Institutional Arrangement for CDM: Case of Peru Case of Peru First Extended Regional Workshop CD4CDM Project Siem Reap, Cambodia 24- 26 March 2004 Sami.

Slides:



Advertisements
Similar presentations
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
Advertisements

María Paz Cigarán National Council for the Environment (CONAM) December 2003 Institutional Framework for the Clean Development Mechanism Implementation.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
ASEAN CLIMATE CHANGE INITIATIVE Presented by: Liana Bratasida.
CDM DESIGNATED NATIONAL AUTHORITY Costa Rican Case.
Climate Change Related Activities in Cambodia
Page 1 Regional Institutional Capacity Building in the Implementation of Clean Development Mechanism in ASEAN Countries March 2004 Jakarta, Indonesia.
CDM Issues and Capacity Building Program of Japan Regional Workshop and Training on “Capacity Development for the Clean Development Mechanism” November.
Republic of Macedonia and Climate Change Teodora O. Grncarovska, M.Sc, UNFCCC Focal Point.
Implementation of Capacity Development for CDM Project in Viet Nam Nguyen Khac Hieu Climate Change Coordinator Vietnam National Office for Climate Change.
Regional Programms Climate Change Mitigation Alexandra Soezer Carbon Technical Advisor Bonn, March 24 th 2012.
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
Capacity Development Work plan for the Clean Development Mechanism in Uganda ROLES AND COMPOSITION OF THE DESIGNATED NATIONAL AUTHORITY (DNA) Presented.
DNA- Peru’s Framework CENTRE Njeri Wamukonya. CENTRE Demonstrate with a real case what countries may wish to take into account when establishing DNA Aim.
1 Capacity Development for the Clean Development Mechanism CD/CDM Project Morocco Ali Agoumi National coordinator Bonn - SB18-June 2003 KINGDOM OF MOROCCO.
Overview Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO.
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
CDM strategies to incorporate the developmental priorities and technological need: China Experience Cui Cheng Energy Research Institute National development.
INTRODUCTION TO PLANNING OUTLINE CAPACITY DEVELOPMENT TO IMPLEMENT CDM IN VIETNAM Dr. Bui Huy Phung National Centre for Natural Science & Technology Mr.
CDM National Authorities : an Example Prepared for the National Workshop on Capacity Development for Clean Development Mechanism (CD4CDM) March 2003,
CAPACITY BUILDING ON CLIMATE CHANGE IN UZBEKISTAN: monitoring and evaluating The Centre of Hydrometeorological Service at the Cabinet of Ministers of the.
“Establishment of the Clean Development Mechanism (CDM) National Authority, Operational Framework and Support Systems for the Philippines”
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth Power-Gen PAK rd International Conference.
| Regional Workshop on CDM and NAMAs for Latin America and the Caribbean Roles and Structure of Designated National Authorities (DNAs) Bogota, Colombia.
Climate Change and CDM in Thailand
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
Robust institutional arrangements for national mitigation efforts Karen Holm Olsen & Miriam Hinostroza Low Carbon Development Programme UNEP DTU Partnership.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
Institutional Arrangement for CDM: Case of Peru Case of Peru Regional Meeting for DNAs CD4CDM Project Marrakech, Morocco 23 April 2004 Sami Kamel UNEP.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
ECONOLER INTERNATIONAL CDM/JI Office Canada Development of a Portfolio of CDM Projects in Indonesia Access to CDM & JI office of Canada facility Presented.
1 Overcoming Challenges in Preparation and Implementation of NAMAs Kigali, 17 th August 2015 African Regional Workshop on NAMAs.
CDM Status in Pakistan Dr. Syed Sajidin Hussain Clean Development Mechanism Cell Ministry of Environment, Government of Pakistan
