Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Module Production T. Bowcock. News Since Last Meeting Engineering Design Review (20-21 st April) –Mechanics including module and fixtures –Components.
Production Summary Tony Smith (Production Coordinator)
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
VELO T. Bowcock1 Si Status T.Bowcock for S. Biagi, G.Casse, P. Cooke, M. McCubbin, A. Muir, J. Palacios, C. Parkes, U. Parzefal, G. Patel, J. Phillips.
LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
VELO Status at Liverpool T. Bowcock. Prototype Module(1) Mechanical Design Several different options Reduce complexity Dead reckoning.
26 June 2001VELO-Overview VELO Overview T. Bowcock University of Liverpool.
SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 JD.Berst, U. Goerlach, CMS TRK APR 2003 Status of Hybrid Qualification and Tender Final Technical Specifications –Hybrid types –Quality control, intermediate.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Update on new alignment kit update 20/3/ Complete table based on a standard table (2400 x 1200 x 150) and a half table (2400 x 600 x 150).
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
L0 Module Testing and Analog Cable What we built so far: –No.3 First prototype with SVX4 (L1 hybrid) –No.4 with irradiated sensor –No.5 Installed on the.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Dec
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
QCG Report Francesco Forti University and INFN, Pisa.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
LHCb PRR - Girish D. Patel1 QC and Process Control G. D. Patel.
BM&N STS ladders assembly in VLHEP
Developing Radiation Hard Silicon for the Vertex Locator
T. Bowcock University of Liverpool
FCAL R&D towards a prototype of very compact calorimeter
Equipment for Assembly – UK Experiences
Studies of Quad Pixel Module assembly using paper laminate
Results from module testing
Silicon pixel detectors and electronics for hybrid photon detectors
US Module Testing Progress Report
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Presentation transcript:

Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock

Development Sensor Hybrid Mechanics Assembly Quality Control Project Timescale

Sensor Pre-Production Sensor(s) Design (PR-04) Submission Quality Control on PR-03 Failure of most recent batch (2 nd metal Layer on Rs) New delivery Sept 25 th (12 sensors) Design feature prototype to be delivered Oct 03. CNM

Kapton: Design K-03 Under test (4 Beetle 1.2) Noise compatible with testbeam (2adc) Baseline shift still large(120adc) Now bonded 8 Beetle 1.2 All chips working Fanins bonded Remainder equipped with Beetle 1.3 Minor revisions necessary Artisinale lamination K-04 Ready for submission (ex-fanouts)

Kapton: K-03/K-04 Need to understand possible delamination problems (not seen in K-03) Thermal cycling Bonding and production process Radiation test in Llubljana Fanouts Custom for PR-04 Price is HIGH in kapton (~100kChF)

Mechanics Simpler thermal interface options Cam solution integrated onto surface Aluminium prototype being tested Cam-less slide with thermal UHV grease Substrate under test Delamination during processing Lamination process awaiting K-04 production New location pins for base

Assembly: System Commissioned Granite plate and Gantry Vibration Free Table Slides (1 micron precision) Rotating plates Frame grabber and optics Software from Manchester University Assembly Jigs Under Design review Sony Glue Robot commisioned

Assembly: Bonding Jig K-03 has been partially bonded single sided 3 rd iteration of bonding jig Double sided bonded jig is an extension of the last iteration Critical step: require final K-04 on substrate to prove bonding is possible

Assembly: Handling Jigs Handling Jigs need to be designed Assembly Storage Transport Insertion Extraction

Quality Control Asked by TB to provide details of QC procedures For sensor approval this will be defined in our contract with Micron Retesting at Liverpool Detector measurements Kapton and Fanouts Tested by manufacturer (no retesting) Assembly and bonding Must await final design to define the QC procedure Integration with automation

Quality Control Modules Tested electrically and thermally (in vacuum) Burn in Surveyed Cables Tested on a rig Database SQL database with Web interface produced Testing the database Oct

Timescales: sensors

Timescales: Modules

Timescales: milestones Delay on sensor production Use up some slack 1-2 months Safety on contract and definition of good