LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.

Slides:



Advertisements
Similar presentations
Kitakami IR Access Discussions T. Markiewicz/SLAC 13 May 2014 SiD Meeting / AWLC Fermilab.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Construction and Installation of the CLIC Experimental Area
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
ILC A SIAN D RAFT S CHEDULE K Foraz, M Gastal & J Osborne Many thanks to all contributors.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
ILC Cryogenics Layout: A draft consensus for the Change Request CFS and Cryogenics Two-days Workshop at CERN 27 and 28, July, 2015.
EDMS for CFS Discussion: How to best use EDMS for CFS in ILC preparation? Lars Hagge, Benno List Deutsches Elektronen-Synchrotron DESY LCWS13, Tokyo,
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
More than an idea not yet a project 1 Meeting Issues & Goals CFS-ADI Tokyo 2014 Mike Harrison.
Report from ILC CFS and Cryogenics Workshop
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
1 J.Osborne (CERN)
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Experimental Hall in Mountain Regions
FCC Underground Infrastructure
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
Introduction and Meeting Objectives
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Integration Ideas for the Central Region Some old some new
Latest ILC tunnel cross section May 2017
CLIC Civil Engineering Update
Tom Lackowski Revised 10/12/2011
8-10 April 2014 CFS-ADI Joint Meeting
Overview of Day One – 29 Feb 2016
Presentation transcript:

LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne

2 CFS & MDI & Detector Parallel Session Change request for Hybrid A’ Interaction Region Layout (K.Buesser)Change request for Hybrid A’ Interaction Region Layout (K.Buesser) Document ready for submittal to review panel for IR access change to vertical shaftsDocument ready for submittal to review panel for IR access change to vertical shafts LCWS14 Belgrade October 2014

3 CFS & MDI & Detector Parallel Session New detector installation method now similar to CMSNew detector installation method now similar to CMS Full impact of 50ton (approx.) road transport limit still to be fully assessedFull impact of 50ton (approx.) road transport limit still to be fully assessed LCWS14 Belgrade October 2014

4 CFS planning for pre-construction period Financial planning for pre-construction period reviewedFinancial planning for pre-construction period reviewed ARUP experience on previous projects and CERN Future Circular Collider (FCC) by M.Sykes and Y.LooARUP experience on previous projects and CERN Future Circular Collider (FCC) by M.Sykes and Y.Loo Typical Site investigation, prior to construction start :Typical Site investigation, prior to construction start : LCWS14 Belgrade October 2014

5 Cost of Site Investigation v Project RiskCost of Site Investigation v Project Risk LCWS14 Belgrade October 2014 CFS planning for pre-construction period

6 ARUP presented some case studiesARUP presented some case studies For example, York Potash located in a national park in UK, difficult to drill boreholesFor example, York Potash located in a national park in UK, difficult to drill boreholes Access for drilling rigs sometimes impossibleAccess for drilling rigs sometimes impossible Risk register recommended to assess cost of Site Investigation against out-turn construction costsRisk register recommended to assess cost of Site Investigation against out-turn construction costs LCWS14 Belgrade October 2014 CFS planning for pre-construction period

7 ARUP have developed a bespoke BIM Tunnel Optimisation Tool (TOT) for CERN FCC.ARUP have developed a bespoke BIM Tunnel Optimisation Tool (TOT) for CERN FCC. 3d geological tool for evaluating the possible layouts3d geological tool for evaluating the possible layouts Investigation underway to see if ARUP can provide a similar tool for Kitakami Site (discussions with T.Sanuki )Investigation underway to see if ARUP can provide a similar tool for Kitakami Site (discussions with T.Sanuki ) LCWS14 Belgrade October 2014 CFS planning for pre-construction period

8 J-Power experience from Y.Nishimoto on underground project in JapanJ-Power experience from Y.Nishimoto on underground project in Japan LCWS14 Belgrade October 2014 CFS planning for pre-construction period

9 CFS schedule & Human Resource plan (M.Miyahara)CFS schedule & Human Resource plan (M.Miyahara) LCWS14 Belgrade October 2014 CFS planning for pre-construction period

10 CFS Site Investigation plan (M.Miyahara)CFS Site Investigation plan (M.Miyahara) LCWS14 Belgrade October 2014 CFS planning for pre-construction period

11 Proposed Site Investigation to allow construction tendering (M.Miyahara)Proposed Site Investigation to allow construction tendering (M.Miyahara) LCWS14 Belgrade October 2014 CFS planning for pre-construction period Approx 1% of out-turn CFS civil estimate

12 CFS and Main Linac radiation shielding (T.Sanami) Update of radiation simulationsUpdate of radiation simulations TDR has 3.5m thick central shielding wallTDR has 3.5m thick central shielding wall LCWS14 Belgrade October 2014