1 Asian Regional Workshop on “Capacity Development for the Clean Development Mechanism” October 2005 AIT, Bangkok, Thailand Institutional Building:
Proposed plan to implement Capacity Development for CDM project in the forthcoming period Dr. DAO DUC TUAN Eng. NGUYEN KHAC HIEU National Office for Climate.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
The First Carbon Exhibition in North Africa and Middle East Region Jerba, September 2004 CDM-Morocco: Strategy, Organization, Procedures Organization,
Regional Workshop on CDM and NAMAs for Latin America and the Caribbean Bogotá, Colombia 31 August – 2 September, 2014 Challenges faced in the process of.
IGES-URC Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism March 2004 Siem Reap, Cambodia CDM INSTITUTIONAL FRAMEWORK.
Prasetyadi Utomo Ministry of Environment of Indonesia CD4CDM Workshop Pathumthani, Thailand 19 – 21 October, 2005 Indonesia’s Policy on CDM Implementation.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Overview of Capacity Development for CDM Project (CD4CDM) Jerba CDM Investment Forum, September 2004 Sami Kamel UNEP RISOE Center, Denmark.
SEVERAL ISSUES OF CAPACITY BUILDING FOR CDM IN RESEARCH AGENCIES AND UNIVERSITIES Mr. Nguyen Mong Cuong Institute of Meteorological and Hydrology Mr. Bui.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Pakistan National Operational Strategy for Clean Development Mechanism.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt December Capacity Development for.
Background very brief summing up of the NSS conclusions Background very brief summing up of the NSS conclusions Dr. Elewa.
July 3 – 4, 2003, Szentendre Dr. Valdemars Scerbaks MSc Peteris Blumats.
Regional workshop on Climate Change in south and southeast asia on 7-9 Aug 2006, Dhaka, Bangladesh Climate Change issues in Laos Immala INTHABOUALY Department.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
GOVERNMENT OF PAKISTAN MINISTRY OF ENVIRONMENT PRESENTATION TO ENVIRONMENTAL INITIATIVES AND UNFCCC IMPLEMENTATION IN PAKISTAN.
CAPACITY DEVELOPMENT FOR CDM IN VIET NAM Presented by Nguyen Mong Cuong Project CD4CDM - Viet Nam Outline  Overview of project  Project activities and.
ESTABLISHMENT OF THE CLEAN DEVELOPMENT MECHANISM (CDM) NATIONAL AUTHORITY, OPERATIONAL FRAMEWORK AND SUPPORT SYSTEMS FOR THE PHILIPPINES Establishment.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia Review and Future Plan of.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
The Second Regional Workshop on capacity development for Clean Development Mechanism Siem Reap, Cambodia, March 2004 REVIEW AND FUTURE PLAN OF TASK.
Capacity Development for the Clean Development Mechanism in the PHILIPPINES STATUS REPORT Asian Regional Workshop 16 th January 2003 Phuket, Thailand.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt December Capacity Development for.
Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January Samir Amous, APEX, Tunisia Regional Centre for.
CDM Development in Thailand Capacity Development for the Clean Development Mechanism Office of Natural Resources & Environmental Policy and Planning (ONEP)
1 Introduction to UNEP/ UCCEE Project on Capacity Development for CDM Asian Institute of Technology, Thailand 10 December 2002 Manila, Philippines.
Ecuador frente al mercado global de carbono CD4CDM in Ecuador CD4CDM side event at CoP-10 Buenos Aires, 11/XII/2004 Marcos Castro Ecuadorian CDM Promotion.
Introduction to UNEP/ UCCEE Project on Capacity Development for CDM Asian Institute of Technology, Thailand 27 Nov Hanoi, Viet Nam.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
Second SSA Regional Workshop on “Capacity Development for the Clean Development Mechanism” Organized by: Energy Research Centre (ERC), South Africa and.
16-18 January 2003, Phuket, Thailand
Cambodia National Work Plan
Presentation transcript:

