ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 1 Monthly Status Report Report due 1/25/01 Schedule statused.

Slides:



Advertisements
Similar presentations
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
1. Common Optics Assembly (COA) Main optics housing riveted on channel housing (with rod) QM delivered
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
Project phases and the life cycle
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
Release & Deployment ITIL Version 3
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
IT 499 Bachelor Capstone Week 9.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
From Research Prototype to Production
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
ASPERA-3 July 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_25/ Page 1 Monthly Status Report Report due 7/25/00 Schedule statused.
GLAST Large Area Telescope:
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
ASPERA-3 July 31, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_31/ Page 1 Monthly Status Report Report due 7/25/01 Schedule statused.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
AGATA Pre-processing team report AGATA Week, July 2008.
Executive Steering Committee Presentation
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
ASPERA-3 June 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 6_25/ Page 1 Monthly Status Report Report due 6/25/00 Schedule statused.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
ASPERA-3 June 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 6_25/ Page 1 Monthly Status Report Report due 6/25/01 Schedule statused.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
ASPERA-3 May 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 5_25/ Page 1 Monthly Status Report Report due 5/25/01 Schedule statused as.
Recommended Draft Policy ARIN Remove Web Hosting Policy.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
1 MIRI Hardware (from Oct-Dec NPM reports)‏ Fred Lahuis (NPM input from Rieks Jager)‏ SRON MIRI NL Meeting Leiden, 6 th January 2010.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Monthly Status Review Wednesday, January 18, 2012 LPW/EUV Jim Westfall PM & Will Thompson SE Laboratory for Atmospheric and Space Physics University of.
1 PDS MC Requirements Process March 29, 2007 (v2).
The U.S.S.E Team #4 Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera Status Report #1 January 26 th, 2009 Description: A follower robot that will.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
#WEEK 3: RELIABILITY-TEST DOCUMENTATION AND OTHER ITEMS NEEDED FOR RELIABILITY TESTING 2 August 2006.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
Atlas Polar CDR meeting March 2 & 3, 2016 DAY 2. Review Latest CAD Sample screenshots from Feb 12 CAD.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Project Execution Methodology
Bill Raynor Naval Research Lab
7th Belle II VXD Workshop, Prague
0.0 Instrument Suite Name Presenter’s name
Internet Access Control Project Status
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Amendment Invoice Task Force Progress Report
Lockheed Martin Canada’s SMB Mentoring Program
Status of CO2 Cooling tests at CERN for Pixel phase 1
Amendment Invoice Task Force Progress Report
Transfer to Operations
NEMSIS V3.5.0 Timeline developed at NEMSIS Annual Meeting 2017
Presentation transcript:

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 1 Monthly Status Report Report due 1/25/01 Schedule statused as of Dec. 22, 2000

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 2 Project Status Summary Technical Nov Dec Jan Detailed Description: (for items identified as yellow or red) Programmatic Nov Dec Jan Schedule Nov Dec Jan Resources Nov Dec Jan The blackening of the ELS flight parts by MSSL / Walton Plating is complete. The parts are being hand carried back to SwRI on 1/24/01 for vacuum bakeout and then final assembly. The blackening looks good. We completed testing of the Calibration System and process at MSSL with the ELS prototype. We (SwRI, IRF & MSSL) are now ready for the flight ELS calibration at MSSL. We successfully delivered the IMA detector flight and flight spare subassemblies to IRF. Submittal of the DD250 for government acceptance of the hardware is the only remaining IMA hardware task. Latest project photos and videos are available on Aspera-3 web site.photosvideos

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 3 Problem and Concern Summary P=Problem C=Concern R=Resolved

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 4 Accomplishments of the Last Month -ELS Temporarily assembled the flight unit with the precision pieces for a “quick” aliveness test prior to delivering the parts to MSSL for blackening. Successfully performed aliveness test At SwRI, completed troubleshooting the ELS prototype and the MSSL calibration setup. Hand delivered the ELS prototype, the MSSL cal setup, and the parts to be blackened to MSSL. Supported Prototype Calibration at MSSL with IRF. The Calibration system and procedures are now in place and ready for the flight calibration. MSSL / Walton Plating completed blackening of the flight housing, inner deflection plate and tophat. Both the housing and the inner deflection plate (the high precision parts) look very good. The “flight” tophat plate has some very slight blemishes in the blackening. The parts are to be hand carried back to SwRI to arrive 1/24/01. All three parts will then be vacuum baked out. It was decided to remove the tophat off of the currently assembled flight spare and following vacuum bakeout of the flight parts on 1/29/01, an inspection of both the flight and flight spare tophat would be made. The part with the better blackening will then be used for flight. The other will be reassembled to the flight spare.

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 5 Accomplishments of the Last Month - IMA The IMA flight and flight spare detector subassemblies were successfully delivered to and received by IRF on 1/10/01. ASPERA-3 personnel were trained in how to assemble the units with MCPs and how to run a functional test on the IMA subassemblies. A draft of the DD250 for the delivery of the IMA hardware has been submitted to the NMO for their concurrence / approval. This is the final IMA hardware activity.

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 6 Accomplishments of the Last Month - Data Reduction Software Worked on APAF Software Requirements Specification (SRS) –APAF Software Requirements Review is now set to be held at the next ASPERA-3 Team Meeting in Kiruna, Sweden (March 6-7, 2001) Continued Packet Definitions for ELS Continued Providing Technical Assistance for EPO Web Information Continued Defining and Implementing IDFS Web Tools Held monthly ASPERA-3 Software Status Meeting (January 23, 2001)

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 7 Planned Activities for the Next Month - ELS Bakeout flight blackened parts. Inspect and choose which tophat is for the flight unit and which is for the flight spare. Assemble the flight unit and reassemble the flight spare. Perform environmental test on the ELS flight unit (vibration and thermal vac). Perform characterization testing of the ELS flight unit. Perform characterization testing of the ELS flight spare.

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 8 Planned Activities for the Next Month - IMA Complete the DD250 for IMA receipt and acceptance.

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 9 Planned Activities for the Next Month - Data Reduction Software Tasks Release Draft APAF Software Requirements Specification (SRS) Continue Packet Definitions for ELS Continue Providing Technical Assistance for EPO Web Information Continue Defining and Implementing IDFS Web Tools Provide Software Support for ELS/IMA Characterization as Needed

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 10 Problem and Concern Status None at this time.

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 11 Schedule Summary ELS: We are still on track with the ELS schedule first discussed with the NMO on 12/07/00. We still have 5 days contingency in the schedule for shipping the ELS flight unit to MSSL for calibration on Feb. 27. (Actual current plan is to hand carry the flight unit to MSSL 3/4/01 en route to the next ASPERA-3 team meeting to be held 3/6-3/7 in Kiruna, SE. This provides an additional 4 days contingency). Software: Some software activities have been delayed due to hardware activities. The overall delivery of the software to support mission operations however continues to be on schedule. The full-up schedule is available on the ASPERA-3 Web site.schedule

ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 12 ASPERA-3 PHASE B/C/D MASTER SCHEDULE