Practical Assessment Project Template

Slides:



Advertisements
Similar presentations
Project leader : Champion : Project Number / Phase : Revision / Date :
Advertisements

Lean Six Sigma Project Presentation Template
Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Project Storyboard Template
11-1 Quality Improvement Model Purpose: To provide a sequence of steps to improve any process so that the customers will realize the highest quality and.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Overview of Lean Six Sigma
6  Methodology: DMAIC Robert Setaputra. PDCA / PDSA PDCA / PDSA is a continuous quality improvement tool. PDCA is introduced by Shewhart. PDSA is Deming’s.
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
6 Sigma Hazırlayanlar : Emine Yılmaz Cansın Eminoğlu.
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
DMADV Review Template. 2 © LSSA 2010 DMADV Roadmap 10 steps model D M A D V 1 – Project Selection / Project Management 2 – Determine Functional Requirements.
Black Belt Project Storyboard Template
By: Nick Blank March 1, Six Sigma Definitions Goals History Methods Roles Benefits Criticism Software Development.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Items Required for Process Hand-off
Define Tollgate Checklist
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
Project Title GB or BB name: XYZ.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Project Storyboard (Page 1 of 2)
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Practical Assessment Project Template
General Guidelines for this Template Add the letter of the stage (DMAIC) you are in on EACH SLIDE. Don’t feel like you have to use the tools at the end.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
Practical Assessment Project Template – DMADV
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template

Lean Six Sigma Road Map Improvement Process Road Map
LEAN SIX SIGMA PROJECT TEMPLATE
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Improving Existing Products & Services
Control Phase Wrap Up and Action Items
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Practical Assessment Project Template
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
Lean Six Sigma DMAIC Improvement Story
GHSP Problem Solving Team Champion: Team Members: Team Mentor:
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Improve Phase Wrap Up and Action Items
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
DMAIC STANDARD WORK TEMPLATE
Measure Phase Wrap Up and Action Items
by Operational Excellence Consulting LLC
Practical Assessment Project Template – REV. 5.2
QMS, ISO and Six Sigma It’s all related…..
Lean-Green belt six sigma program
Practical Assessment Project Template – REV. 5.2
Practical Assessment Project Template – DMADV
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Practical Assessment Project Template Project title: <title of the project> Organization: <name of your organization> Project leader: <your name> Belt level: <Black or Green Belt> Revision date: <e.g. 28-09-2015> Practical Assessment Project Template Date: -

DMAIC Introduction for this template Objectives of this presentation: Certification by LSSA Project summary for your organization Guidelines: Methodology and logic understandable, for a Six Sigma trained external colleague Clear conclusions on each sheet Target for certification is max. 25 sheets (no limit for internal use) No back-up sheets Delete the (Italic) notes for the user, upon need Delete this slide before handing in.

DMAIC Process improvement roadmap DMAIC roadmap Define 1 Define and Scope project 2 Define defect and CTQs 3 Plan and document project Measure 4 Evaluate measurement system 5 Establish baseline 6 Set improvement goals Analyze 7 Map process and identify inputs 8 Isolate key inputs 9 Develop Y=f(X) function Improve 10 Determine optimum settings 11 Implement proposed improvement 12 Validate proposed improvement Control 13 Implement control strategy 14 Close out project

DEFINE 1 – Define and scope project Problem Description: What is wrong, how does it affect the customer, what is the pain for the organization? Is it a priority, so in line with top-down priorities? Add picture or drawing to explain (If ready, delete this textbox) Objectives: What do we want to achieve? Helicopter view description. (delete this textbox)

DEFINE 1 – Define and scope project Target: Describe the quantified, measurable result (not the solution!). What is the required timing? In Scope What are the boundaries of the process to analyze; what are you allowed to change? Out of Scope: What not . . . ? Deliverables: What evidence to put at the table to show that targets metrics are met? This is the key element in the agreement with the champion Hard Benefits: Summarize the calculation to shows that this is a ‘major cost saving or cost avoidance, in keuro/year. Upon need add a separate sheet Soft Benefits: Any nice additional benefits, like customer satisfaction, learning Six Sigma

DEFINE 2 - Define defects and CTQs Start from customer perspective ‘OK for customer’ Customer specification Internal specification This can be a vague description of the critical variable CTQ ext Variable: ……… Target: ………… Specifications: …… CTQ ext Describe the measurable variable and specifications as required by the customer. Variable: ……… Conditions: …… Target: ………… Describe the measurable variable and specifications as defined in own organisation. Can be different from the CTQext, but must have a known/proven relation with CTQext. CTQ int High level, describe until highest level measurable CTQ int. (the project target) Legend: solid line: proven relation dotted line: relation tbd. grey box: out of scope white box: potential CTQ, or group of CTQs

DEFINE 3 – Plan and document project Project Team Supplier: Champion: User: MBB: who provides resources driving for success will benefit from the results coach for methodology Project leader (Belt): Actively involved members in team meetings Name: Role: Responsibility:

DEFINE 3 – Plan and document project SIPOC is mandatory for process improvement For design improvement: visualize product problem area SIPOC Process Map Supplier: Inputs: Process: Outputs: Customers: ‘Process’ Controllable variables + specs Output variables Main noises Standard Operating Procedures If helpful show below detailed steps on the process Step 1 Step 2 Step 3 Step 4 Step 5

Self Assessment LSSA Assessor Feedback DEFINE Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Define 1 Project addresses a clear problem or business opportunity (€20,000.- p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been defined clearly. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been involved and informed. 7 Belt has shown to be able to manage the project adequately. 8 Project has been completed within time and budget.   Missing Incorrect Correct N/A Define 1 Project addresses a clear problem or business opportunity (€20,000.- p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been defined clearly. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been involved and informed. 7 Belt has shown to be able to manage the project adequately. 8 Project has been completed within time and budget.

