TG7 Issues on RP 13D Rheology and Hydraulics Mario Zamora Exploration & Production Standards Conference API Subcommittee 13 June 27 – July 1, 2011.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

Describing Process Specifications and Structured Decisions Systems Analysis and Design, 7e Kendall & Kendall 9 © 2008 Pearson Prentice Hall.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
TIA Engineering Manual 6 th Edition Preview and Overview.
PETE 203 DRILLING ENGINEERING
Wellbore Design - A Safety Critical Process Human and Software Factors.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt October, 2009.
OASIS PKI Action Plan – Overcoming Obstacles to PKI Deployment and Usage Steve Hanna, Co-Chair, OASIS PKI Technical Committee.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
Creating Research proposal. What is a Marketing or Business Research Proposal? “A plan that offers ideas for conducting research”. “A marketing research.
Auditor Responsibilities January 16, 2014 State Training Webinar 2014 CSP Contract Compliance Audit 1 AD14002.
TC176/IAF ISO 9001:2000 Auditing Practices Group.
Development of WIPOSTAD Progress report by the International Bureau Committee on WIPO Standards Geneva May Anna Graschenkova Industrial Property.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
ISO 9001:2015 Revision overview - General users
Implementation workshop VCE Environmental Science 2013−2016 August 2012.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 May 7, 2015.
Introduction to Software Quality Assurance (SQA)
IEEE MEDIA INDEPENDENT HANDOVER DCN: REVP m-session-62-closing-report Title: m Session #62 Closing Report Date Submitted:
Profile and a quick introduction Software Engineering: ) هندسة البرمجيات (in Arabic: is the branch of computer science Designed to develop a set rules.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
Press the F5 key to continue Project Manager is a web based Project Management Tool. All your work is done and information stored on the internet cloud.
TG2: Publications SC13 – Report on Work Groups and Publications Sheraton Chicago Hotel & Towers Chicago, Illinois June 19, 2014.
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
© 2001 Business & Information Systems 2/e1 Chapter 8 Personal Productivity and Problem Solving.
Lead Black Slide Powered by DeSiaMore1. 2 Chapter 8 Personal Productivity and Problem Solving.
ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 9 Gasified Liquid Hydraulics Read: UDM Chapter 2.7 pages
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
MUD LOGGING DEFINITION, THEORY & LAG CALCULATIONS
INFO 424 Team Project Practicum Week 2 - Launch report, Project tracking, Review report Glenn Booker Notes largely from Prof. Hislop.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
Copyright 2010, The World Bank Group. All Rights Reserved. Testing and Documentation Part II.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July 2015 The OASIS Feedback Process Empowering Communication.
IEEE MEDIA INDEPENDENT HANDOVER DCN: REVP m-session-63-closing-report Title: m Session #63 Closing Report Date Submitted:
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Doc.: IEEE /0074r2 Submission May 2010 Tuncer Baykas, NICTSlide TG1 Introduction and Status Notice: This document has been prepared to.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt October, 2009.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am.
UPDATE ON HARMONISATION ACTION PLAN FOR THE SOCIAL PROTECTION SECTOR Coordinating Board for Foreign Assistance in Labour and Social Protection 10 June.
Page © ASME 2015 Module B – Process B4.Initiating and Terminating Standards Projects Standards and Certification Training.
Copyright 2010, The World Bank Group. All Rights Reserved. Recommended Tabulations and Dissemination Section B.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Hyatt Regency – San Francisco 29 Jun 2011 – 8:00 am.
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
Minutes Document March 2006 Terry Cole, AMDSlide Editor’s Best Practices Terry Cole, AMD WG Technical Editor & Simon Barber, Devicescape.
TC176/IAF ISO 9001:2000 Auditing Practices Group.
Lead from the front Texas Nodal 1 Registration Market Call Nov 21, 2008.
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Editor’s Guideline Version 1.0
IEEE Standard Roll-up Report
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
Standards and Certification Training
API RP 17A - Discussion Points
2016 Exploration & Production Standards Conference Subcommittee 10
Specification on float equipment
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
CEOS Organizational Matters
Presentation transcript:

TG7 Issues on RP 13D Rheology and Hydraulics Mario Zamora Exploration & Production Standards Conference API Subcommittee 13 June 27 – July 1, 2011

