Oracle RAC and Linux in the real enterprise October, 02 Mark Clark Director Merrill Lynch Europe PLC Global Database Technologies October, 02 Mark Clark.

Slides:



Advertisements
Similar presentations
How We Manage SaaS Infrastructure Knowledge Track
Advertisements

Hardware & the Machine room Week 5 – Lecture 1. What is behind the wall plug for your workstation? Today we will look at the platform on which our Information.
Cloud Computing: Theirs, Mine and Ours Belinda G. Watkins, VP EIS - Network Computing FedEx Services March 11, 2011.
Transforming Business with Advanced Analytics: Introducing the New Intel® Xeon® Processor E7 v2 Family Seetha Rama Krishna Director, APAC HPC Solutions.
Oracle Exalogic Elastic Cloud Vysoký výkon pre Javu, Middleware a Aplikácie Mikuláš Strelecký, Oracle Slovensko.
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The future is mission.
High Availability Options for JD Edwards EnterpriseOne Shawn Scanlon, GSI.
©2013 Avaya Inc. All rights reservedFebruary 26-28, 2013 | Orlando, FL.
Compaq Enterprise Technical Symposium 2001 Compaq Product Roadmaps Itanium TM Systems Dave Fenwick Staff Fellow High Performance Systems Dave Fenwick Staff.
Introduction to DBA.
Wim Coekaerts Director of Linux Engineering Oracle Corporation.
VoipNow Core Solution capabilities and business value.
High Availability Group 08: Võ Đức Vĩnh Nguyễn Quang Vũ
VERITAS Software Corp. BUSINESS WITHOUT INTERRUPTION Fredy Nick SE Manager.
RDS and Oracle 10g RAC Update Paul Tsien, Oracle.
Oracle Enterprise Manager – Cloud Control 12c Simon Keys, The Small Ronnie Martin Lambert, The Large Ronnie.
Server Platforms Week 11- Lecture 1. Server Market $ 46,100,000,000 ($ 46.1 Billion) Gartner.
© Hitachi Data Systems Corporation All rights reserved. 1 1 Det går pænt stærkt! Tony Franck Senior Solution Manager.
High Availability & Oracle RAC 18 Aug 2005 John Sheaffer Platform Solution Specialist
Grid Computing Veronique Anxolabehere Senior Director of Product Marketing Mike Margulies Senior Director, Grid Platform Solutions.
Infiniband enables scalable Real Application Clusters – Update Spring 2008 Sumanta Chatterjee, Oracle Richard Frank, Oracle.
An Introduction to Infrastructure Ch 11. Issues Performance drain on the operating environment Technical skills of the data warehouse implementers Operational.
Selling Consolidation’s Value. Why Consolidate? Reduce Complexity Increase Productivity Reduce TCO Improve End User Experience Improve IT Performance.
SANPoint Foundation Suite HA Robert Soderbery Sr. Director, Product Management VERITAS Software Corporation.
PRESENTATION TITLE GOES HERE DAS to SAN -- iSCSI Offers a Compelling Solution Presented by: Jason Blosil, NetApp and Gary Gumanow, Dell.
Database Services for Physics at CERN with Oracle 10g RAC HEPiX - April 4th 2006, Rome Luca Canali, CERN.
Bob Thome, Senior Director of Product Management, Oracle SIMPLIFYING YOUR HIGH AVAILABILITY DATABASE.
Training Workshop Windows Azure Platform. Presentation Outline (hidden slide): Technical Level: 200 Intended Audience: Developers Objectives (what do.
DELL CONFIDENTIAL MAXIMIZING PERFORMANCE ON ORACLE 11G SE RAC Wendy Chen, Systems Engineer Naveen Iyengar, Systems Engineer Global Solutions Engineering,
Database Edition for Sybase Sales Presentation. Market Drivers DBAs are facing immense time pressure in an environment with ever-increasing data Continuous.
Enterprise Storage A New Approach to Information Access Darren Thomas Vice President Compaq Computer Corporation.
