Presentation By R.M.Johri Principal Director ( InformationSystems) O/O CAG of India.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

Making the System Operational
Oracle Rally Applications Modernization. 4 June About the Company Founded in 2002 Unites high-level information technology and organization architecture.
Web Trnsport Implementation TEA/TUG October 1-9, 2008 Saratoga Springs, NY.
Slide 1 Shall Lists. Slide 2 Shall List Statement Categories  Functional Requirements  Non-Functional Requirements.
Client/Server Computing Ajay Kumar Shrivastava. Network Operating System (NOS) It manages the services of the server It exists at the session and presentation.
Crew Management, Operations Control & Commercial Planning System
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
GENERATION OF CPSMS REPORT FROM VLC DATABASE
COMPANY CONFIDENTIAL COPYRIGHT 2004 MASSTECH GROUP INC. KCTS Case Study,
CrackingSiebel.com Utility Siebel Repository Extract (SRE) Tool.
In-Place Upgrade to TFS 2010 on existing hardware Not deploying new hardware Databases too large to move Scaling-out, not up Not deploying new hardware.
REVIEW AND QUALITY CONTROL
November 2009 Network Disaster Recovery October 2014.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
School Technology Solutions, LLC Technology Audits What's in it for you? 4 th Annual SW/WC Technology Conference March 11, 2010 Presenter: Lee Whitcraft.
Commercial Database Applications Testing. Test Plan Testing Strategy Testing Planning Testing Design (covered in other modules) Unit Testing (covered.
PO Box 1508, Vancouver, WA (360) THE COMMERCIAL & INDUSTRIAL BILLING SOLUTION.
Module CC3002 Post Implementation Issues Lecture for Week 6 AY 2013 Spring.
CALIFORNIA DEPARTMENT OF WATER RESOURCES GEOSPATIAL TECHNICAL SUPPORT MODULE 2 ARCHITECTURE OVERVIEW AND DATA PROMOTION FEBRUARY 20, 2013.
COMP-14: Automating your deployments using ANT Gary S Clink Business Consultant.
蓄勢待發迎WebSAMS Preparation Forum for WebSAMS Implementation Document 12
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
Archiving of Electronic Records Inta Feldmane Directorate General of Latvia State Archives.

District and Subordinate Courts Application Software Standardization.
Geospatial Technical Support Module 2 California Department of Water Resources Geospatial Technical Support Module 2 Architecture overview and Data Promotion.
Access Across Time: How the NAA Preserves Digital Records Andrew Wilson Assistant Director, Preservation.
Atkins New PSR Reporting Solution Using Actuate e.Spreadsheet October 2007.
The Handover Process P6.
Center for Planning and Information Technology T HE C ATHOLIC U NIVERSITY of A MERICA Preparing and Planning your Portal Implementation June 2007.
CSI-MAXIMUS, Inc CSI Comprehensive Service & Support Implementing the CSI Way.
Making The Most of Your Financial Aid System Anna Kelly Director of Financial Aid New England Institute of Technology Russ Romandini Senior Systems Analyst.
Institutional Repositories for Open Access: the Ghanaian experience Abednego Corletey Systems Analyst/Librarian.
E.Soundararajan R.Baskaran & M.Sai Baba Indira Gandhi Centre for Atomic Research, Kalpakkam.
Reviewing the Eight-Step SWIS Process Florida’s Positive Behavior Support Project University of South Florida.
WGISS /09/2015 DATA PRESERVATION – CNES APPROACH B. Chausserie-Laprée.
Implementing SiteManager in a non-P/L/C State Dawn E. Scheel, P.E. TxDOT.
RCRAInfo May 6, RCRAInfo: What is it? The national (mission critical) information system that supports the RCRA Subtitle C program. A national.
Common Deficiencies in Voucher Level Computerisation.
TrainingRegister® Training Management Software Maintain Permanent Training Records for Each Individual Monitor and Track Required Training Know Who Needs.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
Information System ‘Treasury-Client’ 2015 Treasury Committee, Ministry of Finance of the Republic of Kazakhstan.
MINISTRY OF FINANCE OF THE REPUBLIC OF TAJIKISTAN.
OCLC ILLiad hosted service March 18 th, 2010 The who, what, why, when and how of ILLiad hosting.
ECpE Student Database Team 21 Adviser: Tien Nguyen ECpE and Tony Moore.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
Learning Outcomes 1. Know software installation processes 2. Be able to prepare for software installation 3. Be able to install and configure software.
The information systems lifecycle Far more boring than you ever dreamed possible!
Office of Administration Enterprise Server Farm September 2008 Briefing.
1 Computer Assisted Audit Tools National Audit Office of Lithuanian accepts the challenge Meeting of representatives of Baltic, Nordic and Polish SAIs.
Interaction with Vendors that Support the PFMS: Experience of Kazakhstan Treasury Committee of the Ministry of Finance of the Republic of Kazakhstan, 2016.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
Job offer IT System & Software Specialist We are currently looking for an IT database administrator in order to respond to one key-account customer demand.
This courseware is copyrighted © 2016 gtslearning. No part of this courseware or any training material supplied by gtslearning International Limited to.
Accounting systems design & evaluation 9434SB 18 March 2002.
Albanian Government Financial Information System (AGFIS) AGFIS is the system, through which the Government of Albania performs the entire budget execution.
9 Copyright © 2004, Oracle. All rights reserved. Getting Started with Oracle Migration Workbench.
7/6/2016LCBE/gcm Department of Exceptional Children School Year Information Leslie County Schools.
Microsoft dynamics Axapta training institute Contact US: Magnific training
Presenter: Igna Visser Date: Wednesday, 18 March 2015
SAP Overview.
ONUR AIR QUALITY DIRECTORATE
Installation Plan Checklist
Release Management Release Management.
Relate to Clients on a business level
UNITED STATE AGENCY FOR INTERNATIONAL DEVELOPMENT
Archiving of Electronic Records
Vygandas Norkus Deputy Director General October 2009, IT DG
HOME AFFAIRS IDENTIFICATION SYSTEM (hanis)
Presentation transcript:

