The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
Trigger Tests Patrick Robbe, LAL Orsay, 8 Feb 2012.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
Beam Diagnostic Tools David Christian Fermilab May 17, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Monitoring system commissioning
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Regional Cal. Trigger Milestone: Production & Testing Complete
University of California Los Angeles
J. Rutherfoord & P. Schacht 17 May 2004
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013

MINERvA Shifts Running weekday day shifts for about 5 – 8 hours –All FEBs (front end boards) operating –Run PEDs and Light Injection (LI) to determine if there has been any change in the detector. The FEBs & PMTs appear fine. –We used the shifts to help solve a problem we had with what appeared to be one of the VME modules. –This problem was presented at the last AEM meeting Will run 24 hour shifts when start we get NuMI beam –However, we cancel non day shift if there is no NuMI beam. 2

Intermittent DAQ problem The DAQ stopped running PEDs after ~ 4 hours from reading out a CROC, CROC reads out FEBs. Problem seemed to be CRIM 1 of the 2 CRIMs in 2d crate. –The CRIMs send the timing & trigger signals to the CROCs The problem did not to occur with LI runs –The clue to solve the problem –LI runs the DAQ triggers CRIM 1 in Crate 0 and it sends triggers (beam gate) to the other 3 CRIMs –For PED runs DAQ triggers all the CRIMs. But CRIM 1 Crate 0 sends its trigger to the other 3 CRIMS –Multiple triggers in Crate 1 and this caused the errors. Modified the DAQ so that PED runs looks like LI runs. This fixed the problem. 3

CROC-E Upgrade DAQ upgrade needed for us to take data with MI Cycle Rate of 0.75 Hz, The CROC-E upgrade. –New CROC-Es handle many of the tasks automatically which were handled by the DAQ computer Last week the old CROCs were replaced by the CROC-E boards. –All 15 CROC-Es seem to work, but more tests needed The CROC-Es can be addressed Information can be passed back and forth between the FEBs and the computers –Still need to check the data –Run Control will need to be modified to enable the non- experts to run the DAQ. 4

New DAQ Computers Will be replacing 3 DAQ computers with 4 DAQ computers. –Right now, we are reading out the CROC-E with the old DAQ computers We can take data with the old DAQ computers –The plan: need to check that 1 new computer can take over the task of the 3 existing computers –1 st install 2 computers in DAQ rack, later 2 in VETO rack –DAQ rack installation should happen this week. The MINERvA test stand at D0 will verify the software of the computers and ensure they can read out the VME crates. We have prepared the DAQ rack to accept 2 computers quickly –Done during the CROC-E replacement 5

Muon Monitor 4, MM 4 The on-off valve for the gas line to MM 4 will be installed tomorrow morning. –It will be Installed on input line just upstream of the DAQ-gas racks –Then He flow can be started to hadron monitor, MM 1,2,&3. –When gas system comes for MM 4, gas to MM 4 can be turned on without affecting MM 1, 2, & 3. This work can be done in access tunnel. DAQ rack and Gas Rack will be installed in place tomorrow 6

MM 4 Signal cables, MM 4 to SWIC scanner in DAQ rack. –In an attempt to save money a old RG174 cable bundle was to be used –3 bundles needed, 81 cells – Connectors were installed on both ends –Shorts were found randomly throughout the cable bundles –Center conductor punches through center insulator and touches the ground braid at random places. –Hence, this cable bundle will not be used Now, bundles being made from stock room RG174 spools. 1 of the 3 need bundles finished by tomorrow The other 2 bundles by early next week. Beam must be off to install the signal cables. 7