Geoffrey Brown Director, GRID Technologies Advanced Technology Solutions Oracle Corporation.
© 2004 Oracle Corporation Laurent Sandrolini Vice President Systems Platform Division Oracle Corporation.
CERN - IT Department CH-1211 Genève 23 Switzerland t Tier0 database extensions and multi-core/64 bit studies Maria Girone, CERN IT-PSS LCG.
Presentation To. Mission Think Dynamics is in the business of automating the management of data center resources thereby enabling senior IT executives.
InfiniSwitch Company Confidential. 2 InfiniSwitch Agenda InfiniBand Overview Company Overview Product Strategy Q&A.
NCICB Systems Architecture Bill Britton Terrapin Systems LPG/NCICB Dedicated Support.
Copyright © 2001 VERITAS Software Corporation. All Rights Reserved. VERITAS, VERITAS SOFTWARE, the VERITAS logo and VERITAS The Intelligent Storage Software.
Business Intelligence Appliance Powerful pay as you grow BI solutions with Engineered Systems.
Building a Terabyte Data Warehouse, Using Linux and RAC George Lumpkin Director Product Management Oracle Corporation Session id:
Middleware for FIs Apeego House 4B, Tardeo Rd. Mumbai Tel: Fax:
Software Scalability Issues in Large Clusters CHEP2003 – San Diego March 24-28, 2003 A. Chan, R. Hogue, C. Hollowell, O. Rind, T. Throwe, T. Wlodek RHIC.
Achieving Scalability, Performance and Availability on Linux with Oracle 9iR2-RAC Grant McAlister Senior Database Engineer Amazon.com Paper
Dave Dargo Vice President Linux Program Office Oracle Corporation.
TWNIC mDNS Business Plan Kenny Huang TWNIC JET Meeting, Beijing 28 August 2000.
Compaq Customer Services RTR Support Infrastructure European Client-Server Expertise Center Manager Compaq Customer Services James NAUFFRAY.
Clustering In A SAN For High Availability Steve Dalton, President and CEO Gadzoox Networks September 2002.
CERN/IT/DB A Strawman Model for using Oracle for LHC Physics Data Jamie Shiers, IT-DB, CERN.
Mark E. Fuller Senior Principal Instructor Oracle University Oracle Corporation.
CERN Database Services for the LHC Computing Grid Maria Girone, CERN.
Ashish Prabhu Douglas Utzig High Availability Systems Group Server Technologies Oracle Corporation.
Oracle Database Architecture By Ayesha Manzer. Automatic Storage Management Spreads database data across all disks Creates and maintains a storage grid.
CERN - IT Department CH-1211 Genève 23 Switzerland t High Availability Databases based on Oracle 10g RAC on Linux WLCG Tier2 Tutorials, CERN,
Copyright ©2003 Dell Inc. All rights reserved. Scaling-Out with Oracle® Grid Computing on Dell™ Hardware J. Craig Lowery, Ph.D. Software Architect and.
Tackling I/O Issues 1 David Race 16 March 2010.
Copyright © 2006 Quest Software Quest RAC Tools Bert Scalzo, Domain Expert, Oracle Solutions
SQL Server 2012 Session: 1 Session: 4 SQL Azure Data Management Using Microsoft SQL Server.
Thomas Baus Senior Sales Consultant Oracle/SAP Global Technology Center Mail: Phone:
Red Hat Enterprise Linux Presenter name Title, Red Hat Date.
Peter Idoine Managing Director Oracle New Zealand Limited.
Enterprise Vitrualization by Ernest de León. Brief Overview.
UNIFY Performance - Summary Plans
Sebastian Solbach Consulting Member of Technical Staff
Appro Xtreme-X Supercomputers
NGS Oracle Service.
Scalable Database Services for Physics: Oracle 10g RAC on Linux
Introduction of Week 6 Assignment Discussion
TWNIC mDNS Business Plan
Scalable Database Services for Physics: Oracle 10g RAC on Linux
Managing Work in the New Computing Environment March 14, 2003
Presentation transcript:

Oracle RAC and Linux in the real enterprise October, 02 Mark Clark Director Merrill Lynch Europe PLC Global Database Technologies October, 02 Mark Clark Director Merrill Lynch Europe PLC Global Database Technologies

Agenda  The challenge  Current solutions  DBMS Utopia at Merrill Lynch  Selected architecture  Selected partners  Program history  Results and conclusions  The managed service  The challenge  Current solutions  DBMS Utopia at Merrill Lynch  Selected architecture  Selected partners  Program history  Results and conclusions  The managed service

The Challenge and Mission “ Access to Oracle’s renowned availability, integrity, performance and scalability at a commodity server price point”

Current solutions  Risc based UNIX platforms  Strengths  Well understood and integrated into ML infrastructure  Full and complete ISV support  Robust and mature  Low risk technically and financially  Mass acceptance  Risc based UNIX platforms  Strengths  Well understood and integrated into ML infrastructure  Full and complete ISV support  Robust and mature  Low risk technically and financially  Mass acceptance

Current solutions (cont.)  RISC based UNIX platforms  Weaknesses  Platform costs moderately high  Large compute platforms especially so  Limited competition in server marketplace  Emerging technologies slow to market  Closed source  RISC based UNIX platforms  Weaknesses  Platform costs moderately high  Large compute platforms especially so  Limited competition in server marketplace  Emerging technologies slow to market  Closed source

DBMS Utopia at Merrill Lynch  Fully managed service  Actual usage-based charging model  Delivery at commodity prices  Flexible capacity model  High availability at Day 1  Fully managed service  Actual usage-based charging model  Delivery at commodity prices  Flexible capacity model  High availability at Day 1

Selected technologies  Oracle / RAC  A market leader of database management tools and products with new high availability/scalability options (RAC).  Intel  Commodity server architecture, well understood at Merrill Lynch in the SQL/server domain. Compelling technology roadmap  Linux  Rapidly developing open source OS with a strong technology partnership with Oracle and Intel. Leverages the Intel architecture. Just another UNIX like OS.  Oracle / RAC  A market leader of database management tools and products with new high availability/scalability options (RAC).  Intel  Commodity server architecture, well understood at Merrill Lynch in the SQL/server domain. Compelling technology roadmap  Linux  Rapidly developing open source OS with a strong technology partnership with Oracle and Intel. Leverages the Intel architecture. Just another UNIX like OS.

Selected partners  Oracle  Early access to certain product functionality and new features. Fast track to engineering and performance group  Hewlett Packard  Current Intel server platform for Merrill Lynch Europe and provider of server hardware for all testing (formerly Compaq)  Intel  Provision of customer solutions centres and skills / resources for the offsite proof of concept  Oracle  Early access to certain product functionality and new features. Fast track to engineering and performance group  Hewlett Packard  Current Intel server platform for Merrill Lynch Europe and provider of server hardware for all testing (formerly Compaq)  Intel  Provision of customer solutions centres and skills / resources for the offsite proof of concept

Program history  Key milestones  November 2001 (Phase 1)  IA32, Oracle 9.0.1, Red Hat 7.2, Raw partitions  March 2002 (Phase 1b)  Two node production RAC deployment  October 2002 (Phase 2)  IA32, Oracle 9.2.0, Red Hat 2.1 AS, OCFS  Key milestones  November 2001 (Phase 1)  IA32, Oracle 9.0.1, Red Hat 7.2, Raw partitions  March 2002 (Phase 1b)  Two node production RAC deployment  October 2002 (Phase 2)  IA32, Oracle 9.2.0, Red Hat 2.1 AS, OCFS

Program Results - Phase 1  November 2001 (Phase 1) POC Build  IA32, Oracle 9.0.1, Red Hat 7.2, Raw partitions  Functional  Oracle worked  Performance  More performant and lower cost comparable to RISC/UNIX server of similar configuration  November 2001 (Phase 1) POC Build  IA32, Oracle 9.0.1, Red Hat 7.2, Raw partitions  Functional  Oracle worked  Performance  More performant and lower cost comparable to RISC/UNIX server of similar configuration

Program Results - Phase 1 (cont.)  Gaps  Non-certified OS/Oracle combination  Infrastructure and ISV alignment  Unmanageable RAW / No OMF support  No cluster filesystem  No SAN integration  Backup / Recovery tools  Performance management  Monitoring / Alerting  Gaps  Non-certified OS/Oracle combination  Infrastructure and ISV alignment  Unmanageable RAW / No OMF support  No cluster filesystem  No SAN integration  Backup / Recovery tools  Performance management  Monitoring / Alerting

Program Results - Phase 1b  March 2002 (Phase 1b) - POC Build  IA32, Oracle 9.0.1, Red Hat 7.2, Raw partitions  Functional  Oracle worked  Performance  More performant and lower cost comparable to RISC/UNIX server of similar configuration  March 2002 (Phase 1b) - POC Build  IA32, Oracle 9.0.1, Red Hat 7.2, Raw partitions  Functional  Oracle worked  Performance  More performant and lower cost comparable to RISC/UNIX server of similar configuration