API RP 13D – TG7 Original Charge : Update and modernise API RP13D Bulletin Rheology and Hydraulics of Oil-well Drilling Fluids Intent : Allow users to use spreadsheets to calculate ECD, pressure losses, hydraulic parameters, hole cleaning, surge/swab, optimized hydraulics, and perform rigsite monitoring. Last Major Revision: 5 th Edition, June 2006 Most Recent Publication : 6 th Edition, May 2010

Last TG7 Status Summary – January 2010 API RP13D (5 th Edition) published June 2006 NWI submitted to API for editorial corrections Editorial changes and corrections completed Equations corrected Table references updated Duplicated table numbering corrected General typos corrected Document approved by TG7 Members & SC13 Final version completed (January 2010) WG requests approval to go into hibernation

Current Status - Executive Summary Equation and typographical errors in the 2010 edition of RP13D reported in late Ad hoc group of 5 “experts” reviewed document for technical and editorial errors (details with SC 13 Chair) SC13 chair coordinated 42-repondent Zoomerang survey (details with SC 13 Chair) Recommendations 1. Complete technical/editorial corrections and republish 2. Convene a review group to consider major updates 3. Reactivate TG7 Focus on how the document might be used Recommend Richard Meehan (SLB) as chair Consider virtual committee help 4

Recommended Focus on Document Use Rheologists - study & explain Chemists - formulate & commercialize Modelers - measure & relate Software developers - compile & disseminate Engineers - plan & optimize Wellsite Personnel - apply & adapt 5

Sample of Current Document Tech Review 6

Highlights of Current Document Tech Review Errors found in over two dozen equations, primarily related to units, general typos and inconsistencies with symbols table. Needs critical review for consistency among the different sections. Variables used in the text and equations should be consistent with how they are defined in the symbols list. Rheology is a science. In several places the term should be changed to rheological property or viscosity. Not all the units in the SI-unit column are SI-units. Shear rate should be denoted by “gamma-dot”, not “gamma”. Effects of drill string rotation are not properly described. Multiple issues with temperature profiles – unable to reproduce calculation in appendix. Need PVT data on more base oils. 7

Highlights of Zoomerang Survey Results 1. Include topics of interest to rheologists/academia – 48/52% 2. Primarily Excel, advanced, calculator – 59/32/9% 3. Read/not used, used, neither read or used – 48/33/19% 4. Revise or fix errors – 68/32% 5. Include derivations yes or no – 45/55% 6. USC units, SI, metric – 70/20/9% 7. Participate in TG7 yes or no– 69/31% 8

Highlights of Zoomerang Survey Items to Add Effect of rotation on pressure loss. Models of structure build-up and breakdown. Add cuttings slip velocity, ECD prediction, ROP optimization, cutting annulus load, CCI. Compressibility of oil and effect on mud weight. How it affects the elastic modulus (G ') hydraulics during the transport of cuttings, and the maximum concentration of solids in the system. Can make the system use a spreadsheet to calculate hydraulics but also must have a way to do it by hand. Document needs to be accurate. Fix all errors, reissue, and upgrade with new and better methods. Write as industry RP - not too complex, but completely useful for the desk engineer or rig supervisor. Not sure about spreadsheet format - let committee decide on best format. 9

Highlights of Zoomerang Survey Charge / Scope Minor revision of 13D only to include new topics and make the applications more widely used by industry. Scope should be for the use of wellsite and office engineers, but involvement of academics and rheologists should be considered to expand and ensure current, most relevant techniques are offered. Purpose of TG7 is to review the latest version RP-13D to determine if there are sufficient technical changes to warrant major revision of the document. The task would be to “render the document suitable for engineering calculations, make equations and units consistent throughout”. Review RP13D to correct typographical errors and incorrect information, and include updated drilling fluids rheological information and calculations. Make for rig site & office engineers. “Rheologists” could make their own more technical RP if desired. 10

Current Status - Executive Summary Equation and typographical errors in the 2010 edition of RP13D reported in late Ad hoc group of 5 “experts” reviewed document for technical and editorial errors (details with SC 13 Chair) SC13 chair coordinated 42-repondent Zoomerang survey (details with SC 13 Chair) Recommendations 1. Complete technical/editorial corrections and republish 2. Convene a review group to consider major updates 3. Reactivate TG7 focus on how the document might be used Richard Meehan (SLB) as chair consider virtual committee help 11