LHCb Velo Electronics PRR

Slides:



Advertisements
Similar presentations
High Density Mezzanine Connector System (1.00mm)
Advertisements

Orthogonal Projection
Module Production T. Bowcock. News Since Last Meeting Engineering Design Review (20-21 st April) –Mechanics including module and fixtures –Components.
Tony Smith LHCb Velo EDR Liverpool 20-21/04/05 1 HYBRIDS EDR LIVERPOOL APRIL 05 Tony Smith.
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Micron detector testing in Liverpool G. Casse – O. Lodge Laboratory, University of Liverpool.
LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
LHCb Velo Construction Authorisation steps Tony Smith.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
What determines impedance ?
EELE 461/561 – Digital System Design
Manufacturing Processes for a 4 Layer Multi-layer PCB Section through PCB Via hole SMD Pad The following presentation covers the main processes during.
SPACE PRODUCT ASSURANCE
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Melting Probe IWF-EXP/ÖAW GRAZ Size: 40 x 40 x 195 mm Mass w/o electronics Calculated: 450g Measured: 350g, 3m tether Main Components Cable.
1 © 2009 ProtoPrint S Manual Fine-Pitch Stencil Printer Step-By-Step USER GUIDE.
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Marco Bregant Vertex05 - Nikko, November 2005 Dipartimento di Fisica Universit à di Trieste & Istituto Nazionale di Fisica Nucleare (INFN) - Trieste ALICE.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Printed Circuit Board Design
Tony Smith LHCb Velo EDR Liverpool 20-21/04/05 1 HYBRIDS- construction CONSTRUCTION of composite SUBSTRATE - many lay-ups tried – best flatness obtained.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.

STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
The printed circuit board (PCB) design
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Hybrid Integrated Circuit
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Low Mass Rui de Oliveira (CERN) July
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
ADVANCED HIGH DENSITY INTERCONNECT MATERIALS AND TECHNIQUES DIVYA CHALLA.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
LHCb PRR - Girish D. Patel1 QC and Process Control G. D. Patel.
The STS-module-assembly:
Development of T3Maps adapter boards
T. Bowcock University of Liverpool
Quality Control Chamber Production
ob-fpc: Flexible printed circuits for the alice tracker
HB RM prototypes Ianos Schmidt Aug 17, 2017.
Presentation transcript:

LHCb Velo Electronics PRR Front End Hybrids and short cables Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

Scope of this presentation Detailed construction and mechanical aspects of the front end hybrids are covered by the module review and therefore this presentation contains only a small amount of detail to outline the steps of the construction and testing. Detailed information of the assembly and testing can be found at http://hep.ph.liv.ac.uk/lhcb/Hardware/Production/production.html Schematics, layouts and production files can be found in EDMS Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

HYBRIDS- construction SUBSTRATES CONSTRUCTION of composite SUBSTRATE TPG central core 400um woven layer of CF prepreg each side oriented +-45 degrees 125um nominal woven layer of CF prepreg each side oriented 0,90 degrees 125um nominal Laminated in vacuum bag at Liverpool Total thickness ~900um Frame of Carbon Fibre 3mm wide around edges to prevent delamination CF and TPG outlines shown in RED – the substrate is routed from the kit of these parts to the substrate profile shown in GREEN – the circuit is shown in BLUE Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

HYBRIDS-construction CIRCUITS Four copper layers with Kapton dielectrics bonded with 50um Espanex (modified polyimide) bondply – essentially a standard multilayer flexi circuit. DESIGN RULES - not very tight for the technology  good yield 100um track and gap 300um vias - 500um lands no buried vias Layer material pressed copper thickness thickness top bottom solder resist 30 copper foil 05+carrier 5um 5um ------- SPB-050A Bond Ply 50um (was 35) -- -- 2/3 SB1250 Cop/Clad flexi 60um 12um 12um 12/50/12 (Adhesiveless) (power) SPB-050A Bond Ply 50um (was 35) -- -- 4 copper foil 05+carrier 5um -- 5um total 200um (ground) NB – plating thickness of ~8um Cu is added to top and bottom + few um Ni/Au on top Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