Institutional Arrangement for CDM: Case of Peru Case of Peru First Extended Regional Workshop CD4CDM Project Siem Reap, Cambodia March 2004 Sami Kamel, PhD UNEP RISOE Center, Denmark

2Background This presentation based on the results of the study: "Peru's Institutional Strategy to Promote the Clean Development Mechanism" (2004). This presentation based on the results of the study: "Peru's Institutional Strategy to Promote the Clean Development Mechanism" (2004). Authors Maria Paz Cigaran and Particia Iturregui, staff members of Peru's DNA. Authors Maria Paz Cigaran and Particia Iturregui, staff members of Peru's DNA. Study sponsored by UNEP RISOE Center as part of analytical work implemented under CD4CDM Project. Study sponsored by UNEP RISOE Center as part of analytical work implemented under CD4CDM Project. Purpose of study to present and disseminate Peru’s institutional CDM experience among other developing countries. Purpose of study to present and disseminate Peru’s institutional CDM experience among other developing countries.

3 Country Context Highest environmental authority is CONAM (National Council for the Environment) est. 1996: Highest environmental authority is CONAM (National Council for the Environment) est. 1996: Reports directly to Prime Minister’s office. Reports directly to Prime Minister’s office. An Environmental Affairs Office established in each ministry to strengthen issue of environment within operations of each ministry. An Environmental Affairs Office established in each ministry to strengthen issue of environment within operations of each ministry. All offices report to CONAM and operate under its directives. All offices report to CONAM and operate under its directives. They submit proposals for emission reductions, and perform quality assurance/approve EIAs. They submit proposals for emission reductions, and perform quality assurance/approve EIAs. All energy, mining, industrial processes, transport, infrastructure projects are required to submit an EIA for approval. All energy, mining, industrial processes, transport, infrastructure projects are required to submit an EIA for approval. FDI laws designed with various types of incentives to attract foreign investors. Allow for free access to local financing sources, free flow of profits and dividends. FDI laws designed with various types of incentives to attract foreign investors. Allow for free access to local financing sources, free flow of profits and dividends.

4 Continue: Country Context Climate Change a priority in government’s environmental agenda: Climate Change a priority in government’s environmental agenda: Political commitment to play a proactive role in CC and CDM negotiations. Political commitment to play a proactive role in CC and CDM negotiations. The National Strategy on Climate Change (mitigation, adaptation, & CDM) was incorporated into the National Environmental Plan in October The National Strategy on Climate Change (mitigation, adaptation, & CDM) was incorporated into the National Environmental Plan in October Regional governorates are required to formulate and approve climate change strategies. Regional governorates are required to formulate and approve climate change strategies. Submitted First National Communication to UNFCCC June Submitted First National Communication to UNFCCC June Peru ratified Kyoto Protocol September Peru ratified Kyoto Protocol September 2002.

5 Peruvian National Strategy Study (NSS) Implemented by World Bank, Swiss and national experts: Implemented by World Bank, Swiss and national experts: Assessed potential for CDM in the country. Assessed potential for CDM in the country. Identified a pipeline of 25 CDM projects: Identified a pipeline of 25 CDM projects: Feasibility study (3), Pre-feasibility (9), Project Profile (7), PIN (6). Feasibility study (3), Pre-feasibility (9), Project Profile (7), PIN (6). Energy, transport, LULUCF, solid waste, and industrial processes projects. Energy, transport, LULUCF, solid waste, and industrial processes projects. Proposed a national CDM strategy. Proposed a national CDM strategy. Created awareness & experience in project preparation among local CDM stakeholders during the preparation of the NSS. Created awareness & experience in project preparation among local CDM stakeholders during the preparation of the NSS.

6 Strategic Considerations When designing the national CDM strategy, Peru took into consideration: When designing the national CDM strategy, Peru took into consideration: Latin American countries have relatively high marginal abatement costs compared to Asian countries like India and China, two potential major CDM players. Latin American countries have relatively high marginal abatement costs compared to Asian countries like India and China, two potential major CDM players. In Peru, energy sector makes substantial use of hydropower & less dependent on carbon than many Asian countries. In Peru, energy sector makes substantial use of hydropower & less dependent on carbon than many Asian countries. Other Latin American countries have good experience in GHG market (75% of carbon financial flows for CDM in 2001/2002 were allocated to Latin America). Other Latin American countries have good experience in GHG market (75% of carbon financial flows for CDM in 2001/2002 were allocated to Latin America). At U$4 per tCO2, Peru has potential for exporting CERs worth U$5- 10 million per year (including LULUCF projects) through two to five projects per year, depending on size of projects. At U$4 per tCO2, Peru has potential for exporting CERs worth U$5- 10 million per year (including LULUCF projects) through two to five projects per year, depending on size of projects.

7 Continue: Strategic Considerations Peru should offer “Unique Window” where all CDM government issues be covered by only one state authority. Peru should offer “Unique Window” where all CDM government issues be covered by only one state authority. National CDM project approval process should be transparent with full public and private participation. National CDM project approval process should be transparent with full public and private participation.

