: Testing has identified that there is no application functional or business process change Request your IT Support Function to provide a full impact assessment of required changes Participation during the Readiness Testing (21st January to 1st March 2013) is required to guarantee Gemini access post cutover We need a technical representative from your organisation to be an active participant in UKLC to support you to ensure you are up to date and prepared for cutover The proposed cutover window is estimated to be 12 hrs starting 2am on Sunday 9th June 2013, a back-out plan has been established with an allowance 6 hours has been set. IT Support Function: Complete impact assessment of all required changes for GRP Cutover, paying special attention to Citrix Client Version 11 installed on PCs with existing IT infrastructure and any potential non-Gemini services hosted on Citrix services e.g. MetaFrame, Xenapp Implement required GRP changes for Readiness Testing and Cutover (downloadable from Provide suitable test environment for Readiness Testing that is connected to Legacy & Target Gemini and if required your non-Gemini services hosted on Citrix services The project team can provide support on required changes and testing, however due to the uniqueness of your IT systems and infrastructure configuration, only limited support can be provided on how the changes can be implemented.

THANK YOU In the event that you need assistance with the required GRP changes or have any questions then please contact the GRP Project Team via: or /