HYBRIDS- construction CIRCUITS layout Component and trace layout Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

HYBRIDS-construction Lamination to form a HYBRID Two CIRCUITS are now bonded back to back on the SUBSTRATES using the corner holes for alignment. The cut-outs in the corners allow for the differential expansion of the jig relative to the circuit and avoid stressing of the substrate when heated. Bonded using 50um bond Ply as in the circuit construction Total thickness = 900um (substrate) + 2* 50um (bondply) + 2*200um(circuits) = 1.4mm Circuits are manufactured at Stevenage Circuits Limited UK. The circuits undergo two standard tests using flying probes for open and short circuits before and after plating and only parts which are 100% good are charged for. After lamination a further flying probe test is done, however because of some non linear distortion introduced in the lamination process it is not possible to probe the bond pad fingers. Instead, only the surface mount pads and vias are used as these are large enough to be probed. This is likely to catch the vast majority of induced shorts (one found so far in 24 circuits (12 hybrid assemblies) Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

Tony Smith LHCb Velo Electronics PRR CERN 16/01/06 HYBRIDS Population Tests on early prototypes showed that reflow soldering would produce distortions as the whole hybrid would be heated beyond the glass transition temperature of the adhesives without the hybrid being supported. It was therefore decided to Hand solder the components at Hawk Electronics UK. Bond areas are masked to prevent solder splashes and damage. Hybrids are tested for short circuits after population, they are visually inspected and any problems rectified. They are then cleaned with prozone defluxer and DI water prior to die and Pitch adapter attachment. Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

Tony Smith LHCb Velo Electronics PRR CERN 16/01/06 Hybrid – post population testing Hybrids can be tested visually and quickly for shorts using a known good cable. Each pin on the connectors has an individual LED so probing any one pin on the contacts should light only one led of any pair. Shorts are quickly found by running the probe along the pads. This does not test for open circuits but the most likely failure mode at this point is shorts from soldering. Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

HYBRIDS-construction Pitch Adapters Pitch Adapter designs for Phi and R All locations are different, drawn in sets of 8 FINE LINE 20um T&G 8 phi and R sets tested and available Can test faster than module production rate Half of required PAs delivered Only 100% good parts pass Failure rate from cap tests 11% Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

HYBRIDS-construction Pitch Adapter attachment Four sets of pitch adapters glued to the substrate. Glue is precisely dispensed and weights are applied during cure Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

Tony Smith LHCb Velo Electronics PRR CERN 16/01/06 HYBRIDS HT ISOLATION TEST Hybrid + short cable tested together in Vac Tank Hybrid populated with decoupling caps (2*500v 10nf to Gnd) Guard and HT shorted together All lines except HT and Guard on HT connector shorted to ground (includes Power) Discharges (brief – up to 15nA ) seen on ramping up above 430V 0.4nA leakage at 500V for 1 hour 0.2nA leakage at 500V if taken to 510 and back down again.  holds 500V but need more statistics K5 clearances are the same or better than K4 so no differences expected. Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

Tony Smith LHCb Velo Electronics PRR CERN 16/01/06 Cables - testing Cables can be fully tested visually and quickly for shorts, open circuits and intermittent faults. Each pin on the connectors has an individual LED so continuity is easily assessed. LEDs are powered in blocks with most likely pair to pair or pair to power and ground shorts show up immediately Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

Tony Smith LHCb Velo Electronics PRR CERN 16/01/06 MODULE testing LASER SYSTEM The laser system is used to test and debug modules at several stages during construction: after the chip back ends are bonded, after PA’s are bonded and when sensors are bonded. The system makes it possible to stimulate every sensor channel under program control. Data from all tests is uploaded to the production database at each stage. Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

