MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.

Slides:



Advertisements
Similar presentations
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Advertisements

Mice VC Nov 2005Jean-Sébastien GraulichSlide 1 The ADC Problem in MICE o Reminder: Spill, Readout and Digitization o Acquisition Rate vs dead time o Conventional.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
MICE DAQ and Controls ReviewJean-Sebastien GraulichSlide 1 DAQ Overview o Terminology o Requirements o Front End Electronics o Trigger System o DAQ Hardware.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
TOF Front End electronics
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
M. Bonesini DAQ Meeting1 M. Bonesini INFN Milano Some Considerations for MICE TOF Stations FE electronics (mainly TOF0)
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
UCN-nEDM DAQ DAQ and Slow Control L.Lee 1 July 3, 2013.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
ICARUS General Trigger Design Contributions from: M.Della Pietra, A.Di Cicco, P.Di Meo, G.Fiorillo, P.Parascandolo, R.Santorelli, P.Trattino B.Baboussinov,
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
"North American" Electronics
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Jean-Sebastien Graulich, Geneva
KRB proposal (Read Board of Kyiv group)
PADME L0 Trigger Processor
Luminosity Monitor Status
ProtoDUNE SP DAQ assumptions, interfaces & constraints
F.Guber, A.Ivashkin INR, Moscow
Example of DAQ Trigger issues for the SoLID experiment
Particle ID Diagnostics in the MICE Beamline
Presentation transcript:

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring o Triggers o Front End Electronics o Schedule Milestones o Summary Jean-Sebastien Graulich, Geneva

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 2 Since CM15  Vassil Verguilov joined the group as PhD student at Univ. Geneva  Test beam in Frascati Complete success for the DAQ  DAQ Software Training started in CERN-ALICE group  DAQ workshop III took place in Daresbury Focused mainly on Control and Monitoring  A mailing list for DAQ, Control and Monitoring has been set up Don’t hesitate to subscribe  A DAQ Web site is under construction

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 3 DDAQ Software  Training has started in the CERN-ALICE group The ALICE DAQ software framework, DATE, will provide us with the necessary EventBuilder tool: Subevents collected by different processors have to be synchronized and put together before storage We are working on special readout for the data generated by ALICE Central Trigger Processor The technique we develop there can be applied for MICE DDAQ / MCM Interface -> Efficient Training Contact with ALICE Team is excellent  DATE is running on a MICE PC, sources are available Not yet for MICE applications…  As far as we can tell today, DATE complies with MICE needs It has much more functionalities than what MICE needs

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 4 Interface DDAQ / MCM  Decisions taken at DAQ Workshop III: A list of selected physical variables will be included in the online data stream from MCM (Mice Control & Monitoring) This data will be collected asynchronously during the run, written in a local file which is appended to the data file at the end of the run The same data will be also logged in the MCM archived Run start and Run stop will be logged in the MCM archive The Run will be stopped automatically in case one subsystem (Beam, RF, PID, etc.) goes into a fault status or in case of connection problem  Technical implementation already tested !  To Do: Prepare the list of relevant variables -> Analysis working group Define when each subsystem is faulty -> subsystems

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 5 DataFlow Revised General Architecture Trigger distribution Tracker EmCal TOF Trigger + Ckovs GigaBit Switch Event Builder (GDC) OnlineStorage Online Monitoring Run Control Remote Mass Storage 100 Mb Switch VME Crates Optical links Linux PCs (LDC) MCM Readout MCM Subnet

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 6 Test Bench in Geneva  Frozen since CM15 Waiting for DATE software  Everything in hand now V2718 received in Feb. VME crates delivered  Will start as soon as we are back distribution Trigger Optical link + Online Monitoring TOF Trigger Ethernet Linux PCs Office Switch Run Control + Event Builder VME Crates + Local Storage

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 7 Synchronization Issue  3 subsystems have to be synchronized with each other and with the ISIS Machine Cycle: Target RF DAQ  A fixed frequency approach is not optimal: Busy/Recovery time might not be constant (certainly the case for DDAQ)  An “As Soon As Ready” approach has been proposed in MICE-NOTE-DAQ-147 Each system provides a veto signal which is set when the system is not ready to receive a trigger The first MS after all veto’s are dropped generates the different triggers

MICE Veto Target Veto RF Veto DAQ Veto MS Target Request RF Request Target Trigger Protons on target RF Trigger RF Power DT Gate DAQ Trigger Target Delay RF Delay DT Delay 20 ms Extraction

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 9 Triggers  DAQ Trigger Triggers the readout of the Front End Electronics output buffer memory Should arrive at the end of the Spill, after the last event of the Spill Distributed to all VME crates  Particle Trigger Triggers the digitization of the signals arriving at the Front End Electronics Should arrive a few ns around the signal (before in case of the SIS 3320) Distributed to all FEE boards We expect about 600 Particle triggers for 1 DAQ trigger

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 10 DAQ Trigger  DATE requires dedicated inputs for at least 4 event Types: 1)Start of Spill: A signal sent to the DAQ slightly before the beginning of the Spill in order to make sure that all the processes are ready to receive data 2)Physics 3)End of Spill: A signal sent to the DAQ when the readout is finished which allow checking that all the processes have correctly performed the readout 4) Calibration  More inputs allows more options E.g. Calibration events can be pulser or pedestal or cosmics, etc. Dedicated input allows dedicated readout and/or event building and/or tagging with event attribute

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 11 Particle Trigger  4 Particle Trigger Conditions for Normal Events Burst: All ISIS bunch crossing with the target within the DT-Gate can produce a particle trigger, providing that the FEE is not busy Beam: Burst  TOF0 Timing given by Burst Upstream: Beam  TOF1 Timing given by TOF1 Traversing: Upstream  TOF2 Timing given by TOF1 TOFn is defined by a twofold (Left x Right) coincidence of the OR of the 12 (8) slabs of a single layer  Trigger condition does NOT depend on Beam Momentum !  Trigger Condition should be selected on the Run Control GUI before each Start of Run This feature is not included in DATE but technical solution exists

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 12 Particle Trigger  Simplest Implementation of the Trigger Condition selection using output Register OReg1 OReg2 OReg3 OReg4 Burst TOF0 TOF1 TOF2 Particle Trigger Request FEE Busy Particle Trigger  Setting OReg selects the trigger condition  Not extendable to (much) more conditions !  I/O register CAEN V977 has been adopted

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 13 FE Electronics: Reminder  Flash ADC (option for charge measurement in EmCal) Evaluation module received from Struck SIS3320, 200 MHz, 12 bits, 32 MB Event Buffer Readout OK, tested at BTF, Frascati Testing energy and time resolution after shaper 2 ns rise time Shaper + Invert. V thr t thr ~30 ns rise time If we can fit the rising edge, time resolution can be much better than the 5 ns of the sampling rate.  Advantage: No signal splitter, no delay cable, no discriminator, no TDC ! It’s commercially available !! It’s commercially available !! PMT

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 14 Flash ADC test with cosmics Time (sample #) Amplitude fit = p4 – p0 (  0 / (  0 -  ) ) [ ( e -(t-t 0 )/  -e -(t-t 0 )/  0 ) + (t-t0) /  e -(t-t 0 )/  ] 0 =0 =  = = t0 =t0 = Shaper Prototype (2ch) produced by Ilko Rusinov (Sofia)

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 15 Trigger Pos 2 Trigger Pos 1 Flash ADC test with cosmics Pmt leftPmt right Shaper ch01 ch02 ~22 cm Test done with TOF Scintillator bar and TOF Pmt (R4998)

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 16 Flash ADC test with cosmics = 700 ps t 0;left – t 0;right (sample) ~2.5 ns

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 17 Flash ADC Tests  Data from BTF not analyzed yet Problem with the shape of the signal The formula is valid only for exponential signal Problem with EMcal because of Long cable Passive splitter Special base (voltage divider) for differential output  Energy resolution not yet evaluated  CAEN proposed a cheaper 100 MHz Flash ADC They will provide use with an evaluation module in November

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 18 FE Electronics Tests  Still pending ToT Discriminator (cheap option for TOF) TeV IPM (option for charge measurement in EmCal and TOF) … We are short of man power !

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 19 Schedule Milestones  Complete Flash ADC/BTF Data analysis: Nov 2006  DAQ Test bench including Event builder: Feb 2007  Order Hardware for Stage 1: March 2007  Move DDAQ system to RAL: July 2007 ItemRequiredAlready Purchased Total Cost (k€) Already Spent (k€) 6U VME crates + power supply VME-PCI interface Data Collector PC Network switches20~120.0 Event Builders2+10~150.0 Local Storage (~8 TB)10~150.0 Workstations + monitors (control, monitoring, on-line analysis) 70~150.0 Trigger receiver Vme Scaler Unit Trigger Logic Modules~100 channels0~100.0 Trigger Logic, Cables, Connectors and Adapters ~100 channels060.0 Oscilloscope TOTAL DAQ + Trigger~166 k€50 k€

MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 20 Summary  DATE software training has started with success  Interface between DDAQ and MCM is well defined  Trigger scheme is well defined  FE Electronics tests are late Flash ADC is OK in Principle BUT Energy resolution has to be evaluated Other options won’t be tested unless we find more man power  We plan to deploy the DDAQ system here in Mid June 2007