8 CDM Project Approval Participants For CDM project approval, an Ad Hoc committee is formed per project- basis (meets only when there is a project to approve): For CDM project approval, an Ad Hoc committee is formed per project- basis (meets only when there is a project to approve): Permanent committee members: Permanent committee members: National Council for the Environment (CONAM) – DNA. National Council for the Environment (CONAM) – DNA. National Environment Fund (FONAM). National Environment Fund (FONAM). State Office for Promotion of Private Investment (ProInversion). State Office for Promotion of Private Investment (ProInversion). Ministry of Foreign Affairs. Ministry of Foreign Affairs. International Cooperation Agency. International Cooperation Agency. Project-related committee members: Project-related committee members: Line-ministry related to project sector. Line-ministry related to project sector. NGO (from project locality). NGO (from project locality). National EIA expert. National EIA expert. Other national expert(s) as needed. Other national expert(s) as needed.

9 National Council for the Environment (CONAM) Roles & Responsibilities: Peruvian Designated National Authority (DNA). Peruvian Designated National Authority (DNA). Hosts the Climate Change Unit (& national CDM office): Hosts the Climate Change Unit (& national CDM office): Monitor & register CDM activities in the country. Monitor & register CDM activities in the country. Follow up and comply with EB decisions. Follow up and comply with EB decisions. Devise actions to overcome barriers to CDM. Devise actions to overcome barriers to CDM. Produced the First National Communication for the UNFCCC. Produced the First National Communication for the UNFCCC. Issues CDM project approvals: Issues CDM project approvals: Possible Conflict of Interest if CONAM also promotes CDM Projects; task assigned to the Private Sector Investment Authority (Proinversion). Possible Conflict of Interest if CONAM also promotes CDM Projects; task assigned to the Private Sector Investment Authority (Proinversion).

10 National Environment Fund (FONAM) Roles and Responsibilities: Organizes and coordinates with CONAM national CDM capacity building activities: Organizes and coordinates with CONAM national CDM capacity building activities: Trained 55 people in different entities on developing PINs. Trained 55 people in different entities on developing PINs. Assists CDM project participants in pre-investment phase of CDM projects (identification, preparation, and data gathering). Assists CDM project participants in pre-investment phase of CDM projects (identification, preparation, and data gathering). Permanente member of all CDM Project Approval Committees. Permanente member of all CDM Project Approval Committees. National Focal Point for the Prototype Carbon Fund (PCF). National Focal Point for the Prototype Carbon Fund (PCF).

11 State Office for Promotion of Private Investment (ProInversion) Roles & Responsibilities: Promotion & marketing of Peruvian CDM projects through various channels. Promotion & marketing of Peruvian CDM projects through various channels. Act as the first window for international CDM investors interested in projects in Peru. Act as the first window for international CDM investors interested in projects in Peru. Identify & remove barriers to CDM project implementation and approval: Identify & remove barriers to CDM project implementation and approval: Organize capacity building programs for local private sector and project financing entities. Organize capacity building programs for local private sector and project financing entities. Voice the demands of local private sector in international CDM negotiations. Voice the demands of local private sector in international CDM negotiations. Work on incorporating CDM promotion strategies within the national Foreign Direct Investment (FDI) promotion plan. Work on incorporating CDM promotion strategies within the national Foreign Direct Investment (FDI) promotion plan.

12 Project Approval Procedure Procedure Responsible Party 1. Submit PDD & request national approval letter (PIN is optional) CDM Investor 2. PDD sent to all members of Ad Hoc CDM Project Committee DNA 3. Visit project location/interviews. Produce a report on sustainable development & locals’ opinion DNA 4. Call & hold the Ad Hoc CDM Project Committee meeting DNA 5. Committee meeting: Assess contribution to sustainable development (case by case analysis) & interview the investor Ad Hoc CDM Committee 6. Letter of Approval issued for investor & Executive Board DNA/CDM Committee Total Approval Process: 45 days Cost per project: $4,800

