Mid Term Review Meeting, 26 September 2012E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.

Slides:



Advertisements
Similar presentations
EC -DG Research Dir. D : Human Factor, Mobility and Marie Curie Actions The provided information might still be revised TRAINING THE TRAINERS Initial training.
Advertisements

Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
OHT 14.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software quality infrastructure components The need for procedures and.
IT Workforce: A Global Perspective Dr. Muhammad Shafique Member Subcommittee on Human Resource Development.
Instructor: Tasneem Darwish1 University of Palestine Faculty of Applied Engineering and Urban Planning Software Engineering Department Software Systems.
Roles of IT Personnel Unit Customer Service This is a facility that helps customers with wide-ranging questions relating to a specific company,
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Dr. Tom WayCSC What is Software Engineering? CSC 4700 Software Engineering Lecture 1.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
S.Z. Pakuliak Active director of the JINR University Centre 107 th Session of the JINR Scientific Council, February 2010.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Probably one of the most incredible experiments in the world!
GETIR professional profile Final Conference GETIR project Timisoara, 18th December 2012.
GS Annual Training plan D. Klem Big picture D. Klem 2 Purpose of Training has twofolds As defined in the SR&R :(SII 3.01) ‘The purpose of training.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Mid Term Review Meeting, 26 September 2012P. FARANTATOS1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
AGH TRAINEE AT 01 JULY – 30 SEPTEMBER INTRODUCTION 1. CERN 2. Vacuum Group 3. ICM Section 4. My tasks 2Magdalena Karpiel.
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
TS, Length of YETS EYETS LIU & CONS Project
LPP-LDV-TOI-09-IT-0503 Project Presentation. LPP-LDV-TOI-09-IT-0503 What is the LeTS GO project? The LeTS Go project has been financed by the European.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE End of Project 15 TH SEPTEMBER 2012 This research project has been supported by a Marie.
Katharine Thomas-Chevreux Coordinator for Fellows HR Department 1Induction Programme Fellows at CERN Induction.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Adriana Telesca Mid Term Review 3 rd August 2010.
© 2010 VMware Inc. All rights reserved vSphere 4.1: Install, Configure, Manage.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Johannes Gutleber CERN Directorate of Accelerators & Technology September 22, 2015 H2020 EUCard3 Reliability & Availability Task RAMS Training Topic.
WP18: High-Speed Data Recording Krzysztof Wrona, European XFEL 07 October 2011 CRISP.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
ELOGMAR-M Review Meeting, Shenzhen, 31/03/ First Review Meeting - Web-based and Mobile Solutions for Collaborative Work Environment with Logistics.
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
Status of training program N. Catalán Lasheras
The European Network for Rural Development The Hungarian National Rural Network and their cooperation opportunities.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 Meeting with NuPECC 9 March 2006 Presentation by Daniel Pasini, DG Research.
Cern.ch/knowledgetransfer. Knowledge Transfer | Accelerating Innovation Giovanni Anelli, CERN KT Training,
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Slide 1 CATHI Training Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI kick-off meeting CERN 23 May 2011.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Mid Term Review Meeting, 26 September 2012A. Shornikov 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
Mid Term Review Meeting, 26 September * This research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the.
Development of CAD concept model of package transformer substation (PTS) Aleksandra Seledkova Perm National Research Polytechnic University.
European network for Health Technology Assessment | JA | EUnetHTA European network for Health Technology Assessment THL Info.
Philip Burrows TIARA Preparation Board, CERN, 2/11/091 TIARA WP5 Philip Burrows John Adams Institute for Accelerator Science Oxford University.
Philip Burrows TIARA Preparation Board, CERN, 14/10/091 TIARA WP5 preparation status Philip Burrows John Adams Institute for Accelerator Science Oxford.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
TIARA-PP Governing Council 1 representative per contractor TIARA-PP Coordinator Industry advisory committee? Project Management (WP1) Project Office Dissemination.
I. Bergevoet - Training preparation
STRATEGIC ACADEMIC UNIT “PEOPLE & TECHNOLOGIES”
ELACCO mid-term Review
Workpackage presentation (WP2 - Development of master curricula)
P.Fabbricatore (WP5 Coordinator)
Update on Spanish Recruitment: Students, Staff, Fellows, Associates
Development and Maintenance of CMS ElogBook
Presentation transcript:

Mid Term Review Meeting, 26 September 2012E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA CATHI) CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Eleftherios Zografos (EN/MEF)* WP4, ESR 5 Mid Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September 2012E.Zografos2 Outline  Background;  Activity at CERN;  Project Status and Achievement;  Training activities  Conclusions

Mid Term Review Meeting, 26 September 2012E.Zografos3 Background Studies  Production Engineering and Management Technical University of Crete  Diploma Thesis: Acceleration of a Differential Evolution Algorithm with the use of Artificial Neural Networks - Implementation in the Airfoil Shape Optimization.

Mid Term Review Meeting, 26 September 2012E.Zografos4 Background Professional Experience  NIKI MEPE, Greece: Apprenticeship  CAD, FEM, Technical Documentation  atec-innovation GmbH, Germany: Automotive Engineering  CAD  Modelling and Rapid Prototyping Technologies  Change Management  Data Management Bertrand AG Delphi Deutschland GmbH Dr. Ing. h.c. F. Porsche AG Daimler AG (Stationed in Mercedes Technology Center)  CERN, Switzerland, member of EN-MEF-INT

Mid Term Review Meeting, 26 September 2012E.Zografos5 EN-MEF-INT mandates  Engineering Department (EN): provides Engineering Competences, Infrastructure Systems and Technical Coordination for the design, installation, operation, maintenance and dismantling of the CERN accelerator complex and its experimental facilities.  Machines & Experimental Facilities Group (MEF) : is responsible for planning and coordinating all maintenance and installation activities in the CERN Accelerator Complex  Integration Section (INT): studies the layout and installation procedure of all machines and transfer lines.

Mid Term Review Meeting, 26 September 2012E.Zografos6 Personal mandate Domains of responsibility  The definition of the hardware baseline  Identification of Equipment and Technical Specifications  Creation and update of the machine layout  Complete 3D design of the accelerator  Layout database  The integration of the machine inside the equipped building  In cooperation with the services integrators provide a Complete 3D design of the facility  The configuration management  documentation and implementation of all proposed changes in the configuration of the machine

Mid Term Review Meeting, 26 September 2012E.Zografos7 Project Status 1 Hardware Baseline (Already uploaded in EDMS and SmarTeam)

Mid Term Review Meeting, 26 September 2012E.Zografos8 Project Status 2 Machine Layout

Mid Term Review Meeting, 26 September 2012E.Zografos9 Project Status 3 Integration in the building

Mid Term Review Meeting, 26 September 2012E.Zografos10 Training activities 1 Attended training courses  Accelerators technology AXEL: Introduction to Particle Accelerators;  Tools & Methods EDMS Local administration, SmarTeam, e-groups  Management & communication General and Professional French, Making presentations, Introduction to Project Management for young researchers  Safety Radiological Protection, Self-Rescue Mask (Biocell)

Mid Term Review Meeting, 26 September 2012E.Zografos11 Training activities 2 Future training activities  Secondment to Hydro Québec, Canada  CERN Accelerator School, Spain  Pursuit of a Masters Degree

Mid Term Review Meeting, 26 September 2012E.Zografos12 Conclusions An overall useful experience  Challenging beginning: new field, complicated task, wide range of responsibilities  Good working environment: really international, competent colleagues  Variety of training opportunities: technical, management, communication  Promotes personal and professional development

Mid Term Review Meeting, 26 September 2012E.Zografos13 Thank You