MEASURE 4 – Evaluate measurement system For Target internal CTQ’s Evaluate whether measurement error for the CTQ int, described in the target is good enough for this project. e.g. reference data, GR&R, bias, attribute agreement, etc. Measurement error CTQ int Conclusion:

MEASURE 5 – Establish baseline How is the situation on the CTQ’s in the beginning of the project? (measured with the known error) e.g. results of capability & performance study If historical measurement error is unknown, add a note. Visualize if possible, for instance in time. Conclusion:

MEASURE 6 – Set improvement goals Final Target Evaluate whether the original target(s) are realistic. If necessary describe the rational why the targets are being adjusted. Conclusion:

Self Assessment LSSA Assessor Feedback MEASURE Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Measure 1 Relevant KPI's have been selected / CTQ-flowdown has been constructed. 2 High level process description has been made (e.g. SIPOC). 3 Data has been collected / selected properly. 4 The collected data has been proven to be representative for the project. 5 Quality of the data has been verified in an appropriate way (GR&R if applicable). 6 Historical data has been used to visualize performance over time (e.g. Time series). 7 Variation in the process has been considered (common cause or special cause). 8 Short term versus long term performance has been considered. 9 Performance against requirements has been checked (Ppk if applicable).   Missing Incorrect Correct N/A Measure 1 Relevant KPI's have been selected / CTQ-flowdown has been constructed. 2 High level process description has been made (e.g. SIPOC). 3 Data has been collected / selected properly. 4 The collected data has been proven to be representative for the project. 5 Quality of the data has been verified in an appropriate way (GR&R if applicable). 6 Historical data has been used to visualize performance over time (e.g. Time series). 7 Variation in the process has been considered (common cause or special cause). 8 Short term versus long term performance has been considered. 9 Performance against requirements has been checked (Ppk if applicable).

ANALYZE 7 – Map process and identify inputs Process Map Input variable 1 Input variable 2 ............. Use this format for process improvement For design improvement use Boundary Diagram or Parameter Diagram , for the applicable function(s) (process step 1) Input variable 1 Input variable 2 ............. …. Input variable 1 Input variable 2 ............. …. Input variable 1 Input variable 2 ............. (process step x) Output variable 1 Output variable 2 Output variable 3 ............. These should be the CTQ’s Conclusion:

ANALYZE 7 - Map process and identify inputs Create this diagram to complete and categorize the list of inputs Ishikawa Diagram Measurement Machine Men Advice: use Xmind or Freemind Defect Methods Environment Materials Conclusion:

ANALYZE 8 – Isolate key inputs If a large number of inputs is identified, it is important to limit the analysis to a small set of important (key)inputs. Tools include: Cause & effect matrix, screening (DOE), FMEA Conclusion:

ANALYZE 9 – Develop Y=f(X) function Tools: Anova, Regression, DOE, simulation, etc Conclusion:

Self Assessment LSSA Assessor Feedback ANALYZE Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Analyze 1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential root causes have been identified properly. 3 Data has been collected and analyzed correctly. 4 Graphical and statistical techniques have been applied to investigate root causes. 5 Major root causes have been identified. 6 Conclusions have demonstrated strong evidence / statistically valid.   Missing Incorrect Correct N/A Analyze 1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential root causes have been identified properly. 3 Data has been collected and analyzed correctly. 4 Graphical and statistical techniques have been applied to investigate root causes. 5 Major root causes have been identified. 6 Conclusions have demonstrated strong evidence / statistically valid.

IMPROVE 10 – Determine optimum settings DOE, simulation, etc Conclusion:

IMPROVE 11 – Implement proposed improvement Show a list of implemented improvements Conclusion:

IMPROVE 12 – Validate proposed improvement Show the verification run compared to baseline that the Define conditions will be met. Conclusion:

Self Assessment LSSA Assessor Feedback IMPROVE Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Improve 1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome / Risks have been mitigated. 4 Internal and external customers have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable).   Missing Incorrect Correct N/A Improve 1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome / Risks have been mitigated. 4 Internal and external customers have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable).

CONTROL 13 – Implement control strategy Show the verification run compared to baseline that the Define conditions will be met. Conclusion:

CONTROL 13 – Implement control strategy Open actions …. Documentation Component drawings Manufacturing specifications Control plan Engineering reports FMEA .. Roles & responsibilities Actions and owners necessary to finish this project How is assured that all information is well documented for future success What are the key roles & responsibilities to assure continued success

CONTROL 14 – Close out project Conclusions …. Recommendations Lessons learned Relate this to the project objective, targets and deliverables For follow-up, next steps, or next projects For colleagues, others

CONTROL 14 – Close out project The realized benefits of this projects are: Summarize final total savings, average per year Champion: Date, Name & Signature - Controller: Date, Name & Signature - LSSA MBB: Date, Name & Signature -

Self Assessment LSSA Assessor Feedback CONTROL Assessment Self Assessment LSSA Assessor Feedback   Missing Incorrect Correct N/A Control 1 Evidence of 'In-Control situation' available and sufficient. 2 Measures have been put in place to monitor process performance. 3 Documentation has been updated (pFMEA, CP, SOP's). 4 Training has been performed for the new process. 5 Improvements have proven to be sustainable. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 8 Controller signed that project savings / benefits have been achieved.   Missing Incorrect Correct N/A Control 1 Evidence of 'In-Control situation' available and sufficient. 2 Measures have been put in place to monitor process performance. 3 Documentation has been updated (pFMEA, CP, SOP's). 4 Training has been performed for the new process. 5 Improvements have proven to be sustainable. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 8 Controller signed that project savings / benefits have been achieved.