13 Incentives for CDM Investors A 45 days self-imposed deadline for completion of approval process (no specific penalty for delays). A 45 days self-imposed deadline for completion of approval process (no specific penalty for delays). Approval process (costing $4,800) is free of charge to minimize transaction cost: Approval process (costing $4,800) is free of charge to minimize transaction cost: Each concerned entity cover its own share of the cost for approval (67% covered by DNA). Each concerned entity cover its own share of the cost for approval (67% covered by DNA). Decision to be re-visited once Peru establishes its name as a CDM destination. Decision to be re-visited once Peru establishes its name as a CDM destination. Promote small social investment in project locality: Promote small social investment in project locality: Improves sustainable development prospects Improves sustainable development prospects Improves likelihood for approval by national CDM committee & EB. Improves likelihood for approval by national CDM committee & EB. Three to four CDM projects were approved using this process. All approvals completed within the 45 days deadline. Three to four CDM projects were approved using this process. All approvals completed within the 45 days deadline.

14 Key Challenges Complying with self-imposed 45 days deadline while securing full involvement of relevant entities (the more entities involved, the more likely the potential delay in the approval): Complying with self-imposed 45 days deadline while securing full involvement of relevant entities (the more entities involved, the more likely the potential delay in the approval): CONAM circulated and approved a National CDM Operational Procedure among all relevant ministries & stakeholders. CONAM circulated and approved a National CDM Operational Procedure among all relevant ministries & stakeholders. CONAM having an office in each line-ministry facilitates project approval process. CONAM having an office in each line-ministry facilitates project approval process. CONAM continuously holding various workshops and meetings to raise awareness among relevant stakeholders. CONAM continuously holding various workshops and meetings to raise awareness among relevant stakeholders.

15 Continue: Key Challenges Lack of CDM project formulation capabilities among public and private sector entities. Lack of CDM project formulation capabilities among public and private sector entities. Approach adopted by the government? Approach adopted by the government? Trained 20 national experts from industry, energy, waste management, agroforestry, and transportation sectors on CDM project structuring and formulation. Trained 20 national experts from industry, energy, waste management, agroforestry, and transportation sectors on CDM project structuring and formulation. Financing institutions received special training on evaluation of CDM projects. Financing institutions received special training on evaluation of CDM projects. Two key objectives for the government: Two key objectives for the government: Build local project formulation capacities in strategic CDM sectors. Build local project formulation capacities in strategic CDM sectors. Reduce local transaction cost through smooth and simple project approval process. Reduce local transaction cost through smooth and simple project approval process.

16 A Responsive Setup for DNA CONAM continuously assessing adequacy of current institutional setup and project approval process. CONAM continuously assessing adequacy of current institutional setup and project approval process. Portion of project approval cost covered by DNA is from CONAM budget. Portion of project approval cost covered by DNA is from CONAM budget. If number of projects increases beyond DNA capacity: If number of projects increases beyond DNA capacity: CONAM will allocate separate budget for DNA. CONAM will allocate separate budget for DNA. Will charge a fee for the 45 days-approval. Will charge a fee for the 45 days-approval. Will hire external consultants to review and assess submitted CDM projects to facilitate work of ad hoc committee. Will hire external consultants to review and assess submitted CDM projects to facilitate work of ad hoc committee.

17 Conclusion & Lessons Learned Key ingredients for a successful CDM sector in a host country: Key ingredients for a successful CDM sector in a host country: Political will within the government. Political will within the government. Clear & adequate institutional & regulatory arrangement for CDM. Clear & adequate institutional & regulatory arrangement for CDM. Requirements for compliance of CDM projects with national environmental & sectoral planning should be simplified to facilitate project approval process. Requirements for compliance of CDM projects with national environmental & sectoral planning should be simplified to facilitate project approval process. A host country should aim at minimizing local transaction costs. A host country should aim at minimizing local transaction costs. Local financial sector could play key role in CDM projects (core-financing portion). Local financial sector could play key role in CDM projects (core-financing portion).

18 Continue: Conclusion & Lessons Learned A host country should market its CDM projects to a diversified market and not to rely completely on one potential CERs buyer (e.g. PCF). A host country should market its CDM projects to a diversified market and not to rely completely on one potential CERs buyer (e.g. PCF). Operation of the DNA needs to be frequently assessed to maintain an efficient local CDM process. Operation of the DNA needs to be frequently assessed to maintain an efficient local CDM process. DNA budget could be initially covered by government but later a DNA should generate some sort of income. DNA budget could be initially covered by government but later a DNA should generate some sort of income.

19 Peruvian DNA web site for more information: