P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG 904 40/60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

RPC calibration D. Piccolo INFN Napoli. Calibrations Electronic test –Channels check –Strip pattern for trigger check –Threshold test –Synchronization.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Link Board Upscope Frascati group Napoli group Warsaw group.
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
A. Cimmino - P. Paolucci - G. Polese / DCS meeting DQM tool for the DCS data What the RPC community needs: 1.Make online/offline DCS data.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
“Breve” stato dell’apparato: Risultati e Problemi Anton, Ian, Nicolas, Saleh, Salvatore Barrel Endcap Endcap Endcap Cooling Endcap Cooling Last Minute.
RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
Cables for the RE4 Upscope in CMS
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
RPC Barrel HV & LV system Lappeenranta University
Electronics for RPC Upscope
HV & LV status LV system in W+1 and W+2 is OK
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
RPC’s HV-LV project Introduction HV and LV requirements
RPC HV&LV systems Introduction Detector description Requirements
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
A. Boiano1, F. Loddo2, P. Paolucci1, D. Piccolo1, A. Ranieri2
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
The IFR Online Detector Control at the BaBar experiment at SLAC
Alfonso Boiano1, Flavio Loddo2, Pierluigi Paolucci1, Antonio Ranieri2
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Detector Control System: towards the final system
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
HV & LV status LV system in W+1 and W+2 is OK
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10  100% A3018 (T sens) 30/34  88% EASY crates 5/7  71% branch controllers 6 boards land to ALICE + 2 to the DT group

P. Paolucci - I.N.F.N. di Napoli 2 MTCC meeting May 06 BLG 904 test setup Hardware and Software Test 3 LV EASY Crate running  15 boards  180 channels 1 HV EASY Crate running  2 boards  12 channels 20 LV boards tested = 240 channels  2 broken (< 1%) 2 HV boards tested = 12 channels  OK Board Temperature went up to 60 °C due to a bad air circulation. Now fixed and temperature around 40 °C DCS is always running (see Giovanni Talk) LabVIEW (D. Lomidze) test program is under installation for more than 900 hours

HV 24 ch – HV - Barrel HV HV-LV schema for MTCC MAJISTE HV service Balcony BarackDetector W+2 W+1 RPC LV phase trigger LV RPC LV trigger LV BC HV SY1527 BC LV BC LV PP service control PP MAO Rpc-dt service control HV multicond. 10 ch. 48 V - service MAO rpc-dt phase HV 24 ch – HV - Endcap HV BC LV Control cable

copper HV Return Double Gap 1 Double Gap 2 Copper 2Copper 1 IRON – MAGNET safety ground Rack LV ALV1 shield From LV power supply with floating output DLV1 ALV2 DLV2 AGND1 DGND1 AGND2 DGND2 ALV AGND DLV DGND chip FEB 1 chip FEB 6 chamber GND AGND Chamber metallic structure shielded cable FEB strip kapton AGND chip AGND DGND LV distrib. board 4 pairs RPC ground schema

HV 24 ch – HV - Barrel HV Ground schema for MTCC MAJISTE HV service Balcony BarackDetector W+2 W+1 EASY LV phase Link Box RPC LV trigger LV BC HV SY1527 BC LV BC LV PP service control PP MAO Rpc-dt service control HV multicond. shielded 10 ch. 48 V - service MAO rpc-dt phase HV 24 ch – HV - Endcap HV BC LV Control shielded cable GND Iron EARTH rack LV EARTH rack GND reference on the chamber

P. Paolucci - I.N.F.N. di Napoli 6 MTCC meeting May 06 MTCC status LV hardware is ready for Barrel and Endcap HV hardware ready for May the 22 th LV LB hardware now at blg 904 LV EASY crates installation on the balconies started on May the 9 th. Crate insertion in the rack is difficult No space around the racks Balcony barrack 3-phase installation is underway

P. Paolucci - I.N.F.N. di Napoli 7 MTCC meeting May 06 MTCC status HV multicond. cables 3 barrel cables are ready and have been tested by myself at CPE 2 endcap cables are in construction at CPE They will be sent at CERN on May 12 th to be installed on May 22 th Local EASY cables will be ready for May 22 th Service and Control long cables ready on May 22 th

P. Paolucci - I.N.F.N. di Napoli 8 MTCC meeting May 06 To be done LV hardware is ready for Barrel and Endcap HV hardware ready for May the 22th LV EASY crates installation on the balconies started on May the 9th. Crate insertion in the rack is difficult No space around the racks Balcony barrack 3-phase installation is underway

P. Paolucci - I.N.F.N. di Napoli 9 MTCC meeting May 06 RPC DCS for MTCC

P. Paolucci - I.N.F.N. di Napoli 10 MTCC meeting May 06 To be done for MTCC Move to RPC condition db on SX5 and test the performance. Release the CMS_RPCfwHardware Component Help our Warsaw friends, creating a control and monitoring system of the LB low voltage, and integrate it into the RPC DCS. Do we want to integrate it in the FSM ?? It will be also discussed tomorrow in the DCS working group. Test all the system when the hardware will be ready at SX5 (June 06). Write documentation and organize training in order to have more people ready to take data.