13 CFS and Main Linac radiation shielding Initial findings show that a wall reduced to 2.5m thick could be sufficientInitial findings show that a wall reduced to 2.5m thick could be sufficient Change control to be initiated with cost saving for smaller tunnel and wallChange control to be initiated with cost saving for smaller tunnel and wall LCWS14 Belgrade October 2014

14 CFS – Detector and Machine Scheduling (M.Gastal) Detector SchedulingDetector Scheduling CFS schedule prepared for IR change control :CFS schedule prepared for IR change control : Martin has started looking in more detail in the 6 months lowering period for ILD with detector colleaguesMartin has started looking in more detail in the 6 months lowering period for ILD with detector colleagues LCWS14 Belgrade October 2014

ILD Side SiD Side N S 10m Move ILD Platform on IP ILD Detector lowering sequence

ILD Side SiD Side N S 10m Lower YE-: 8h ILD Detector lowering sequence

ILD Side SiD Side N S 10m Move YE- to the N Alcove: 8h ILD Detector lowering sequence

ILD Side SiD Side N S 10m Move YE- to the N Alcove: 6h ILD Detector lowering sequence

ILD Side SiD Side N S 10m Move ILD platform on IP: 2h ILD Detector lowering sequence

ILD Side SiD Side N S 10m Lower YB-: 8h ILD Detector lowering sequence

ILD Side SiD Side N S 10m Move YB- to N alcove: 8h ILD Detector lowering sequence

ILD Side SiD Side N S 10m Move YB- to N alcove: 8h ILD Detector lowering sequence

ILD Side SiD Side N S 10m Move ILD platform on IP: 2h ILD Detector lowering sequence

24 CFS – Machine Scheduling (M.Gastal) Machine installation rate has a critical impact on the overall ILC construction scheduleMachine installation rate has a critical impact on the overall ILC construction schedule Further to recommendations at Windsor Cost Review the rates are being re-visitedFurther to recommendations at Windsor Cost Review the rates are being re-visited Martin is contacting XFEL and Project X colleagues to update the installation schedule Martin is contacting XFEL and Project X colleagues to update the installation schedule LCWS14 Belgrade October 2014

25 CFS and ILC Coordinate Reference System (B.List) LCWS14 Belgrade October 2014 “How to do design integration for a 30km long building” Benno“How to do design integration for a 30km long building” Benno

26 CFS and ILC Coordinsate Reference System(B.List) Proposal from Benno for a standardised co-ordinate systemProposal from Benno for a standardised co-ordinate system Definition of an ILC CRS brings together geospacial data and CAD models, for use in GIS and CAD systemsDefinition of an ILC CRS brings together geospacial data and CAD models, for use in GIS and CAD systems Needs to be reviewed by survey experts world-wideNeeds to be reviewed by survey experts world-wide LCWS14 Belgrade October 2014

27 CFS – Requirements Tables (L.Hagge) Reminder from Lars that project requirements should be recorded correctlyReminder from Lars that project requirements should be recorded correctly For example, IR requirements table is under preparationFor example, IR requirements table is under preparation LCWS14 Belgrade October 2014

28 CFS & Positron Source Joint Session (T.Omori) Conventional Source being considered in addition to TDR ‘rotating’ systemConventional Source being considered in addition to TDR ‘rotating’ system TDR design has two tunnels in central regionTDR design has two tunnels in central region Future studies needed to see if its cheaper to extend the ‘standard’ tunnel cross section through this area with local enlargementsFuture studies needed to see if its cheaper to extend the ‘standard’ tunnel cross section through this area with local enlargements RDR had a shaft for radiation storage of targets onto surface, or should it be stored locally underground ?RDR had a shaft for radiation storage of targets onto surface, or should it be stored locally underground ? Needs to be studied further for Kitakami siteNeeds to be studied further for Kitakami site LCWS14 Belgrade October 2014

29 CFS – Damping Ring civil design (M.Miyahara & G.Orukawa) Some changes were discussed for adapting the TDR design to the Kitakami mountain sIte, for example :Some changes were discussed for adapting the TDR design to the Kitakami mountain sIte, for example : Damping ring access tunnel moved from TDR location to Hybrid A’ positionDamping ring access tunnel moved from TDR location to Hybrid A’ position Refuge areas in US design omitted and evacuation simulationsRefuge areas in US design omitted and evacuation simulations Tunnel Shape optimised for drill and blastTunnel Shape optimised for drill and blast Eg Kicker Areas re-modelledEg Kicker Areas re-modelled Shielding wall currently 1m thick in DRShielding wall currently 1m thick in DR LCWS14 Belgrade October 2014