Tony Smith LHCb Velo Electronics PRR CERN 16/01/06 HYBRID K5 Status -1 Double sided hybrids produced and functionally verified in test setup with short cables and dummy cards ( but not HT with long cable?) No parametric S/N from this (K5) version yet, but construction layout and components are virtually the same as previous version (K4) which was successfully tested in a beam last year. The only substantial change is that of splitting the power plane into four separate planes so that rad hard voltage regulators may be used and this very unlikely to change high frequency performance that could impact on the noise. Active components (readout chips and temperature sensors and detectors) are qualified as Rad Hard   Passives are standard thin film resistors and capacitors with X7R dielectrics as used in ATLAS Circuits are bonded to substrates using modified polyimide as in the manufacture of kapton multilayer circuits which are known to be radiation tolerant. NOTE the radiation performance of the epoxy adhesive used in the CF prepreg is untested and unknown Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

Tony Smith LHCb Velo Electronics PRR CERN 16/01/06 HYBRID K5 Status -2 current status of the hybrid production is:    7 K5 hybrids populated with discrete components of which 1 at cern for electrical test with chips one side and back ends bonded 1 at cern for mechanical test – no chips 2 at Liverpool chips both sides, fanouts attached – fully working back ends –awaiting FE bonding – electrical for PRR? 2 with chips both sides – partially working back ends – mechanicals for PRR 1 unused 11 more awaiting population at Liverpool (3 next week 8 more in 2 weeks) 28 more substrates at Stevenage for Lamination a further 100 circuits produced and tested at Stevenage (sufficient for 50 hybrids ) 19 more pieces of TPG available 20 more on order QA procedures and database tracking of all parts is in place. Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

Tony Smith LHCb Velo Electronics PRR CERN 16/01/06 HYBRID K5 Known issues -1 Minor PCB layout error means that POR RET line is not terminated on the hybrid – this will have no effect on the operation of modules. – see schematic   Yield of flat substrates is unstable From the first batch of 20 substrates produced ` 3 were rejected on twist <> 200um+-200um 1 rejected on thickness 1 rejected on surface quality from the second batch of 20 10 pass twist <> 200um+-200um 17 pass with 300um +-300um hybrid flatness after lamination to selected substrates (200um criteria) is not stable,  From last batch of 12 laminated substrates 1 failed electrically – unfixable short circuit after lamination only 4 pass a 200um +-200um flatness criteria or 7 pass with a 300um+-300um flatness criteria efforts to resolve this are ongoing – we believe it may be possible that acceptance can be increased by batching into groups with similar twist and adjusting the angle at the top of the paddles Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

Tony Smith LHCb Velo Electronics PRR CERN 16/01/06 Cables Known issues Prototype cables were not flat (wrinkled) which is thought to be caused by heating the cables without them being clamped along their length when stiffening pieces are attached. The manufacturer is aware of the problem and intend to try to clamp the cables in the next production. This is not an electrical problem but it was initially thought that it may pose problems for attaching to strain relief clamps on the module bases. Subsequent measurements show that although there is some wrinkling it looks worse than it really is and should not cause problems. The prototype cables were made 5mm too long – however this does not pose a problem (may help with insertion) and production cables will be made the same size to avoid a delay for retooling. Soldering of connectors to cables by hand soldering has shown some open circuits which are fixable but require rework and raise the question of reliability. This is thought to be caused by use of low flux content solder which produces a visually appealing finish but shows poor wetting of contacts. This has been raised with the population company and will be solved by using different solder better QA or possibly by using a reflow method. Tony Smith LHCb Velo Electronics PRR CERN 16/01/06

Tony Smith LHCb Velo Electronics PRR CERN 16/01/06 Ground cable Status & Known issues 8 Prototype ground cables were made at the same time as the short cables From 3d modelling it appears that they will be approximately 1.6mm short. This does not present a problem for initial tests as the holes in them can be enlarged. It has now been decided to split the production of these cables from that of the short cables so that there is no impact on the short cable production due to the need to retool the dies for cutting. Redesign and manufacture of correct size parts estimated at 6 weeks Tony Smith LHCb Velo Electronics PRR CERN 16/01/06