Presentation By R.M.Johri Principal Director ( InformationSystems) O/O CAG of India

Background VLC up gradation was envisaged as a result of the recommendations of AGs conference A committee was formed to examine the issue in its totality and give recommendations. These recommendations were approved by CAG in March 2010 and the project was assigned to IS wing for implementation.

Recommendations of committee The application system shall remain the same and we shall limit ONLY to the up gradation of platform from Oracle 8i to 11G. We shall move from a 2 tier architecture to a 3 tier architecture. It shall be done urgently as there is a possibility of disruption as oracle 8i is not supported anymore and the present operating system is not compatible with new servers.

Present Situation The VLC system ( including GPF Module) runs on a Oracle 8i platform. The operating system prevalent at the moment is SCO unixware version to Oracle does not provide technical support for the 8i version and hence we do not have any technical support agreement in place.

Steps taken A test site has been created at all the sites ( 26 states and 39 locations ) completely independent of the existing system to ensure no disruption to present working. All servers have been installed and operating system loaded. Oracle 11 G licenses have been bought and supplied to all the offices.

Steps taken An open tender was invited to award the work of migration from Oracle 8i to Oracle 11g platform. The open tender has been finalised and the work has been awarded to M/s CMC ltd and M/s Access Infotech ltd. The work of migration has to take place in 5 stages and is likely to be complete in 16 weeks where only VLC work is there and 24 weeks where both VLC and GPF is to be done.

Stages of Implementation Stage 1 ( 3-4 days) – Preparatory actions – It will involve - Installation of server, its configuration, loading of operating system and loading of Oracle 11 G licenses. Preparation of list of hardware required for testing of migration. Taking a copy of source code and back up of all database forms and reports for migration.

Stages of Implementation Stage 2 ( 6 to 8 weeks) – It would involve migration of Oracle database, forms and reports from the 8i to 11 g platform. It can be done offsite or onsite. Stage 3 ( 4-6 weeks ) – It would involve patitioning of server keeping the 3 tier architecture in mind, loading of migrated database, forms and reports, generation of reports and records, automated and manual checking, training, documentation and acceptance testing

Stages of Implementation Stage 4 ( 4-6 weeks) - It would involve complete migration to the new platform, complete backup of database, data entry in the upgraded system, transmission of data from branches to HO where ever required, generation of one month’s accounts. Stage 5 ( 2-4 weeks) – It would involve performance of accounting procedures by our staff under the guidance of service provider for finalisation of annual accounts and annual closing of GPF.

Issues / Challenges Non availability of source code. Multiplicity of backend and front end softwares /data. Accounts for the year shall be complete in all respects as this forms the base year for migration. Archival policy. Close supervision by Core Group during Stage 3 and Stage 4 as complete manual testing is involved and input has to be done on 2 systems. Freezing of change management.

Thank you