Program Results - Phase 1b (cont.)  Risks and mitigation

Program results - Phase 2 October 2002 (Phase 2) The GA Build IA32, Oracle 9.2.0, Red Hat 2.1 AS, OCFS 4 Node RAC configuration 32 Processor 16GB memory EMC Clarion storage array Brocade switched SAN fabric Gigabit cluster interconnect with redundant switches Single instance per node (today) October 2002 (Phase 2) The GA Build IA32, Oracle 9.2.0, Red Hat 2.1 AS, OCFS 4 Node RAC configuration 32 Processor 16GB memory EMC Clarion storage array Brocade switched SAN fabric Gigabit cluster interconnect with redundant switches Single instance per node (today)

Program results - Phase 2 (cont.) d1d2 d3d4 EMC Clarion d11 d13 d12 d14 h1h3 h2 h4 d21 d23 d22 d24 d31 d33 d32 d34 d41 d43 d42 d44 SAN switch Interconnect sw1 Interconnect sw2

Program results - Phase 2 (cont.)  Functional  It still worked  Performance / Stress testing  Server side Oracle CPU stress test  I/O stress test (Direct path load)  Client/Server realworld stress test  Critical failure condition testing  Unexpected power failures  Interconnect failure (single path)  SAN connectivity failure  Functional  It still worked  Performance / Stress testing  Server side Oracle CPU stress test  I/O stress test (Direct path load)  Client/Server realworld stress test  Critical failure condition testing  Unexpected power failures  Interconnect failure (single path)  SAN connectivity failure

Program results Phase 2 - (cont.)  Performance / Stress testing  Server side Oracle CPU stress test  Used to prove CPU scalability  Open source benchmarking tool based broadly on TPC-C Order-Status & Stock-Level transactions - “orabm” sourced from  In memory database (no I/O stress) - 300MB SGA total  orabm allows rapid deployment and results gathering - ie; low cost  Performance / Stress testing  Server side Oracle CPU stress test  Used to prove CPU scalability  Open source benchmarking tool based broadly on TPC-C Order-Status & Stock-Level transactions - “orabm” sourced from  In memory database (no I/O stress) - 300MB SGA total  orabm allows rapid deployment and results gathering - ie; low cost

Program results Phase 2 - (cont.) Results of best single session tps (Oracle CPU stress test) Results of best single session tps (Oracle CPU stress test)

Program results Phase 2 - (cont.)  Performance / Stress testing  I/O stress test (Direct path load)  Used to prove I/O scalability  Oracle direct path loader was used in a multi- stream parallel load activity  Fixed format input data loading the TPC-C CUSTOMERS table  Tests executed in a single node and multi node configuration  Performance / Stress testing  I/O stress test (Direct path load)  Used to prove I/O scalability  Oracle direct path loader was used in a multi- stream parallel load activity  Fixed format input data loading the TPC-C CUSTOMERS table  Tests executed in a single node and multi node configuration

Program results Phase 2 - (cont.) Results of I/O stress test Note: 6 load streams per node (ie; 12 streams = 2 nodes)

Program results Phase 2 - (cont.)  Performance / Stress testing  Client/Server realworld stress test  Used to prove transaction throughput compared to existing Merrill Lynch systems  Using Quest Benchmark Factory  Loading generated 10x change volumes compared to heaviest loaded ML EMEA database  Performance / Stress testing  Client/Server realworld stress test  Used to prove transaction throughput compared to existing Merrill Lynch systems  Using Quest Benchmark Factory  Loading generated 10x change volumes compared to heaviest loaded ML EMEA database

Program results Phase 2 - (cont.)  Critical failure condition testing  Unexpected power failures  Removed the power cable mid-processing  No outage  Interconnect failure (single path)  NIC failover by Software  Completely transparent to Oracle  No outage  SAN connectivity failure  Removal of HBA cable mid processing  No outage  Critical failure condition testing  Unexpected power failures  Removed the power cable mid-processing  No outage  Interconnect failure (single path)  NIC failover by Software  Completely transparent to Oracle  No outage  SAN connectivity failure  Removal of HBA cable mid processing  No outage

Phase 2 - summary  Gap resolution for DBMS Utopia

The managed service - the future Based on the 2002 Phase 2 configuration and products Flexible capacity model Rapid time to solution provision With an actual compute-based billing model Due for launch in December 2002 Based on the 2002 Phase 2 configuration and products Flexible capacity model Rapid time to solution provision With an actual compute-based billing model Due for launch in December 2002