ECE 477 Design Review Group 2  Spring 2005. Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.

Slides:



Advertisements
Similar presentations
ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
Advertisements

ECE 477 Design Review Team 13  Spring 2006 Elmer Chao (not pictured), Matt Cozza (not pictured), Joe Waugh (not pictured), Evan Zelkowitz (not pictured)
ECE 477 Design Review Team 22  Txt Msg DJ Garrett Strzelecki Kyle Brown John Doherty Chris McCabe K.
ECE 477 Design Review Team 15  Spring 2013 Jackson McCormick, Andrew Batek, Carey Woolet, Justin Lindley.
ECE 477 Design Review Team 01  Fall 2012 Brennan Tran Jonah Ea Ben Pluckebaum Kevin Meyer.
ECE 477 Design Review Team 8 − Spring Names: Fabian W, Siddharth B, Vineeth H, Sriram R.
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
ECE 477 Design Review Team 13  Spring 2008 Paste a photo of team members here, annotated with names of team members. Srichand Varun Madhu Anvesh.
ECE 477 Design Review Team 7  Spring 2011 Paste a photo of team members here, annotated with names of team members. Stuart Pulliam Will Granger Linda.
ECE 477 Design Review Group 9  Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors.
ECE 477 Design Review Group 1  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 10  Spring 2012 Paste a photo of team members here, annotated with names of team members. Nathan Irvin Will Bouchonnet Allen.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Design Review – Spring 2010 Team 15. Team Members.
ECE 477 Design Review Team 6  Spring 2011 Left to right: Kirk Iler, Brian Bentz, Stephen Wolf, Fuhe Xu.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
ECE 477 Design Review Team 1  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger Formal Design Review.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 2  Spring 2010 Digi-Brush Josh LongCaleb Ayew-ewKatie Schremser.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 5  Fall 2007 Wes Chris Josh Dave.
Shiv Yukeun Donghan Robert.  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
ECE 477 Design Review Group 7  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
ECE 477 Final Presentation Team 16 − Spring 2013 Scott Stack Neil Kumar Jon Roose John Hubberts.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Design Review Team 01  Fall 2010 Jigar Gandhi Chandler Wall John-Taylor Smith Eric Zarowny.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 11  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 5  Fall 2009 Ben Carter – Jacqui Dickerson – Ian Oliver – Dennis Lee.
ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,
ECE 477 Design Review Team 2  Spring 2006 Prashant Grimella Andy Brezinsky Tim Sendgikoski Clark Malmgren.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
ECE 477 Design Review Team 1  Fall 2006 Sumanth Peddamatham Alex Tucker Chris Arges Radhika Mulani.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Design Review Team 02  Fall Outline Project overview - KProject overview - K Project-specific success criteria -KProject-specific success.
ECE 477 Design Review Team 3  Fall 2007 Steven Kingsley (Analog) Roy Scheck (Leader) Tony Liechty (Digital) Charles Lan (Software)
ECE 477 Final Presentation Group 2  Spring 2005 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 10  Spring 2007 JUSTIN AZAD AFIFF NUHAIRIADAM.
ECE 477 Design Review Team 7  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
Team /02/28 1. Chun Ta Huang Xirong Ye 2 Libo Dong Zongyang Zhu.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 1  Spring 2008 Alan BernsteinIan AlsmanIlya VeygmanDarshan Shah.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 12  Spring 2006 EricDaniel Atandra Sriharsha Aasenda Silva Burman Vengapaty.
ECE 477 Design Review Team 4  Spring 2006 Justin Thacker, Matt Kocsis, Ian Snyder, Dustin Poe.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
ECE 477 Final Presentation Group 2  Spring 2005
ECE 477 Design Review Team 21 - Spring 2013
ECE 477 Design Review Group 6  Fall 2005
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Team 14  Spring 2012
ECE 477 Design Review Team 5  Fall 2006
ECE 477 Design Review Team ??  Fall 2012
Presentation transcript:

ECE 477 Design Review Group 2  Spring 2005

Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria Block diagramBlock diagram Component selection rationaleComponent selection rationale Packaging designPackaging design Schematic and theory of operationSchematic and theory of operation Preliminary PCB layoutPreliminary PCB layout Software design/development statusSoftware design/development status Project completion timelineProject completion timeline Questions / discussionQuestions / discussion

Project Overview Home security/monitoring systemHome security/monitoring system Highly flexible and expandable systemHighly flexible and expandable system –swappable cards/expansion slots –I 2 C protocol Real time monitoring and alertsReal time monitoring and alerts –Status –Monitoring –Alerts

Project-Specific Success Criteria Ability to use a keypad to arm/disarm the system.Ability to use a keypad to arm/disarm the system. Ability to detect smoke, window breaks, doors opening, etc.Ability to detect smoke, window breaks, doors opening, etc. Ability to send calls as alerts if sensors are trippedAbility to send calls as alerts if sensors are tripped Ability for real time monitoring of system via InternetAbility for real time monitoring of system via Internet Ability to swap out the expansion modules.Ability to swap out the expansion modules.

Block Diagram

Component Selection Rationale Main MicrocontrollerMain Microcontroller Rabbit RCM3700Rabbit RCM3700 –External chip Ethernet –Confusing data sheets –Prior knowledge that Dynamic C is problematic Freescale 68H9S12NE64Freescale 68H9S12NE64 –Built in Ethernet hardware –i2c built in –Plenty of application guides and datasheets –All ANSI c coding –Excellent IDE for programming

Component Selection Rationale Module boardsModule boards Atmel ATMega88Atmel ATMega88 –Nice IDE –Cheaper microchip PIC18F2331microchip PIC18F2331 –Excellent application guides BothBoth –i2c built in –Plenty of flash and I/O –3.3v I/O

Component Selection Rationale Sensor SelectionSensor Selection –Many required 120vac –Many had proprietary interfacing GE Sensors (motion, shatter, intrusion)GE Sensors (motion, shatter, intrusion) –12v power supply –use standard relays, easy interfacing American Sensors (smoke)American Sensors (smoke) –120vac main power –Standard low voltage relay

Component Selection Rationale Power SupplyPower Supply Required VoltagesRequired Voltages –3.3v, 5v, 12v Required CurrentRequired Current –25ma/sensor, 56 max sensors –110ma/horn, 4 max horns 12v –285ma max, 3.3v –12ma/Atmel, 8 3.3v –20ma/sensor, 56 sensors max 3.3v Omron s82rOmron s82r –5v/12v 2A/2A

Packaging Design 1'x1'x6” 14 gauge steel box1'x1'x6” 14 gauge steel box Hinged and lockedHinged and locked Wall mountable, recessed designWall mountable, recessed design 20 in 2 for routing cables20 in 2 for routing cables External keypad mountExternal keypad mount

Schematic/Theory of Operation

Preliminary PCB Layout

Software Design/Development Status HTTP serverHTTP server –Theory –Status Current battle – Java AppletsCurrent battle – Java Applets Monitoring softwareMonitoring software –Theory I 2 C communicationI 2 C communication –Theory Child monitoring/keypad softwareChild monitoring/keypad software –Theory

Project Completion Timeline Mon Mar 7 – Submit case design for fabrication at the EE metal shopMon Mar 7 – Submit case design for fabrication at the EE metal shop Thurs Mar 10 – Board Layout dueThurs Mar 10 – Board Layout due Mon Apr 4 - All software in working condition on bread boardsMon Apr 4 - All software in working condition on bread boards Mon Apr 11 – Finish board assembly, begin testingMon Apr 11 – Finish board assembly, begin testing Mon Apr 18 – Finish testing, install in caseMon Apr 18 – Finish testing, install in case Sun Apr 24 – Complete video demoSun Apr 24 – Complete video demo

Questions / Discussion